SOW.pdf

PDF 269 KB Posted

Attached to
Perfect Point CP2-SY-001 E-Drill 2. 0 System
Solicitation number
80NSSC27944128Q
Issued by

About this file

This is a Statement of Work (SOW) for the procurement of specialized equipment and implementation services for Armstrong Flight Research Center (AFRC).

The purchase encompasses three line items totaling approximately four deliverables: (1) a CP2-SY-001 E-Drill 2.0 System package valued at one unit, which includes a Mobile Service Unit, E-Drill 2.0 Hand Tool with 30-foot cable, mounted touch-screen display with customized fastener part number library, rolling tool cart with shadow box foam storage, and a one-year limited warranty on parts and labor; (2) CP1-TR-001 Initial On-site E-Drill Implementation and Training services for North America, consisting of onsite implementation and training by an Application Specialist, trainer travel costs, and customized application development with Part Number Localization; and (3) a CP2-SBV-001 S-Blaster Coating Removal System with accessories, including the S-Blaster System, consumable and media kits, and associated tooling and maintenance accessories. The place of performance is Armstrong Flight Research Center (AFRC), and the period of performance is 30 days After Receipt of Order (ARO).

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

The information listed below is needed to complete this purchase.

2. Characteristics, Scope, and Specs

LINE PART # DESCRIPTION QTY.

1 CP2-SY-001 CP2-SY-001 E-Drill 2.0 System

MSU SN:

Universal Hand Tool, 30ft SN:

System Includes:

- Mobile Service Unit (MSU)

- E-Drill 2.0 Hand Tool with 30ft. cable (CP2-CED-030)

- Mounted Touch-Screen Display and Customized Fastener Part Number Library

- Rolling Tool Cart- Configured to House all E-Drill System Tools, Accessories, Consumables and Maintenance Tools with Shadow Box Foam Includes: One-Year Limited Warranty on Parts/Labor

2 CP1-TR-001 Initial On-site E-Drill Implementation/Training (North America):

· Onsite E-Drill implementation/training by our Application Specialist

· Includes travel costs for trainer

· Customized application development and Part Number Localization

(PNL)

3 CP2-SBV-001 S-Blaster, Coating Removal System with Accessories

SN:

Includes:

- S-Blaster System (CP2-SBV-001)

- Consumable and Media Kits

- Associated Tooling and Maintenance Accessories

3. Place of Performance

Armstrong Flight Research Center (AFRC)

4. Period of Performance

30 days ARO

File details come from the government source that posted it. Updated .