SOW.pdf

PDF 103 KB Posted

Attached to
Brand Name or Equal, T-9 LIFE RAFTS
Solicitation number
FA2823-26-R-0035
Issued by

About this file

This is a Statement of Work for the acquisition of military T-9 life rafts manufactured by EAM Worldwide, dated 23 June 2026. The requirement specifies a yellow life raft with a nine-person capacity, overloadable to thirteen persons, featuring 1676 pounds of total tube buoyancy and 33 square feet of deck area. The raft must operate functionally across a temperature range of -20 to 160 degrees Fahrenheit and be equipped with DOT-3AA2100 and TC-3AAM161 steel cylinders charged to 2100 psig with a 205 square inch cylinder size.

The contractor must comply with applicable standards including t9 CMM 25-60-19 Revision 6, AFI 11-202v3, T.O. 1-1-14, Mil-STD-810G Method 511.5, and Mil-STD-461F, along with all OSHA safety standards and occupational safety regulations. The contractor bears responsibility for resolving any safety citations. Deliverables include a hydrostatic testing certificate for the inflation bottle, and the life raft must be delivered in accordance with all applicable manufacturing standards. Shipping is directed to 3158 Primebeef Way, Duke Filed, FL 32542. No warranty, inspection, maintenance, repair, or ongoing performance period requirements are specified for this acquisition.

View the file

Other files

File Type Posted
COMBO Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

23 Jun 2026

Statement of Work

1.0 Mission Objective & Scope: Purchase requirement is for the acquisition of military T-9 life rafts manufactured by EAM Worldwide.

2.0 Applicable Documents & Standards: IAW t9 CMM 25-60-19 Revision 6 , AFI 11- 202v3, and T.O. 1-1-14. The contractor shall comply with all safety standards and OSHA standards IAW Mil-STD-810G, Method 511.5, Mil-STD-461F. Resolution of citations for violations of Occupational Safety, Health Act Safety, and Health Standards is the contractor's responsibility.

3.0 Technical Specifications: Yellow raft, carry 9 persons overloaded to 13 persons with total tube buoyancy 1676 pounds and total deck area of 33 sq ft. Functional operating temperature of -20 to 160 degrees Fahrenheit. Cylinder Size of 205 square inches, cylinder type DOT-3AA2100 and TC-3AAM161, Steel, with a charge PSI of 2100 psig.

4.0 Warranty: N/A

5.0 Inspection, Maintenance & Repair: N/A

6.0 Deliverables & Reporting: Hydrostatic testing certificate for inflation bottle.

7.0 Logistics, Safety, Shipping & Handling: Shipping to 3158 Primebeef Way Duke Filed, FL 32542.

8.0 Period of Performance and Place of Performance: N/A, acquisition.

9.0 Quality Assurance (QA) & Quality Control: Life raft delivered IAW all applicable manufacturing standards.

File details come from the government source that posted it. Updated .