This is a Scope of Work document for the New York State Office for People with Developmental Disabilities (OPWDD) Fingerlakes Developmental Disabilities Service Office (DDSO) facility located at 620 Westfall Road, Rochester, New York 14620. The project involves the installation of concrete furniture pads at the facility, including site preparation, excavation, compaction, formwork, concrete placement and finishing, and landscape restoration. The work must be completed within 60 days of receiving the purchase order. A mandatory site visit was scheduled for Monday, November 30, 2026, at 9:30 a.m. The point of contact is Jeremy Bovenzi at (585) 371-9884. Work is to be performed between 7:00 a.m. and 3:30 p.m., Monday through Friday, and must proceed continuously until completion.
The bid price must include all materials, labor, disposal fees, and site cleanup. This is a New York State Public Works project subject to prevailing wage requirements. Contractors are responsible for any lawn or property damage caused during material delivery or work performance and must secure all tools, debris, and materials at the end of each workday. Prior to commencing work, contractors must participate in a safety meeting with FLDDSO Operations and Maintenance staff and provide applicable Safety Data Sheets and environmental testing documentation. The contractor must schedule a quality control and quality assurance inspection with the Plant Superintendent before equipment removal upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ.pdf | ||
| CP-FL-B0-2026113_ITO_Concrete_Furniture_Pads_WESTFALL_CAMPUS__OVERALL_SITE.pdf | ||
| Concrete Furniture Pads.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SCOPE
DESCRIPTION:
The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 60 days of receiving Purchase Order, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of the ITO Concrete Furniture Pads Project, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.
SCOPE OF WORK includes, but is not necessarily limited to the following:
A. Contractor is to perform site preparations including excavation of soils, compaction of sub-grade, placement and compaction of stone sub-base, formwork, placement and finish of concrete in locations indicated on plans.
B. Contractor is to restore site conditions at the completion of work and is responsible for removals of discarded materials and cleanup at the completion of the project.
C. Contractor is to notify Director’s Representative of their schedule for performing work, start and completion dates and provide advance notice of inspections for the following work:
1. Excavation and Compacted sub-grade
2. Placement of Formwork, compacted stone base and Reinforcing
3. Final Inspection of Concrete placement and finish with sealcoat and finish grades, seeded
SPECIFICATIONS
03 CONCRETE PADS
A. Preparation
1. Excavate to Proper Sub-grade Depth
2. Compact Subgrade to 95% Dry Density
3. Place 6” of Stone
a. Type 2 for sub-base layer compacted.
Facility:
Fingerlakes DDSO
Facility Address:
620 Westfall Rd, Rochester, NY 14620
Point of Contact:
Jeremy Bovenzi
Contact Phone Number:
(585) 371-9884
Project Title:
ITO Concrete Furniture Pads
Summary of Work:
Installation of Concrete Pads
4. Formwork of adequate strength and properly braced
B. Specifications of Work
1. 28 day Compressive Strength: 4000psi Concrete w/ 6x6-2.9x2.9 wwf placed min
1-1/4” from top of slab
2. Place Concrete in temperatures ranging between 50-80degrees.
3. Comply w ACI 301for concrete work
4. Protect slabs against frost and not placed on frozen sub-grade, remove any snow present
5. 4+/- 1” Slump
6. 6% Air Entrainment: ASTM C 260
7. Screed, float and Trowel followed by Broom Finish with medium texture in direction perpendicular to path of travel or in short dimension on rectangular pads using best standard methods and practices for installation and finish applications.
8. Tool all Edges of concrete with ¼” Radius.
9. Control Joints
a. Sawcut in green concrete-1/8”W x 1” D
b. spaced Thk x 2.5= Max spacing in Feet, i.e. 4” thick x 2.5=10’ Max;
otherwise divide area in half and evenly space in both directions, i.e.
12’x12’ Pad, provide (1) control joint at 6’ from edge in both directions.
10. Expansion Joints where intersecting other work and spaced max 40’ apart.
11. Evaporation Retarder: Waterborne, monomolecular, film forming, manufactured for application to fresh concrete.
12. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type
1, Class B, dissipating.
31 EARTHWORK
A. Landscape Repairs
1. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit finish grading to areas that can be planted in the immediate future.
B. Seed and Fertilize
1. Spring Planting April 1- June 1
2. Fall Planting August 15-Oct 15
C. Turf Seed Mix: Proportioned by weight as follows:
1. 25 percent Kentucky bluegrass.
2. 20 percent chewings red fescue
3. 30 percent perennial ryegrass.
4. 25 percent tall fescue.
D. Protect seeded areas by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre to form a continuous blanket 1-1/2 inches in loose thickness over seeded areas. Spread by hand, blower, or other suitable equipment.
1. Anchor straw mulch by crimping into soil with suitable mechanical equipment.
2. Anchor straw mulch with liquid tackifier applied uniformly at manufacturer's recommended rate. Take precautions to prevent damage or staining of structures or other plantings adjacent to mulched areas. Immediately clean damaged or stained areas.
GENERAL REQUIREMENTS:
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.
Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of 7:00am and 3:30pm, Monday through Friday.
Contractor is advised that this is an active work zone and other contractors may be near of around work areas..
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by
OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.
SITE VISIT
A site visit is mandatory. The site visit date was scheduled for Monday, November 30, 2026 @ 9:30a at the project site.
A. Lawn Damage/Property Damage
• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.
• Personal vehicles are not to be parked on the grass.
• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.
B. Continuity of Work/Communication/Scheduling
• Once the job has begun, it is to be worked on continuously until completed.
• If there are any delays, even if due to inclement weather, a Work Control Representative
MUST be contacted.
• Work must be completed within 60 days of receiving the purchase order.
| SCOPE OF WORK includes, but is not necessarily limited to the following: |
| 1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor. |
| 2. Work is to be done between the hours of 7:00am and 3:30pm, Monday through Friday. Contractor is advised that this is an active work zone and other contractors may be near of around work areas.. |
| 3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday. |
| 4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery. |
| 5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD. |
| 6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period. |
| 7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property. |
| 8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work. |
SITE VISIT