SOW - EHRM Tier 2 - Chillicothe.docx
DOCX document 44 KB Posted
- Attached to
- 538-21-705 VA A-E Design Project EHRM Data Center Tier 2 Chillicothe Federal contract opportunity
- Solicitation number
- 36C77623R0011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW Attachment 04 - Chillicothe VAMC Assessment Recommendation 20180803 EDICT Report.pdf | ||
| SOW Attachment 02 - VA OEHRM Site Infrastructure and EUD Reqs - Version 2.0.pdf | ||
| SOW Attachment 03 - SOCAMES 6 Design Alert 1 - 7.pdf | ||
| SOW Attachment 01 - VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification FOUO.pdf | ||
| SOW Attachment 00 - VHA Directive 1061.pdf | ||
| SF330 Attachment 08 - Past Performance Questionnaire - Chillicothe EHRM Tier 2.docx | DOCX document | |
| SOW Attachment 09 - VHA Supplemental Contract Requirements for Combatting COVID.docx | DOCX document | |
| SF330 Request - Chillicothe EHRM Tier 2.docx | DOCX document | |
| SOW Attachment 07 - Seasonal Influenza with Vaccines.pdf | ||
| SOW Attachment 06 - PG 18-15 AE Submission Reqts Vol C.doc | DOC document | |
| SOW Attachment 05 - 01 32 16.01 EHRM Arch and Eng CPM Schedule Spec.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 538-21-705 EHRM Infrastructure Upgrades – Tier 2 - Chillicothe, OH
Project Design Scope of Work
1. GENERAL INTENT: The Contractor (herein referred to as “A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at Chillicothe VA Medical Center in accordance with this design scope of work.
2. STATEMENT OF WORK: A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, conduct of studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project.
This project is located in Building 18 (built in the 1920’s) which houses the VA Police Department, Office of Information Technology (including the Main Computer Room - MCR) and other miscellaneous office space. The MCR is located on the 2nd level of the 3 story building.
The main goal of this project is to update the conditions of the building as it relates to the server room functions and the nationwide Electronic Health Records Management (EHRM) program.
This project shall remove the (2) existing 10-ton Liebert HVAC units that serve the MCR and replace them with new units. There is also (2) existing Stultz air cooled exterior condensing units and (2) interior 5-ton downdraft a/c units located on raised computer flooring that serve the MCR to remain. This project shall maintain the direct digital control (DDC) sequencing that is already in place for the existing units. That DDC includes lead-lag sequences and also damper activations that work with the existing dry type fire suppression system. The design shall consider the current space of the 1st floor mechanical room that houses these Liebert units and determine if the unit layout can be modified to use the space more efficiently to better accommodate preventative maintenance tasks. The design shall account for the need to maintain proper cooling levels in the MCR during construction.
Below the MCR (on the basement level) is the Telephone Equipment room. This room, as well as other rooms in the basement, have had long-standing issues with water infiltration. This project shall investigate and solve those issues.
There are (2) other projects in this area that will be either in design or construction at the time of design as follows:
538-21-701 EHRM Infrastructure Upgrades – Tier 1. This project addresses many of the overall VA OIT requirements in the server room such as rack locations, rack cooling schemes, redundant utilities, etc. It also addresses many other issues related to Telecommunication Rooms (TR) in B18 and all other buildings on station.
538-21-706 EHRM Infrastructure Upgrades – Data Center Tier 1. This project addresses the overall hvac capacity of the server room as well as some electrical components for EHRM equipment. This project puts into service (2) new Stultz air cooled exterior condensing units and (2) interior 5 ton downdraft a/c units located on raised computer flooring
This design shall include review of a 2018 assessment (EDICT Report) that included this building and determine if there are any other open issues as it relates to building 18 after this project scope and the scope of the other (2) EHRM projects have been designed/constructed.
A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 2 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance in the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. Commissioning for this project will include witnessing the ddc sequencing and functioning as well as confirming proper manufacturer startup of new equipment and review of startup documentation. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction.
The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. Copies of Chillicothe VAMC record drawings and the EHRM infrastructure readiness assessment documents will be made available for A/E use; the A/E will verify the validity of the record drawings prior to the start of design work and conduct site investigations as necessary throughout the design.
The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project.
3. DESIGN WITHIN FUNDING LIMITATIONS: The design shall be prepared by the A/E so as to permit the award of a construction contract, using Federal Acquisition Regulation procedures for the construction of the facilities, at a cost that does not exceed the project’s estimated construction contract price of $750,000.00.
4. DESIGN INDEPENDENCE, FURNITURE AND EQUIPMENT: Designs for construction must produce a “complete and usable” facility or improvement when constructed. VA policy (VHA Office of Capital Assets Management, Engineering and Support memo Updated Construction Guidance and Expectations dated Sep 12, 2016) requires the A/E to certify that their design (including all bid alternates/bid deducts) is independent of any future construction project. In addition, the A/E must certify that it has produced a design that does not include furniture and equipment that will be procured separately. Equipment that can be part of the design includes those items to meet code requirements for building occupancy, items covered in the VA’s Master Construction Specifications (PG-18-1) Divisions 1 through 10, 13 through 26 or 28 through 48, non-IT equipment items covered by Division 27 and items covered by Division Numbers 12 31 00, 12 32 00, 12 34 00 and 12 36 00.
The A/E shall submit as part of the Final Bid Documents submittal a signed letter on company letterhead stating the design’s independence.
5. DESIGN CRITERIA: The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the following listed Department of Veterans Affairs References, with special emphasis on items in bold:
| PG-18-1 |
| Master Construction Specifications |
| PG-18-3 |
| Design and Construction Procedures [Including but not limited to: Codes, Standards, and Executive Orders] |
| PG-18-4 |
| Standard Details and CAD Standards |
| PG-18-5 |
| Equipment Guide List |
| H-18-8 |
| Seismic Design Handbook |
| PG-18-9 |
| Space Planning Criteria |
| PG-18-10 |
| Design Manuals (by discipline) [Including but not limited to: Guiding Principles checklists as indicated for Minor Projects in Sustainable Design Manual, Life Cycle Cost Analysis] |
| PG-18-12 |
| Design Guides (graphical, by function) |
| PG-18-13 |
| Barrier Free Design Guides |
| PG-18-14 |
| Room Finishes, Door, and Hardware Schedules |
| PG-18-15 |
| Minimum Requirements for A/E Submissions |
| PG-18-17 |
| Environmental Compliance Manual |
| H-7545 |
| VA Cultural Resource Management Procedures |
The following references should also be used to complete the design documents:
· VA Standards Alert 017 – Infrastructure Standards for Telecommunications Spaces and all standards, guides, and manuals incorporated by reference (https://www.cfm.va.gov/til/sAlert/sAlert017.pdf)
· 00 VA OEHRM Site Infrastructure Requirements v2.0 (attached)
· SOCAMES 6 Design Alert 1 (attached)
· VHA Directive 1061 Prevention of Healthcare-Associated Legionella Disease and Scald Injury From Potable Water Distribution Systems
Where conflicts exist between VA adopted codes and standards and the documents on the TIL, the A/E shall bring this to the attention of the VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure consistency department wide.
6. DESIGN COLLABORATION: The A/E during this design project shall collaborate with the VHA Office of Healthcare Environment and Facilities Programs Special Engineering Program (HEFP/SEP) staff, VISN 10 and the Independent Life Safety Review Agent (LS Agent) for the project. Design submittal comments from these contractors, if concurred with by VA, shall be incorporated into the design. HEPF/SEP and/or VISN deliverables shall be coordinated with the A/E’s design submittals to ensure compliance with all requirements are met. The A/E is required to ensure all elements of the design adhere to the Life Safety Code, including recommendations for temporary construction barriers, prior to the Independent Life Safety review.
7. INDEPENDENT LIFE SAFETY REVIEW: The A/E shall incorporate any comments from the VA 3rd party life safety review.
8. ENVIRONMENTAL PROTECTION: The A/E shall assist the VA with completion of a National Environmental Policy Act (NEPA) assessment as required by the Chillicothe VAMC. If the NEPA assessment results in potential environmental impacts, the A/E shall be responsible for completing any auxiliary documentation required per PG-18-17 NEPA Interim Guidance for Projects located on the TIL (http://www.cfm.va.gov/til/etc/NEPAGuidance.pdf). Additional requirements may include, but are not limited to, Environmental Assessment, Environmental Impact Statement, and Record of Decision. The NEPA analysis and concluding documentation must be completed by the Final Bid Documents submittal.
9. PHYSICAL SECURITY: It is not anticipated that a Physical Security Specialist is required for this project.
10. SUBMITTAL REQUIREMENTS: Design submittals shall follow the requirements of Program Guide, PG-18-15, Volume C - A/E Submission Instructions for Minor and NRM Construction Program dated November 2008. This document is available on the TIL at http://www.cfm.va.gov/til/aeDesSubReq.asp. Submittal documents shall be prominently marked “For Official Use Only (FOUO)” if they contain qualifying data as defined in VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO). This memo is attached to this SOW as it is hosted on a non-public VHA site (https://vaww.va.gov/vhapublications/ViewPublication.asp?pub_ID=8949).
The A/E shall deliver design submittal documents that follow the iterative phase breakdown for design work in PG-18-15 and as additionally specified below. Specific requirements for each discipline/work product listed under each phase can be found in PG-18-15; it is expected for the phase of design that each of the checked items in the SD/DD/CD columns will be completed for the submittal. The A/E shall attend a review meeting following each design submittal as indicated under the Project Schedule section of this Scope of Work. Each new submittal will incorporate all VA comments from the previous submittal.
The following submittals will be required for this project:
· Quality Assurance/Quality Control (QA/QC) Plan
· Basis of Design (BD) - 10% - In addition to the requirements in PG-18-15, a Basis of Design is required. Basis of Design is a narrative presentation of facts, sufficiently complete, to demonstrate that the project concept is fully understood, and that subsequent design details, and their ultimate presentation in the final drawings and specifications, will be based on sound architectural and engineering decisions. Conceptual drawings of the planned design and the initial cost estimate will additionally be included.
· Schematic Design (SD)- 35%
· Design Development One (DD) – 65%
· Construction Documents (CD)- 95%
· Final Bid Documents (Bid)
11. DRAWING FORMAT: All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2019 or the latest version available to Chillicothe VAMC.
The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the Columbus VOC Master Record Drawing – pending facility expertise). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase.
VAMC Chillicothe, OH 17273 State Route 104 March 30, 2022 Chillicothe, Ohio 45601
· Architectural/Interior Design
· Square Footage/Volume
· Room Names and Numbers
· Architectural Schedules
· Architectural Specialties and Woodwork
· Doors
· Windows
· Louvers
· Roof
· Floors
· Ceilings
· Vertical Circulation
· Walls/Curtain Wall Sizes, Shapes, & Material Data
· General Signage
· Schedules
· Furniture
· Equipment
· Structural
· Foundations
· Shafts and Pits
· Mechanical
· HVAC
· Plumbing
· Electrical/Telecommunications
· Power and Lighting
· Steam Distribution
· Other Engineering Data as Required
· Exterior Building Information
· Nurse Call System
· Asbestos/Hazardous Material Info
· Security System Information (Access Control, Security Cameras, Panic Alarms, Overhead Paging)
· Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms)
· Departmental Ownership (By Common Name, Capital Asset Inventory Department Definition and Strategic Capital Investment Program Department Definition)
12. SUBMITTAL FORMATS: Submittals shall be submitted in electronic format and hard copy formats as listed below. Portable Document Format (.pdf), Microsoft Office Suite formats (.doc, .xls, and .ppt), Microsoft Project (.mpp) and Autodesk Revit Project (.rvt) files are acceptable. Submittals shall additionally be compliant with Section 508 of the Rehabilitation Act (29 U.S.C. '794 d); information on the requirements for accessible media can be found at http://www.section508.gov/. The A/E shall be responsible for providing:
Meeting/Conference Minutes Meeting minutes for all formal meetings and conferences held with the VA; including weekly construction meetings. Meeting minutes shall be submitted within seven (7) calendar days of the meeting or conference. All documents in any of the electronic formats listed above.
Construction Cost Estimates Construction cost estimates shall comply with Manual for Preparation of Cost Estimates & Related Documents for VA Facilities dated March 8, 2011. This document is available on the TIL at http://www.cfm.va.gov/cost/index.asp. All estimates in any of the electronic formats listed above.
Quality Assurance/Quality Control (QA/QC) Plan
· All documents in any of the electronic formats listed above.
Basis of Design (BD)
· All documents in any of the electronic formats listed above.
· Two (2) half-size paper bond sets of drawings – 2 to VA
Schematic Design (SD)
· All documents in any of the electronic formats listed above.
· Two (2) half-size paper bond sets of drawings – 2 to VA
· Two (2) paper bond sets of specifications – 2 to VA
· Two (2) paper bond sets of investigation reports, design calculations, space planning data and cost estimate - 2 to VA
Design Development (DD), and Construction Documents (CD)
· All documents in any of the electronic formats listed above.
· Memo annotating what was not upgraded and corresponding justifications.
· One (1) full size paper bond sets of drawings - 1 to VA
· Two (2) half-size paper bond sets of drawings – 2 to VA
· Two (2) paper bond sets of specifications – 2 to VA
· Two (2) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction statement of work (SOW) and cost estimate - 2 to VA
Final Bid Documents (Bid)
· PDF files of drawings, specifications, and any miscellaneous design analysis documents such as submittal log and physical security compliance report.
· Certified memo annotating what areas/times were not upgraded and the corresponding justifications.
· Certified memo that the A/E design is independent of future projects and includes all equipment required for the project to be activated/full functional.
· Word files of specifications.
· Revit and AutoCAD files of drawings.
· One (1) full size paper bond sets of drawings - 1 to VA
· Two (2) half-size paper bond sets of drawings – 2 to VA
· Two (2) paper bond sets of specifications – 2 to VA
· One (1) paper bond sets of investigation reports, design calculations, space planning data, construction schedule, construction SOW and cost estimate - 1 to VA
Requests For Information (RFI) Requests For Information shall be submitted within three (3) calendar days of submittal to the A/E.
Submittal Reviews Submittal reviews shall be submitted within seven (7) calendar days of submittal to the A/E.
Site Visit Reports Site visit reports shall be submitted within seven (7) calendar days of the visit. All documents in any of the electronic formats listed above.
Modification Requests Modification requests shall be submitted within seven (7) calendar days of submittal to the A/E. All documents in any of the electronic formats listed above. Note - If major modification, VA will provide additional time and document format guidance.
Punch List Punch list shall be submitted within seven (7) calendar days of the final acceptance inspection. All documents in any of the electronic formats listed above.
Record Drawings Record drawings shall be delivered to the VA within thirty (30) calendar days after VA acceptance of the construction project. Autodesk Revit Project (.rvt) format and AutoCAD (.dwg) format.
13. PROJECT SCHEDULE/PERIOD OF PERFORMANCE: The A/E shall perform Part One Services/Design Phase work according to the schedule shown below.
| Pre-Design Conference |
| 10 calendar days after receipt of Notice to Proceed |
| BD Submittal |
| 21 calendar days after Pre-Design Conference |
| BD Review Meeting |
| 10 calendar days after VA receipt of BD Submittal |
| SD Submittal |
| 30 calendar days after VA acceptance of BD Submittal |
| SD Review Meeting |
| 10 calendar days after VA receipt of SD Submittal |
| DD1 Submittal |
| 30 calendar days after VA acceptance of SD Submittal |
| DD1 Review Meeting |
| 10 calendar days after VA receipt of DD1 Submittal |
| CD Submittal |
| 30 calendar days after VA acceptance of DD2 Submittal |
| CD Review Meeting |
| 14 calendar days after VA receipt of CD Submittal |
| Final Bid Documents Submittal |
| 10 calendar days after VA acceptance of CD Submittal |
| Total Part One Services/Design Phase Schedule |
| 175 calendar days |
Part Two Services/Construction Period Services shall be performed for the length of time between the acceptance of Final Bid Documents and acceptance of Construction Completion.
14. CONTRACT OVERSIGHT: All contracts for this project (shall be awarded by the Veteran’s Integrated Service Network 10 Network Contract Office (VISN 10 NCO); only a warranted VA Contracting Officer shall have authority to change the terms and conditions of a contract. These changes may involve the contract award amount, contract period of performance, issuance of stop work orders and changes to the statement of work.
The VISN 10 NCO shall designate a Contracting Officer’s Representative (COR) to monitor and manage the A/E’s performance under the design project contract. The COR shall be a representative of the Columbus VOC Engineering Service Project Section and have the technical knowledge required to monitor and oversee the project.
A COR from the Chillicothe VAMC Engineering Service Project Section shall also be designated for the construction project contract to monitor and manage the construction contractor’s performance under the construction project contract. This designation under the construction contract shall be considered equivalent to the industry standard of “Owner’s Representative” and does not supersede or eliminate the A/E’s responsibility for Part Two Services/Construction Period Services. The A/E ultimately shall be responsible for any errors and omissions with the design discovered during and after the construction phase.
Note regarding contract security: certification and accreditation requirements do not apply, and a Security Accreditation Package is not required
15. SOW ATTACHMENTS: The following list of documents are attached to this SOW for A/E use and incorporation into the project documents:
· VHA Memorandum 2019-11-13 Sensitive Infrastructure Data Classification – For Official Use Only (FOUO)
· 00 VA OEHRM Site Infrastructure Requirements v2.0
· SOCAMES 6 Design Alert 1 – 7
· Chillicothe VAMC Assessment Recommendation 20180803 (EDICT Report)
File details come from the government source that posted it. Updated .