Text version
WOVEN WIRE FENCING
CAMP PENDLETON, CA
Background
Marine Corps Base Camp Pendleton, utilizes woven wire fencing to contain and secure supplies, equipment, and other materials within warehousing facilities.
Objectives
To have woven wire fencing installed at the designated job location.
Scope
To provide security to designated items as per current security regulations.
Tasks
Task Number Work Milestones Projected Completion Date
4.1 Schedule On-Site Field Measurement with TPOC 5 Business Days of Award
4.2 Perform On-Site Field Measurement with TPOC 10 Business Days of
Award
4.3 Furnish Woven Wire Fencing Material RDD 30 April 2021
4.4 Commence Woven Wire Fencing Installation RDD 30 April 2021
4.5 The TPOC will inspect the job when completed
4.1 Task 1 – Schedule On-Site Field Measurement with TPOC
The Contractor will schedule an on-site field measurement with the Technical Point of Contact
(TPOC) within five (5) business days of contract award.
4.2 Task 2 – Perform On-Site Field Measurement with TPOC
The Contractor will attend the on-site field measurement with the TPOC within ten (10) business days of contract award. The TPOC will accompany the contractor to the job site to ensure that the contractor has a full understanding of the required scope and possess all required information to perform the job. The Contractor will bring measuring equipment and the governments technical drawing to the field measurement. The contractor will provide a drawing(s) to the TPOC for approval prior to fabrication.
4.3 Task 3 – Furnish Woven Wire Fencing Material
The Contractor will fabricate the materials in accordance with the Government’s standards.
Material Requirements are as follows:
• All wire edges are to be enclosed in at least 12 gauge channel. Require 10 gauge 1 ½” diamond wire mesh. Fence stiffeners, if required, are to be posts centered on the wire partitions.
Color: Dark Brown
• Paint: Enamel ( semi-gloss)
4.4 Task 4 – Woven Wire Fencing Installation
The Contractor will install all required woven wire fencing in accordance with Government provided technical drawing (See Enclosure).
4.5 Task 5 – Completed Job Inspection
This Contract does not contain a Quality Assurance Surveillance Plan (QASP); however, the TPOC will inspect the job for quality upon completion. Quality will be measured in accordance with the following:
• Measurement information from the on-site field measurement
• Technical Drawing(s)
• Contractor’s quoted material at the time of the solicitation
Place of Performance:
The job site location aboard Marine Corps Base Camp Pendleton, Ca is building 22105.
6. Government Technical Point of Contact.
The Contracting Officer will designate a Government Technical Point of Contact (TPOC) during the term of this contract. The TPOC will provide assistance in identifying and resolving problems and provide technical clarification and assistance in support of the contract requirements. The TPOC DOES NOT have the authority to make changes and/or give direction under this contract. The only authority that is authorized to make changes, give direction, and/or provide monetary adjustments is the Contracting
Officer from the Regional Contacting Office MCI-WEST, Camp Pendleton CA.
TPOC Contact information:
Steve Elggren, (760) 725-3172, steve.elggren@usmc,mil
7. Contracting Officer Authority.
The Contracting Officer is the only person authorized to direct changes in any of the requirements under this contract (Reference Block 31 on the SF1449). In the event the Contractor effects any change at the mailto:steve.elggren@usmc,mil direction of any other than the Contracting Officer, the change will be considered to have been made without authority and solely at the risk of the contractor.