SOW.pdf

PDF 201 KB Posted

Attached to
Main Gate Sign Federal contract opportunity
Solicitation number
W50S83-21-Q-0003
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Main Gate Sign, newest first.
File Type Posted
ufc_3_120_01_2014_c3.pdf PDF
UFC 3-120-01 (12 December 2017).pdf PDF
Provisions_Clauses_W50S8321Q0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINE AIR NATIONAL GUARD

101st CIVIL ENGINEER SQUADRON (AMC)

106 ASHLEY AVENUE, SUITE 486

BANGOR, MAINE 04401-3051

TITLE

101ST ARW Main Entrance Sign

DATE

9 July 2021

FOR

UNITED STATES PROPERTY AND FISCAL OFFICES

MAINE NATIONAL GUARD

AUGUSTA, MAINE 04333

SECTION 01000

GENERAL CONDITIONS

10-01 GOVERNMENT FURNISHED UTILITIES: All reasonable quantities of utilities will be made available to the Contractor without charge, any temporary connection or lines that may be required will be installed, maintained and removed by the Contract at their own expense and in a manner satisfactory to the authorized government Representative. The removal of such connections or lines will be accomplished prior to final acceptance of the construction.

10-02 FIRE PROTECTION: The Contractor will be responsible for conformance with Base Fire Regulations during the period of contract performance.

10-03 SAFETY: Hazardous construction equipment shall not be left unattended, and ladders, staging etc., shall be removed from the work site at the end of each working day. The Contractor is responsible to ensure that OSHA standards are being met on the job site and that in particular, that USAF personnel and equipment are protected at all times. The Contractor shall ensure that visitors to the job site (area) are controlled and kept away from any potential hazardous activities.

10-04 CONTRACTOR DAMAGE: The Contractor shall protect the existing building(s), grounds, vegetation’s, etc.; against any and all damage. Any and all damage resulting from the Contractor’s operations shall be restored to its original condition, in an approved manner at no cost to the Government and shall include damage resulting from weather. The Contractor shall take and initiate whatever precautions may be necessary to ensure that buildings are protected at all times during inclement weather. The Contractor will be liable for any and all damage that occurs due to inadequate protections from the elements during the performance period of this Contract.

10-05 SITE INSPECTION: Plan details and dimensions are generally taken from available government drawings and are not always as-builts. The Contractor shall be responsible for visiting the Site and thoroughly familiarizing himself/herself with all the details of the Work within the Scope of Work and shall verify existing conditions and dimensions from each applicable area.

10-06 SALVAGE: Unless stated otherwise, the Contractor shall be responsible for all salvage rights to all aspects of the project.

10-07 CLEAN-UP: The Contractor shall be responsible to remove and dispose of waste material. He will be responsible to leave the site in a neat and acceptable condition.

PART 1

GENERAL:

1.1 LOCATION: The location is on the corner of Maine Ave. and Griffin road, Maine Air National Guard

(ANG), Bangor International Airport, Bangor, Maine 04401

1.2 POINT OF CONTACT (POC): The 101st Civil Engineer Squadron is the subject matter expert and will provide any technical advice or assistance. The following individual is the Primary POC for this project: TSgt Jesse Patterson. Jesse.patterson.2@us.af.mil

1.3 GOVERNMENT FURNISHED EQUIPMENT (GFE): None

1.4 APPLICABLE PUBLICATIONS: UFC-3-120-01 Chapter 3 (attachment #1)

1.1 MATERIAL REQUIREMENTS: Buy American Act

1.5 ENVIRONMENTAL PROTECTION: The contractor is responsible for ensuring that all construction activities meet or exceed U.S. EPA requirements for environmental protection.

1.6 SUBMITTALS: Provide submittals to the POC for review and approval. For this project, the following submittals shall be submitted: Sign design, Sample of crushed stone drip edge, Solar lighting.

1.7 SUMMARY OF WORK: All work per specifications and sketches. The work to be completed on this project consists of (but is not limited to) providing all plant, labor and materials to complete the following major descriptive items:

1.8 Contractor shall install new main entrance sign and solar powered LED illuminations in new location

1.9 Sign shall comply with UFC 3-120-01 CHAPTER 3 EXTERIOR SIGN STANDARDS.

1.10 Contractor shall provide sign design for review and approval prior to ordering.

1.11 Contractor shall provide stone face sample for approval.

1.12 Ground shall be prepped to receive cast-in-place concrete footing and back fill with compacted structural material, finished with landscape fabric and 1-1/2” crushed stone for weed prevention.

1.13 Install two LED PAR solar powered floodlights to provide sign with full coverage.

Attachment #1: UFC 3-120-01 (12 December 2017)