MGCS HVAC Requirements Summary

This document specifies technical requirements for the procurement of two complete sets of HVAC units. Each set consists of two 5-ton, three-phase 208VAC heat pumps configured to operate at 60 Hz. Both units require a Meltric 07-P4061 control connector with standardized pinout configuration for common and spare connections, fan, 24VAC supply, heat, and cool functions. Each HVAC unit must include a condensation drain for external tube connection and dual air inlet/outlet ports accepting 16-inch diameter flexible ducting secured with band clamps.

Both units require custom metal frames designed for stackability and transportation, capable of supporting one additional HVAC unit and frame stacked on top, equipped with forklift pockets measuring minimum 8 inches wide by 4 inches tall. The frames must be removable using common hand tools within one hour for maintenance access. The "A" unit requires an HBL5100B9W (or compatible) power input connector and a 100-ampere disconnect panel with two 50-ampere circuit breakers—one dedicated to the A unit and one connected to an HBL560R9W (or compatible) output connector for the B unit. The "B" unit requires an HBL560B9W (or compatible) power input connector. These configurations enable parallel power distribution between the paired units while maintaining independent circuit protection.

View the file

Other files

File Type Posted
RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MGCS HVAC Requirements

Deliverable: Two sets of HVAC units per the requirements below.

Requirements:

1) Each set shall consist of two 5 Ton 3 phase 208 VAC Heat Pumps.

2) Input power for each HVAC shall be three-phase 208VAC 60 Hz.

3) Control Connector for each HVAC shall be Meltric 07-P4061.

4) Control Connector pinout shall be as follows

a. Pin 1: 24 VAC Common (Bl)

b. Pin 2: Spare (Br)

c. Pin 3: Fan (G)

d. Pin 4: 24 VAC Supply (R)

e. Pin 5: Heat (W)

f. Pin 6: Cool (Y)

5) Each HVAC unit shall have a metal frame for the purpose of stacking the set for transportation.

6) Each HVAC frame shall be cable of supporting one HVAC unit and frame on top of the frame

7) The metal frame shall have forklift pockets in the base.

8) The forklift pockets shall measure a minimum 8 inches wide by 4 inches tall

9) The metal frames shall be stackable and secured to each other.

10) The metal frames shall be removable with common hand tools within one hour to allow for maintenance of the HVAC Unit.

11) Each HVAC unit shall have a condensation drain that allows for an external tube connection.

12) Each HVAC Unit shall have an Air Inlet that will accept a 16 in diameter flexible ducting secured with a band clamp

13) Each HVAC Unit shall have an Air Outlet that will accept a 16 In diameter flexible ducting secured with a band clamp.

14) “A” Unit specific requirements

a. The power input connector shall be HBL5100B9W or compatible

b. The unit shall have a 100A disconnect panel mounted to the unit.

c. The disconnect panel shall have two 50A circuit breakers

d. Circuit Breaker 1 shall be for the A unit

e. Circuit Breaker 2 shall be connected to the Output connector for B Unit.

f. The Output connector for the B unit shall be HBL560R9W or compatible

15) “B” Unit specific Requirements

a. The power input connector shall be HBL560B9W or compatible