STATEMENT OF WORK
GRAVEL MATERIAL DELIVERY
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION OF WORK: Provide crushed gravel materials to the site listed below in 12 yard loads up to the specified dollar amount. The materials will be delivered on an as needed basis on unfinished roads within a radius of 12 miles of the site listed below. The quantity of the material is an estimate and not guaranteed to be accurate/final, the contract is a “Not to Exceed” with a final dollar amount. The material will be called for on an as needed basis for a roadway construction project.
PART B – PERFORMANCE REQUIREMENTS
Delivery Site:
1. 21 Pintail Lane, Natchez, MS 39120
Material Estimates:
1. 610 Limestone -350 tons
2. Rip Rap - 1200 tons
Material will be provided on an as-needed basis up to 180 yards per day during the primary operations in August 30, 2021 to 10/30/2021. The project is expected to run for a 7 week period during this time.
Coordination of deliveries will be done through refuge staff while the job is being completed. General refuge hours are 8AM – 4PM Monday – Friday.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DOCUMENTATION AND REPORTING: Written ticket will be provided to refuge staff daily to ensure load counts and volumes are accurate. All local and state transportation regulations apply.