Procurement and Installation of Two Each Headache Racks

For 60 LRS Ground Transportation Tractors G82-0123N and G82-0124N

18 May 21

The 60th Logistics Readiness Squadron (60 LRS) has two tractors that will need to have two safety headache racks procured and installed for a 2014 Freightliner Tractor

(G32-0124N) and 2014 Mack Tractor (G32-0123N). They are located at the Ground

Transportation (GT) Compound, 430 Hangar Avenue, Travis Air Force Base (AFB), 94535.

Description: Requesting the contractor to procure and install a Protech Cab Rack (or equal) with storage for both chains, binders, straps and tool box, part #10-1033-592 into two tractors, G82-0123N and G82-0124N.

GT will require two each headache racks with storage for chains, binders, straps and

100 lbs. tool box for each tractor named above to be installed. Contractor will be responsible to provide all transportation, shipping, labor, tools, materials, Contractor shall not utilize Government facility to perform installation; therefore, contractor shall utilize off-base facility for installation of racks which shall not be located greater than 50 miles from Travis AFB, CA. The contractor will assume all transportation costs from Travis AFB to location of facility for performance of installation. Due to mission requirements, GT cannot have both tractors out for installation at the same time.

Specifications/Item Listing (Commodity/Equipment): GT will require two each

Protech Cab Rack, part #10-1033-592 (or equal), headache racks with storage for chains, binders, straps and 100 lbs. tool box for each tractor named above to be installed. Request a 2-year warranty 100% coverage on parts and installation. Service provider shall provide timely service on any warranty repair requests.

Special Requirements: Service provider shall install the headache racks to the exact specifics required for distance required between the cab and deck plate of each tractor required by Department of Transportation guidelines.

Qualifications/Certifications: Ensure installation meets Department of

Transportation Motor Carrier Safety.

Period of Performance: The start date shall not later than 30 days after receipt of award and completion date shall not be later than 60 days after start date.

Point of Contact: Once contract awarded, the service provider shall contact the primary point of contact, within 24 to 48 hours of final award.