This Statement of Work outlines requirements for upgrading and repairing Dragoon ITCN C-STAT Timing testers owned by the 350 SWG DET 1 and 87th EWS, used for testing chaff and flare systems on various aircraft including EC/HC/MC-130, C-130J, A-10, HH-60, F-16 and MC-12 configurations.

The contractor must provide updates to collector and tester front plates to incorporate new cannon plug style cables, including MIL-STD 1553 cables with cannon plugs for connecting to collectors and up to four testers per assembly. Specific materials include 96 new dispenser front panels, 7 new collector front panels, and various lengths of CSTAT Interface Cable Assemblies ranging from 6ft to 100ft. The government will provide GFE including 96 CM2-T-47 CMDS Timing Testers, 7 CM2-C-16 CMDS Collectors, and 1 Workstation Toughbook Laptop. Key deliverables include a Draft Acceptance Test Procedure 45 days before testing, a final ATP 15 days prior, test reports within 14 days after testing, and an updated User's Manual in both hard copy and electronic format. All upgrades include a 1-year warranty covering repairs and software issues.

View the file

Other files

File Type Posted
Sources Sought SBO approved - DragoonITC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALQ-213/ALE-47 MDVS Statement of Work

Purpose

The contractor shall upgrade and repair the Dragoon ITCN C-STAT Timing testers owned by the 350 SWG DET 1 and 87th EWS that are used for testing the chaff and flare systems on the EC/HC/MC-130; C-130J, A-10, HH-60, F-16 and MC-12 configurations. The C-STAT shall also provide the capability to capture the firing pulse and locations of expendables dispensed from the aircraft.

Overall System Requirements

The contractor shall provide updates to the collector and tester front plate to incorporate the new cannon plug style cables for improved interface between the collector and tester. The contractor shall provide MIL-STD 1553 cables outfitted with cannon plugs to be connected to the collector and up-to four testers per cable assembly.

The following material will be upgraded:

Items Quantity NEW Dispenser Front panel 96.00 NEW Collector Front panel 7.00

New CSTAT Interface Cable Assembly 6ft 10.00 New CSTAT Interface Cable Assembly 10ft 4.00 New CSTAT Interface Cable Assembly 15ft 8.00 New CSTAT Interface Cable Assembly 20ft 18.00 New CSTAT Interface Cable Assembly 25ft 10.00 New CSTAT Interface Cable Assembly 30ft 32.00 New CSTAT Interface Cable Assembly 40ft 10.00 New CSTAT Interface Cable Assembly 60ft 8.00

New CSTAT Interface Cable Assembly 100ft 18.00

Functional Requirements

The upgrades and repairs to the C-STAT will reduce mission execution by over an hour each test. With over 300 tests per year, often conducted during mission critical times, these upgrades will save the Combat Air Force hundreds of hours of time during mission critical moments.

Government Furnished Property & Services

The Government will assist the contractor in obtaining access to the necessary C-STAT equipment to fulfill the requirements of this effort.

The government will hand over the following Government Furnished Equipment (GFE) hardware, listed and quantified in Table 2, for Dragoon ITCN to perform services and upgrades. This equipment will be serviced and upgraded by the vendor and returned to the government at the conclusion of the vendor’s work to service and upgrade the listed equipment.

Item Nomenclature Nou

Part Number Qty 1 CM2-T-47 CMDS Timing Tester 06-08397 96 2 CM2-C-16 CMDS Collector 06-08418 7

3 Workstation Toughbook Laptop N/A 1

All government furnished equipment and material shall be returned to the Government upon completion of the contract.

Acceptance Tests The contractor shall submit a Draft Acceptance Test Procedure (ATP) to 350 SWG Det 1 for approval 45 days prior to performing the acceptance test, with a final copy submitted 15 days prior to scheduled test. Following government approval of the ATP, the contractor shall perform an acceptance test on the ALQ-213/ALE-47 MDVS in accordance with the government approved ATP. The contractor shall submit a test report for Government approval 14 days following testing.

All upgrades will have a 1-year warranty that covers repairs and software issues.

User’s Manual The Contractor shall deliver an updated User’s Manual for the ITCN C-STAT. The User’s Manual shall be modified/updated as required upon completion to address the delivered capability. In addition to those requirements identified in the associated Data Item Description (DID), the User’s Manual will describe the basic operation of the system and contain engineering data such as block diagrams, electrical schematics, system interconnecting tables, and a complete parts list with sources. The User’s Manual shall be comprehensive enough that a government journeyman electronics technician can fully maintain C-STAT based on the information provided in the updated manual. The User’s Manual shall be delivered in hard and soft (electronic) media format. The contractor shall perform quality assurance on all submittals, incorporate government comments, and correct any discrepancies as required.

Acceptance Tests
User’s Manual