Summary
This is a Statement of Work (SOW) for an Emergency Spill Clean Up contract at Moody Air Force Base covering the period October 2025 through October 2030 (not-to-exceed 5 years). The contractor shall provide non-personal supplies and services on an as-needed basis when requested by the Contracting Officer or authorized representative. The contract will be executed as a Blanket Purchase Agreement (BPA).
The contractor is responsible for providing personnel, supervision, equipment, environmental service supplies, field and laboratory analytical services, and material samples in compliance with state and EPA regulations. Core services include obtaining contaminated material samples to determine contamination levels; removing or assisting in removal of underground storage tanks (USTs); assisting with aircraft accident clean-up operations including removal, transport, and disposal of contaminated soils and investigative derived waste; and cleaning fuel storage tanks. All operations must comply with OSHA and state safety requirements. The contractor must submit qualified samples to state or federally certified laboratories and provide original analytical reports to the Wing Environmental Coordinator (WEC) containing specific documentation including sample location, date received, analysis dates, analyst names, analytical methods, detection limits, and Chain of Custody documents. Contaminated materials must be disposed of at state-certified landfills, remediated at contractor-operated off-base facilities, or recycled at qualified recycling centers, all subject to WEC approval. The contractor must maintain a minimum 8-hour to maximum 24-hour response time based on emergency or routine requirements. Costs are billed as each (EA), ton (TN), gallon (GL), pound (LB), or man-hour (HR), with landfill tipping fees and material sampling costs passed through with no markup. Updated price lists must be submitted annually at least 30 days prior to effective dates. The contract requires contractor personnel to obtain base visitor passes through Moody AFB's Visitors' Center at the South Gate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Item List.pdf | ||
| Wage Determination.pdf | ||
| Combo-Synopsis.pdf | ||
| Questions and Answers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Title: Emergency Spill Clean Up
Emergency Spill Clean Up
STATEMENT OF WORK
1. DESCRIPTION OF REQUIREMENTS.
The Contract or sha ll furnis h suppli es a nd servic es non-persona l describe d herei n, if a nd when requested by the Contracting Officer (CO), or the authorized representative of the Contracting Officer, during the period of October 2025 through October 2030 (NTE: 5 years).
Scope.
Contractor shall be responsible for providing personnel, supervision, equipment, environmental service supplies, field/laboratory analytical services/supplies, and provide material samples, in accordance with state and EPA regulations.
The Contractor shall obtain potentially contaminated material samples to determine levels of contamination in accordance with state and EPA requirements. Remove or assist in the removal of underground storage tanks (USTs); assist with aircraft accident clean-up operations (remove, transport, and dispose of contaminated soils and investigative derived waste); and cleaning fuel storage tanks. All Contractor operations shall comply with applicable OSHA and state safety requirements. Additional requirements may be identified at a later date.
Sampling/Reporting.
The Contractor shall provide qualified samples to a state or federally certified lab and receive results of testing prior to disposal of materials. Material Sampling will be determined on a case by case basis. Contractor shall provide an original copy of the analytical report results to the Wing Environmental Coordinator (WEC) for all state or EPA required samples.
Analytical Reports.
The Contractor shall provide a laboratory report of each sample taken and sent for analysis.
This report shall contain, at a minimum, the following information:
Description/Location sample was taken.
Name of person taking sample.
The date sample(s) were received at the laboratory. The date(s) analyses were performed.
The name of individual(s) who performed the analyses.
The analytical techniques or methods used.
Detection limits and specific analytical values determined.
Copy of Chain of Custody documents.
2. CONTAMINANT REMOVAL.
The Contractor shall remove contaminated materials as specified by the WEC upon direction of the CO (or the authorized representative of the CO). The Contractor shall perform proper procedures to include “gridding” and sampling the contaminated site prior to beginning the removal. This will insure the complete removal of all contaminated material.
Removal operation shall include personnel, supervision, vehicles, equipment, tools, supplies, and transportation, to include any fees for mobilization, storage/transport containers and dunnage. All material removed shall be disposed of in a state-certified landfill, capable of disposing the particular type of material generated or, remediated at a Contractor-operated-off-base facility, or recycled at a qualified recycling center. Disposal sites must be approved by the WEC to ensure proper regulatory compliance. A copy of all disposal documents, including but not limited to, landfill, remediation, or recycling documents, and weight tickets from state-certified scales, shall be provided to the WEC immediately following disposal.
It is anticipated that the majority of operations will be conducted within the confines of Moody AFB. However, on an infrequent basis, some removal operations may be required at various locations because of the assigned aircraft operating environment. Mobilization of equipment and personnel to Moody AFB are to be included in the cost per ton (TN), pound (LB) or gallon (GL).
Additional mobilization costs will be included in the cost per ton as determined based on the distance from Moody AFB as depicted in Table 1.
The Contractor shall have a minimum of an eight-(8) to a maximum of twenty four-(24)-hour-response time, from the time of notification to begin clean-up operations. The response time will be predicated to the type of response that is required. (Emergency or routine).
The Contractor shall remove contaminated fuel, oil, hydraulic fluid, or other liquids as directed by the WEC. Contaminated liquids shall be transported and recycled at a qualified recycling center capable of recycling the particular liquid waste generated.
The Contractor shall remove absorbent materials contaminated with fuel, oil, hydraulic fluid, or other liquids as directed by the WEC. Contaminated materials shall be transported and properly disposed of in a state-certified landfill or remediated at a Contractor –operated-off-base facility.
The Contractor shall remove contaminated soil from fuel, oil, hydraulic fluid, or other contaminated spill areas as directed by the WEC. Contaminated soil shall be transported and properly disposed of in a state-certified landfill or remediated at a Contractor-operated-off-base facility.
3. COST/PRICING.
All costs/fees shall be billed as each (EA), ton (TN), gallon (GL), pound (LB) or man-hour (HR), as indicated in Table 1.
Prices. Prices quoted to the Government shall be as low as or lower than those charged to the supplier’s most favorable customer(s) for comparable quantities under similar terms and conditions, in addition to any discounts for prompt payment. Price list shall list any extra charges or fees associated with an emergency response.
If at any time the anticipated costs of the project are to exceed the limits of the BPA, the contractor must contact the WEC or CO as soon as possible.
Extent of Obligation. The Government is obligated only to the extent of authorized calls made under this Blanket Purchase Agreement (BPA) by authorized personnel.
Landfill tipping fees. Landfill tipping fees are to be a straight pass-through cost with no mark-up added.
Material sampling costs. Material sampling costs are to be a straight pass-through cost with no mark up added.
Delivery Tickets. All deliveries or shipments under this order shall be accompanied by delivery tickets/invoices or sales slips which shall contain the following minimum information:
Name of supplies or service performed Blanket Purchase Agreement Number XXX-XXX-XXXXX Date of Purchase
Purchase Number (Call #) Itemized List of Supplies or Services Furnished Quantity, Unit Price, and Extension of Each Item, Less any applicable discounts Date of Delivery or Shipment
3. INSPECTION/ACCEPTION.
Inspection/Acceptance. The Government reserves the right to inspect or test any supplies or services which have been tendered for acceptance. The Government may require repair or replacement of non-conforming supplies or re-performance of non-conforming services at no increase in contract price.
4. PRICE LISTS.
An updated price list shall be submitted annually (at least 30 days prior to the effective date) to the CO for approval, review and distribution to ordering activities before the effective date of the price change. The vendor may offer voluntary price reductions at any time without written approval.
6. DISCONTINUANCE. This basic agreement may be discontinued upon thirty (30) days written notice by either party.
7. BASE ENTRY.
The Contractor shall obtain base visitors pass for each person. The following is required for obtaining a visitors pass from the Visitors’ Center at the South Gate:
Driver’s License.
Base pass letter signed by the CO and Contractor management.