This is a Statement of Work for the repair and calibration of a Pressure Breathing for Gravitational (PBG) Tester used by NASA's Armstrong Flight Research Center (AFRC) in Edwards, California to support life support testing for F-18 aircraft oxygen regulators.
The contractor, identified as Eaton (Mission Systems Davenport), is the sole designer and manufacturer of the PBG system and must perform all repairs, calibrations, and overhauls due to proprietary design and technical data ownership. The scope of work requires Eaton to conduct a full diagnostic evaluation of the PBG unit and accessories, perform all necessary repairs using OEM parts and proprietary procedures, calibrate the system and subcomponents using OEM technical publications, perform functional testing to validate leak rates and pressure profiles, provide calibration certification traceable to Eaton-approved standards, ensure compliance with applicable Air Force Technical Orders (T.O. 33D2-10-67-2, T.O. 33D2-10-136-2), and return equipment in ready-for-use condition with proper packaging for safe transport. Deliverables include inspection results and diagnostic reports, calibration certificates, repair summary documentation, verification and functional test results, proper packaging and shipment back to AFRC, and all required documentation demonstrating equipment acceptance and work completion. The period of performance is 12 months from the award date to accommodate repair cycles, calibration lead time, shipping, and administrative requirements. Travel is not applicable to this contract. Special requirements and considerations will be determined individually for each piece of equipment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP #
STATEMENT OF WORK
Title: Repair and Calibration of Tester, Field, PBG, Oxygen Regulator
National Aeronautics and Space Administration Armstrong Flight Research Center Edwards, California
Table of Contents
1.0 Background
2.0 Objectives
3.0 Requirements
4.0 Deliverables
5.0 Period of Performance
6.0 Travel
7.0 Other Special Requirements and Considerations
RFP/Contract No. Repair and Calibration of Tester, Field, PBG, Oxygen Regulator 14 May 2026
1.0 Background
AFRC utilizes the Pressure Breathing for Gravitational (PBG) Tester (JCAST) to support life support testing requirements for our F-18 aircraft. The PBG is mandatory for the proper testing of aircraft oxygen regulators.
Eaton (Mission Systems Davenport) is the sole designer and manufacturer of the PBG Due to proprietary design and technical data ownership, all repairs, calibrations, and overhauls must be performed by Eaton.
2.0 Objectives
The objective of this requirement is to ensure the full restoration, calibration, and verification of the AFRC PBG system to OEM standards so that accurate, safe, and repeatable life support testing can be performed in support of flight operations
.3.0 Requirements
The contractor (Eaton) shall:
Conduct full diagnostic evaluation of the PBG unit and all accessories.
Perform all necessary repairs using OEM parts and proprietary procedures.
Calibrate the PBG and subcomponents using the OEM technical publication Perform functional testing to validate leak rates, pressure profiles, and performance criteria as required for aircrew ensemble testing.
Provide a certification of calibration traceable to eaton-approved standards.
Ensure all work complies with applicable Air Force Technical Orders (T.O. 33D2-10-67-2, T.O.
33D2-10-136-2) Return equipment in ready‑for‑use condition, packaged for safe transport.
Complete repairs within Eaton’s standard timeline from receipt of equipment.
4.0 Deliverables
Eaton shall provide:
Inspection results and diagnostic report Calibration certificate(s) Repair summary documentation Verification and functional test results Proper packaging and shipment back to AFRC All required documentation demonstrating equipment acceptance and completion of work
RFP/Contract No Repair and Calibration of Tester, Field, PBG, Oxygen Regulator
5.0 Period of Performance
The period of performance is 12 months from award date. This allows for repair cycles, calibration lead time, shipping, and administrative requirements.
6.0 Travel
Not applicable
7.0 Other Special Requirements and Considerations
To be determined individually for each piece of equipment.
RFP/Contract No Repair and Calibration of Tester, Field, PBG, Oxygen Regulator
REVISIONS
Revision Number Date Brief Summary of Changes
Base