This document is a Statement of Work (SOW) for the U.S. Fish and Wildlife Service's Windom Wetland Management District Headquarters building. The project involves installing wireless push button electrical door operators, replacing existing lever door handles with emergency exit device push bars, and updating door hardware to enhance accessibility and comply with ADA-ABA requirements. The work includes designing and selecting appropriate door hardware, performing electrical modifications, removing and installing new hardware, and testing the new system.
The solicitation is set aside for small businesses, with a project magnitude under $25,000. A mandatory site visit is scheduled for April 29, 2024, at 11:00 AM CDT at the Windom WMD location in Minnesota. Quotes are due by May 9, 2025, at 3:00 PM EDT, to be submitted electronically to Bill Koski. The period of performance is from June 2, 2025, to August 1, 2025. Contractors must provide a company profile, timeline, materials list, cost estimate, and proof of licenses and insurance. The evaluation will be based on the lowest evaluated price determined to be fair and reasonable.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC225Q0023_Amd_0001.pdf | ||
| Sol_140FC225Q0023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1.0 GENERAL
C.1.1 PROJECT DESCRIPTION:
A. The U.S. Fish and Wildlife Service (USFWS) seeks qualified contractors to submit proposals for the installation of wireless push button electrical door operators and new door hardware on existing entry doors at the Windom Wetland Management District Headquarters building. The project shall also include replacement of the existing lever door handles with emergency exit device push bars including keyed dogging matching the exterior locks(using same keys), and other misc. door hardware needed to complete the installation and compatible with the existing security system.
The proposed contractor shall provide a complete proposal for the proposed work including but not limited to design and selection of door hardware that will be suitable for this renovation, electrical modifications, door hardware removal and installation, and testing/adjusting the new hardware. This project aims to enhance access for all visitors while meeting compliance with the Americans with Disabilities Act - Architectural Barriers Act (ADA-ABA).
C.1.2 CONTACT INFORMATION:
A. County of site location: Cottonwood County B. State of site location: Minnesota C. Refuge address: U.S. Fish and Wildlife Service Windom Wetland Management District 49663 Co. Road 17 Windom, MN 56101 D. Refuge telephone number: 507-831-2220 E. Refuge Contact: Jon Beyer-Project Leader
C.1.3 GOVERNMENT REVIEW PRIOR TO APPROVAL:
A. The contractor can meet with the Refuge staff and review the existing conditions by contacting the project leader.
B. In addition to the contractual documents and requirements from the Contracting Officer, Proposals shall also include the following:
- A company profile, including relevant experience and qualifications.
- A timeline for completion.
- A list of the materials proposed for use, including product specifications.
- An itemized cost estimate, including labor and materials.
- Proof of necessary licenses and insurance.
C.1.4 SAFETY:
A. All equipment and work activities shall comply with OSHA Regulations.
B. Provide all necessary Personnel Protective Equipment (PPE).
C. All materials and construction methods shall be in accordance with all Federal, State, and County laws and regulations, and Local ordinances. Any conflict of said laws, regulations and ordinances shall be resolved by adherence to the more strict guidance.
D. The installation of the electrical wiring shall be completed by a licensed electrician.
C.1.5 CHANGE ORDERS:
A. In the event of a need for a Change Order the contractor will receive a letter requesting a price quote for proposed change(s).
B. Any request for time extension must be justified and supported in detail.
C.1.6 SUBMITTALS:
A. Submit a copy of the proposed door operator and door hardware to the Refuge Contact for their review and approval.
C.1.7 FINAL INSPECTION:
A. There will be a final inspection performed at the completion of construction. There will also be periodic construction inspections by the Government’s Construction Inspector, and/or the Site Inspector.
C.1.8 SPECIAL NOTES:
A. All respondents are encouraged to visit the job site to ensure all expected costs are included.
B. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved in advance by the Government.
C. See attached floor plan drawing for location of doors that require new operators and hardware.
D. Wage Rates shall be determined by the Contract Officer, all construction shall meet the requirements of the Davis-Bacon Act.
C.2 DEFINITIONS:
A. Government representatives for this project will be as follows:
1. Contracting Officer:
To be determined U.S. Fish and Wildlife Service
Joint Administrative Operations 5600 American Blvd. W Bloomington, MN 55437-1458 Phone: (612) 713-XXXX
2. Contracting Officer’s Representative and Project Manager:
Todd Criswell, P.E.
U.S. Fish and Wildlife Service Infrastructure Management Division 5600 American Blvd. W Bloomington, MN 55437-1458 Phone: (612) 713-5165
C.3 CONTRACTOR FURNISHED:
A. The contractor shall provide all labor, materials, equipment, and tools required to complete this project.
C.4 GOVERNMENT FURNISHED:
A. The Government shall not provide any labor, materials, equipment, and tools for this project with the exception of:
1. Meeting with the contractor to agree on the location of the new push buttons and reviewing product submittals.
C.5 PROJECT TASK REQUIREMENTS:
A. Plan, design, and install new door operators and other door hardware on existing doors at the Windom Wetland Management District headquarters building.
The attached drawing shall show the exact doors that are to be modified and the proposed door hardware that is expected for each door. The contractor may submit alternative or equal door hardware products to be used on this project.
The contractor shall include in their proposal any additional door hardware they determine that is needed to complete this project. The attached descriptive specification shall outline minimum requirements for the project.
C.6 PRECONSTRUCTION SAFETY
A. The Contractor shall fill out and provide a copy of the FWS Pre-construction Safety Checklist before starting construction.
C.7 SAFETY DURING CONSTRUCTION
A. All equipment and work activities shall comply with OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements. Additionally a copy of the accident report shall be provided to the Contracting Officer.
B. The contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site.
C. Provide and maintain a basic first aid kit for use of workers.
D. Provide necessary Personnel Protective Equipment (PPE) as identified by MSDS and OSHA regulations.
Provide documentation, workers have been trained in use of PPE prior to individual use.
SECTION E – SCHEDULE AND PAYMENT
E.1 SCHEDULE:
A. The contractor shall have thirty (30) days to complete the project design work and submit to the door hardware submittals for review and approval.
B. The contractor shall have an additional thirty
(30) days to complete the construction.
E.2 PAYMENT:
A. Payment for this project shall be based upon a lump sum basis. Contractor shall submit an invoice and lien waiver at completion of the project.
087111 - 1
SECTION 087111 - DOOR HARDWARE (DESCRIPTIVE SPECIFICATION)
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Mechanical door hardware for the following:
a. Swinging doors.
2. Electrified door hardware.
1.2 COORDINATION
A. Installation Templates: Distribute for doors, frames, and other work specified to be factory prepared. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements.
B. Security: Coordinate installation of door hardware, keying, and access control with Owner's existing key system.
C. Electrical System Roughing-In: Coordinate layout and installation of electrified door hardware with connections to power supplies.
D. Existing Openings: Where hardware components are scheduled for application to existing construction or where modifications to existing door hardware are required, field verify existing conditions and coordinate installation of door hardware to suit opening conditions and to provide proper door operation.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.
087111 - 2
B. Shop Drawings: For electrified door hardware.
1. Include diagrams for power, signal, and control wiring.
1.4 CLOSEOUT SUBMITTALS
A. Maintenance Data: For each type of door hardware to include in maintenance manuals.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Employ workers trained to install product of door hardware manufacturer’s products.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Inventory door hardware on receipt and provide secure lock-up for door hardware delivered to Project site.
B. Tag each item or package separately with identification coordinated with the final door hardware schedule, and include installation instructions, templates, and necessary fasteners with each item or package.
C. Deliver keys to Owner as soon as installation is made.
1.7 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including excessive deflection, cracking, or breakage.
b. Faulty operation of doors and door hardware.
c. Deterioration of metals, metal finishes, and other materials beyond normal weathering and use.
2. Workmanship Warranty Period: One (1) year from date of Substantial Completion.
087111 - 3
3. Manufacturer Product Warranty Period: One (1) year minimum except for:
a. Electric Push button door opener system: Three (3) years from date of Substantial Completion.
b. Exit Devices: Two (2) years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Electrified Door Hardware: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
B. Means of Egress Doors: Latches do not require more than 15 lbf to release the latch. Locks do not require use of a key, tool, or special knowledge for operation.
C. Accessibility Requirements: For door hardware on doors in an accessible route, comply with the USDOJ's "2010 ADA Standards for Accessible Design"
1. Provide operating devices that do not require tight grasping, pinching, or twisting of the wrist and that operate with a force of not more than 5 lbf.
2. Adjust door closer sweep periods so that, from an open position of 90 degrees, the door will take at least 5 seconds to move to a position of 12 degrees from the latch.
3. Adjust spring hinges so that, from an open position of 70 degrees, the door will take at least 1.5 seconds to move to the closed position.
2.2 FINISHES
A. Provide finishes complying with BHMA A156.18 as indicated in door hardware schedule.
B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
087111 - 4
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine doors and frames, with Installer present, for compliance with requirements for installation tolerances, labeled fire-rated door assembly construction, wall and floor construction, and other conditions affecting performance of the Work.
B. Examine roughing-in for electrical power systems to verify actual locations of wiring connections before electrified door hardware installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Steel Doors and Frames: For surface-applied door hardware, drill and tap doors and frames in accordance with ANSI/SDI A250.6.
B. Wood Doors: Comply with door and hardware manufacturers' written instructions.
3.3 INSTALLATION
A. Mounting Heights: Mount door hardware units at heights to comply with ADA-ABA regulations if not otherwise indicated comply with governing regulations.
1. Standard Steel Doors and Frames: ANSI/SDI A250.8.
2. Custom Steel Doors and Frames: HMMA 831.
3. Wood Doors: DHI's "Recommended Locations for
Architectural Hardware for Wood Flush Doors."
B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work. Do not install surface-mounted items until finishes have been completed on substrates involved.
087111 - 5
1. Set units level, plumb, and true to line and location.
Adjust and reinforce attachment substrates as necessary for proper installation and operation.
2. Drill and countersink units that are not factory prepared for anchorage fasteners. Space fasteners and anchors according to industry standards.
3.4 ADJUSTING
A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended. Adjust door control devices to compensate for operation of heating and ventilating equipment and to comply with referenced accessibility requirements.
3.5 CLEANING AND PROTECTION
A. Clean adjacent surfaces soiled by door hardware installation.
B. Clean operating items as necessary to restore proper function and finish.
C. Provide final protection and maintain conditions that ensure that door hardware is without damage or deterioration at time of Substantial Completion.
3.6 MAINTENANCE
A. Maintenance Tools and Instructions: Furnish a complete set of any required specialized tools and maintenance instructions for Owner's continued adjustment, maintenance, and removal and replacement of door hardware.
3.7 DEMONSTRATION
A. Train Owner's maintenance personnel to adjust, operate, and maintain door hardware.
END OF SECTION 087111
"General Decision Number: MN20250043 02/07/2025
State: Minnesota
Construction Type: Building
County: Cottonwood County in Minnesota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Please refer to Minnesota Rules 5200.1100, 5200.1101, and
5200.1102 for definitions of labor classifications on this wage determination, and direct any questions regarding such classifications to the Branch of Construction Wage Determinations.
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |� Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |� The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|� Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |� The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2025. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
4/11/25, 12:27 PM SAM.gov https://sam.gov/wage-determination/MN20250043/0 1/8
Modification Number Publication Date 0 02/07/2025
SAMN2024-027 12/23/2024
Rates Fringes
ARTICULATED HAULER...............$ 35.00 8.75
ASBESTOS ABATEMENT WORKER........$ 41.23 25.99
BOILERMAKER......................$ 41.94 29.99
BOOM TRUCK.......................$ 35.25 5.46
BRICKLAYER.......................$ 38.05 23.83
CARPENTER........................$ 33.14 27.60
CARPET LAYER (LINOLEUM)..........$ 34.03 22.65
CEMENT MASON.....................$ 40.97 8.84
Drywall Taper....................$ 33.66 25.04
ELECTRICIAN......................$ 45.48 22.50
ELEVATOR CONSTRUCTORS............$ 51.55 40.48
FLAG PERSON......................$ 22.99 18.47
GLAZIER..........................$ 48.98 26.75
HEATING AND FROST INSULATORS.....$ 53.19 31.95
IRONWORKER.......................$ 44.85 35.72
LABORER: Common or General
(GENERAL LABOR WORK).............$ 32.97 24.46
LABORER: Landscape
(GARDENER, SOD LAYER AND
NURSERY OPERATOR)................$ 24.00 16.96
LABORER: Skilled (ASSISTING
SKILLED CRAFT JOURNEYMAN)........$ 32.97 24.46
LANDSCAPING EQUIPMENT
(INCLUDES HYDRO SEEDER OR
MULCHER, SOD ROLLER, FARM
TRACTOR WITH ATTACHMENT
SPECIFICALLY SEEDING,
SODDING, OR PLANT, AND
TWO-FRAMED FORKLIFT
(EXCLUDING FRONT,
POSIT-TRACK, AND SKID STEER
LOADERS), NO EARTHWORK OR
GRADING FOR ELEVATIONS)..........$ 21.17 13.99
LATHER...........................$ 22.00 0.00
MILLWRIGHT.......................$ 41.70 31.81
PAINTER (INCLUDING HAND
https://sam.gov/wage-determination/MN20250043/0 2/8
BRUSHED, HAND SPRAYED, AND
THE TAPING OF PAVEMENT
MARKINGS)........................$ 34.28 24.83
PAVEMENT MARKING OR MARKING
REMOVAL EQUIPMENT ((ONE OR
TWO PERSON OPERATORS);
SELF-PROPELLED TRUCK OR
TRAILER MOUNTED UNITS.)..........$ 21.25 5.00
Piledriver (INCLUDING
VIBRATORY DRIVER OR EXTRACTOR
FOR PILING AND SHEETING
OPERATIONS)......................$ 45.71 29.73
PIPEFITTER/STEAMFITTER...........$ 41.52 27.27
PIPELAYER (WATER, SEWER AND
GAS).............................$ 40.14 24.68
PLASTERER........................$ 14.00 ** 0.00
PLUMBER..........................$ 41.62 27.17
POWER EQUIPMENT OPERATOR:
(Commercial Group 1).............$ 48.89 26.88
HELICOPTER PILOT; TOWER CRANE 250 FEET AND OVER; TRUCK CRAWLER
CRANE WITH 200 FEET OF BOOM AND OVER, INCLUDING JIB
POWER EQUIPMENT OPERATOR:
(Commercial Group 2).............$ 48.53 26.88
TOWER CRANE 200 FEET AND OVER; CONCRETE PUMP WITH 50
METERS/164 FEET OF BOOM AND OVER; PILE DRIVING WHEN THREE
DRUMS IN USE; TRUCK OR CRAWLER CRANE WITH 150 FEET OF BOOM UP
TO AND NOT INCLUDING 200 FEET, INCLUDING JIB
POWER EQUIPMENT OPERATOR:
(Commercial Group 3).............$ 47.02 26.88
ALL-TERRAIN VEHICLE CRANES; CONCRETE PUMP 32-49 METERS/102-164
FEET; DERRICK (GUY & STIFFLEG); SELF-ERECTING TOWER CRANE 100
FEET AND OVER MEASURED FROM BOOM FOOT PIN; STATIONARY TOWER
CRANE UP TO 200 FEET; TRAVELING TOWER CRANE; TRUCK OR CRAWLER
CRANE UP TO AND NOT INCLUDING 150 FEET OF BOOM, INCLUDING JIB
POWER EQUIPMENT OPERATOR:
(Commercial Group 4).............$ 41.38 22.85
CRAWLER BACKHOE INCLUDING ATTACHMENTS; FIREPERSON, CHIEF
BOILER LICENSE; HOIST ENGINEER (THREE DRUMS OR MORE);
LOCOMOTIVE; OVERHEAD CRANE (INSIDE BUILDING PERIMETER);
TRACTOR . BOOM TYPE
POWER EQUIPMENT OPERATOR:
(Commercial Group 5).............$ 44.54 26.88
AIR COMPRESSOR 450 CFM OR OVER (TWO OR MORE MACHINES);
CONCRETE MIXER; CONCRETE PUMP UP TO 31 METERS/101 FEET OF
BOOM; DRILL RIGS, HEAVY ROTARY OR CHURN OR CABLE DRILL WHEN
USED FOR CAISSON FOR ELEVATOR OR BUILDING CONSTRUCTION;
FORKLIFT; FRONT END, SKID STEER 1 C YD AND OVER; HOIST
ENGINEER (ONE OR TWO DRUMS); MECHANIC (ON POWER EQUIPMENT);
POWER PLANT (100 KW AND OVER OR MULTIPLES EQUAL TO 100KW AND
OVER); PUMP OPERATOR AND/OR CONVEYOR (TWO OR MORE MACHINES);
SELF-ERECTING TOWER CRANE UNDER 100 FEET MEASURED FROM BOOM
FOOT PIN; STRADDLE CARRIER; TRACTOR OVER D2; WELL POINT PUMP
POWER EQUIPMENT OPERATOR:
https://sam.gov/wage-determination/MN20250043/0 3/8
(Commercial Group 6).............$ 42.94 26.40
CONCRETE BATCH PLANT; FIREPERSON, FIRST CLASS BOILER LICENSE;
FRONT END, SKID STEER UP TO 1 C YD; GUNITE MACHINE; TRACTOR
OPERATOR D2 OR SIMILAR SIZE; TRENCHING MACHINE (SEWER, WATER,
GAS) EXCLUDES WALK BEHIND TRENCHER
POWER EQUIPMENT OPERATOR:
(Commercial Group 7).............$ 41.73 26.88
AIR COMPRESSOR 600 CFM OR OVER; BRAKEPERSON; CONCRETE
PUMP/PUMPCRETE OR COMPLACO TYPE; FIREPERSON, TEMPORARY HEAT
SECOND CLASS BOILER LICENSE; OILER (POWER SHOVEL, CRANE, TRUCK
CRANE, DRAGLINE, CRUSHERS AND MILLING MACHINES, OR OTHER
SIMILAR POWER EQUIPMENT); PICK UP SWEEPER (ONE CUBIC YARD
HOPPER CAPACITY); PUMP AND/OR CONVEYOR
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 2)..........$ 30.65 21.40
GRADER OR MOTOR PATROL; TUGBOAT 100 H.P. AND OVER WHEN LICENSE
REQUIRED
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 3)..........$ 38.00 8.75
ASPHALT BITUMINOUS STABILIZER PLANT; CABLEWAY; DERRICK (GUY OR
STIFFLEG)(POWER)(SKIDS OR STATIONARY); DREDGE OR ENGINEERS,
DREDGE (POWER) AND ENGINEER; LOCOMOTIVE CRANE OPERATOR; TANDEM
SCRAPER; TUGBOAT 100 H.P AND OVER
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 4)..........$ 31.00 8.75
AIR TRACK ROCK DRILL; AUTOMATIC ROAD MACHINE (CMI OR SIMILAR);
BACKFILLER OPERATOR; BITUMINOUS ROLLERS, RUBBER TIRED OR STEEL
DRUMMED (EIGHT TONS AND OVER); BITUMINOUS SPREADER AND
FINISHING MACHINES (POWER), INCLUDING PAVERS, MACRO SURFACING
AND MICRO SURFACING, OR SIMILAR TYPES (OPERATOR AND SCREED
PERSON); BROKK OR R.T.C. REMOTE CONTROL OR SIMILAR TYPE WITH
ALL ATTACHMENTS; CAT CHALLENGER TRACTORS OR SIMILAR TYPES
PULLING ROCK WAGONS, BULLDOZERS AND SCRAPERS; CHIP HARVESTER
AND TREE CUTTER; CONCRETE DISTRIBUTOR AND SPREADER FINISHING
MACHINE, LONGITUDINAL FLOAT, JOINT MACHINE, AND SPRAY MACHINE;
CONCRETE MOBIL; CRUSHING PLANT (GRAVEL AND STONE) OR GRAVEL
WASHING, CRUSHING AND SCREENING PLANT; CURB MACHINE;
DIRECTIONAL BORING MACHINE; DOPE MACHINE (PIPELINE); DUAL
TRACTOR; ELEVATING GRADER; GPS REMOTE OPERATING OF EQUIPMENT;
HYDRAULIC TREE PLANTER; LAUNCHER PERSON (TANKER PERSON OR
PILOT LICENSE); LOCOMOTIVE; MILLING, GRINDING, PLANNING, FINE
GRADE, OR TRIMMER MACHINE; PAVEMENT BREAKER OR TAMPING MACHINE
(POWER DRIVEN) MIGHTY MITE OR SIMILAR TYPE; PIPELINE WRAPPING,
CLEANING OR BENDING MACHINE; POWER ACTUATED HORIZONTAL BORING
MACHINE, OVER SIX INCHES; PUGMILL; RUBBER-TIRED FARM TRACTOR
WITH BACKHOE INCLUDING ATTACHMENTS; SCRAPER; SELF-PROPELLED
SOIL STABILIZER; SLIP FORM (POWER DRIVEN) (PAVING); TIE TAMPER
AND BALLAST MACHINE; TRACTOR, WHEEL TYPE, OVER 50 H.P. WITH
PTO UNRELATED TO LANDSCAPING; TUB GRINDER, MORBARK, OR SIMILAR
TYPE
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 5)..........$ 35.85 21.55
BITUMINOUS ROLLER (UNDER EIGHT TONS); CONCRETE SAW (MULTIPLE
BLADE) (POWER OPERATED); FORM TRENCH DIGGER (POWER); HYDRAULIC
LOG SPLITTER; LOADER (BARBER GREENE OR SIMILAR TYPE); POST
HOLE DRIVING MACHINE/POST HOLE AUGER; POWER ACTUATED JACK;
SELF-PROPELLED CHIP SPREADER (FLAHERTY OR SIMILAR); SHEEP FOOT
COMPACTOR WITH BLADE . 200 H.P. AND OVER; SHOULDERING MACHINE
(POWER) APSCO OR SIMILAR TYPE INCLUDING SELF-PROPELLED SAND
AND CHIP SPREADER; STUMP CHIPPER AND TREE CHIPPER; TREE FARMER
https://sam.gov/wage-determination/MN20250043/0 4/8
(MACHINE)
POWER EQUIPMENT OPERATOR:
(Highway/Heavy Group 6)..........$ 26.00 8.75
CAT, CHALLENGER, OR SIMILAR TYPE OF TRACTORS, WHEN PULLING
DISK OR ROLLER; DREDGE DECK HAND; GRAVEL SCREENING PLANT
(PORTABLE NOT CRUSHING OR WASHING); LEVER PERSON; POWER
SWEEPER; SHEEP FOOT ROLLER AND ROLLERS ON GRAVEL COMPACTION,
INCLUDING VIBRATING ROLLERS; TRACTOR, WHEEL TYPE, OVER 50
H.P., UNRELATED TO LANDSCAPING
ROOFER...........................$ 37.20 6.57
SHEET METAL WORKER...............$ 29.00 5.14
SIGN ERECTOR.....................$ 23.00 1.89
SPRINKLER FITTER.................$ 40.04 22.60
Survey Field Technician
(OPERATE TOTAL STATION, GPS
RECEIVER, LEVEL, ROD OR RANGE
POLES, STEEL TAPE
MEASUREMENT; MARK AND DRIVE
STAKES; HAND OR POWER DIGGING
FOR AND IDENTIFICATION OF
MARKERS OR MONUMENTS; PERFORM
AND CHECK CALCULATIONS;
REVIEW AND UNDERSTAND
CONSTRUCTION PLANS AND LAND
SURVEY MATERIALS)................$ 28.00 6.00
TERRAZZO WORKER..................$ 43.73 20.73
TILE SETTER......................$ 30.66 10.53
TRUCK DRIVER (Group 1)...........$ 33.00 8.75
MECHANIC; TRACTOR TRAILER DRIVER; TRUCK DRIVER (HAULING
MACHINERY INCLUDING OPERATION OF HAND AND POWER OPERATED
WINCHES)
TRUCK DRIVER (Group 2)...........$ 33.00 8.75
FOUR OR MORE AXLE UNIT, STRAIGHT BODY TRUCK
TRUCK DRIVER (Group 3)...........$ 29.00 8.00
BITUMINOUS DISTRIBUTOR DRIVER; BITUMINOUS DISTRIBUTOR (ONE
PERSON OPERATION); THREE AXLE UNITS
TRUCK DRIVER (Group 4)...........$ 14.50 ** 0.00
BITUMINOUS DISTRIBUTOR SPRAY OPERATOR (REAR AND OILER); DUMP
PERSON; GREASER; PILOT CAR DRIVER; RUBBER-TIRED, SELF-
PROPELLED PACKER UNDER 8 TONS; TWO AXLE UNIT; SLURRY OPERATOR;
TANK TRUCK HELPER (GAS, OIL, ROAD OIL, AND WATER); TRACTOR
OPERATOR, UNDER 50 H.P.
UNDERGROUND AND OPEN DITCH
LABORER (EIGHT FEET BELOW
STARTING GRADE LEVEL)............$ 38.14 24.68
WIRING SYSTEM TECHNICIAN.........$ 47.73 22.24
WIRING SYSTEMS INSTALLER.........$ 33.44 17.82
WELDERS - Receive rate prescribed for craft performing https://sam.gov/wage-determination/MN20250043/0 5/8 operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.75) or 13658 ($13.30). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes https://sam.gov/wage-determination/MN20250043/0 6/8 over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination https://sam.gov/wage-determination/MN20250043/0 7/8
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION"
https://sam.gov/wage-determination/MN20250043/0 8/8
Section Title
Part I—The Schedule
A Solicitation/Contract Form
B Prices
C Description/Specifications/Statement of Work
D Packaging and Marking
E Inspection and Acceptance
F Project Delivery
G Contract Administration Data
H Special Contract Requirements
Part II—Contract Clauses
I Contract Clauses
Part III—List of Documents, Exhibits, and Other Attachments
J List of Attachments
Part IV—Representations and Instructions
K Representations, Certifications, and other Statements of Offerors
L Instructions, Conditions, and Notices to Offerors
M Evaluation Factors for Award
SECTION B – PRICES (QUOTE SCHEDULE)
N/A
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
See Attached SOW
(End of Section C)
SECTION D – PACKAGING AND MARKING
D.1.0 PAYMENT OF POSTAGE FEES
All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.
D.2.0 MARKING
All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.
(End of Section D)
SECTION E – INSPECTION AND ACCEPTANCE
The following clauses are incorporated by reference:
52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
(End of Section E)
SECTION F – PROJECT DELIVERY
F.1.0 PERIOD OF PERFORMANCE
See clause 52.211-10 in this section.
52.242-14 SUSPENSION OF WORK APR 1984
The following clauses are provided in full text:
52.211-10 – COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 13 calendar days after the date the Contractor receives the award of contract, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 73 days after the date the contractor receives the award. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
The completion date is based on the assumption that the successful offeror will receive the award by May 20, 2025. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of Clause)
(End of Section F)
SECTION G – CONTRACT ADMINISTRATION DATA
Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP)
(February 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform
System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice billed according to contract line items and rates.
2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.
3. If the partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.
4. If final payment is billed, the last invoice shall state “FINAL”.
5. Contractor’s Release of Claims shall be submitted with the final invoice.
https://www.ipp.gov/
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor
Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve
Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-
3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
(End of Section G)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1.0 WORK HOURS
Unless otherwise specified in Section C, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be performed on Saturday, Sunday, or Federal holidays unless authorized by the COR.
H.2.0 ENVIRONMENTAL INTERRUPTION OF WORK
H.2.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration. An allowance has been included in the contract time for environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions.
H.2.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, are discovered to be present in or adjacent to the project area.
H.3.0 DRAWINGS
H.3.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the COR.
H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data
(including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in Section I of this contract.
H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.5.0 SUBSTITUTION – PROCESSION OF WORK
mailto:IPPCustomerSupport@fiscal.treasury.gov
Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the RFQ response. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.
H.6.0 ENVIRONMENTAL IMPACT
All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec
1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C.
6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).
Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.
H.7.0 HAZARDOUS MATERIALS
Any material suspected of being hazardous that is unexpectedly encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.
Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.
H.8.0 GREEN PROCUREMENT REQUIREMENTS
In the performance of this construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, as applicable:
U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.
USDA Biobased product listings published at www.biopreferred.gov.
Energy Star® product listings published at www.energystar.gov/products.
FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories
Contractor shall comply with all reporting requirements of the following clauses when applicable (See Clause and Provision sections):
52.223-1 Biobased Product Certification
52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts
52.223-4 Recovered Material Certification
52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items
52.223-15 Energy Efficiency in Energy Consuming Products
52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts
H.9.0 UNAUTHORIZED PERSONNEL
http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories
The contractor shall inform all personnel working under their jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.
H.10.0 DAVIS-BACON WAGE RATES APPLICABLE TO TRUCK DRIVERS
29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.
H.11.0 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
(End of Section H)
SECTION I – CONTRACT CLAUSES
Clause Title Date
52.201-1 DEFINITIONS JUN 2020
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
JUN 2020
52.203-18 PROHINITION ON CONTRACTING ENTITIES THAT REQUIRE CERTAIN
INTERNAL CONFIDENTIALTY AGREEMENTS OR STATEMENTS-
REPRESNTATION
JUN 2017
52.204-7 SYSTEM FOR AWARD MANAGEMENT NOV 2024
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL JAN 2011
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS
DEC 2014
52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017
52.204-23 PROHINITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES
NOV 2021
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
NOV 2021
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
NOV 2021
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-
REPRESENTATION
NOV 2021
52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—
REPRESENTATION AND DISCLOSURES.
MAY 2024
52.204.30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—
PROHIBITION.
MAY 2024
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS
NOV 2015
52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX
LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW.
FEB 2016
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS – COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES
NOV 2024
52.213-4 TERMS AND CONDITIONS-SIMPLIFIED ACQUISITIONS (OTHER THAN
COMMERCIAL ITEMS)
NOV 2024
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS. NOV 1999
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991
52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. MAR 2023
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOV 2020
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION FEB 2024
52.222-3 CONVICT LABOR JUN 2003
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS AUG 2018
52.222-7 WITHHOLDING OF FUNDS MAY 2014
52.222-8 PAYROLLS AND BASIC RECORDS JUL 2021
52.222-9 APPRENTICES AND TRAINEES JULY 2005
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014
52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND
RELATED REGULATIONS
MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015
52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS FEB 1999
52.222-25 AFFIRMATIVE ACTION COMPLIANCE APR 1984
52.222-26 EQUAL OPPORTUNITY SEP 2016
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION
APR 2015
52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT
(NONE OR SEPARATELY SPECIFIED PRICING METHOD
AUG 2018
52.222-31 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT
(PERCENTAGE METHOD)
AUG 2018
52.222-50 COMBATING TRAFFICKING IN PERSONS OCT 2020
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY FEB 2021
52.222-99 COMBATING RACE AND SEX STEREOTYPING. [(DEVIATION 20-09)]
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. MAY 2011
52.223-6 DRUG-FREE WORKPLACE MAY 2001
52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE
AND CONSTRUCTION CONTRACTS
AUG 2018
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING
JUN 2020
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021
52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN
CERTAI…