SOW.pdf
PDF 2 MB Posted
- Attached to
- Re-tube Boiler
- Solicitation number
- 15B11726Q00000006
About this file
Statement of Work Summary
This is a Statement of Work for the removal and replacement of boiler tubes and burner heads at the Federal Bureau of Prisons' United States Penitentiary (USP) Lee in Pennington Gap, Virginia. The contractor must remove and replace all existing tubing in Boiler #1 (Cleaver Brooks Model FLX-200-1200-160HW) and replace the burner heads. Work must be scheduled during USP Lee's normal operating hours (Monday through Friday, 7:00 a.m. to 2:30 p.m., excluding Federal Holidays), with any work outside these hours requiring advance approval from the Contracting Officer's Representative (COR) and Contracting Officer. The contractor is responsible for providing all new boiler tubes, disposing of old tubes and boiler parts, removing and reinstalling boiler panels for access, performing lockout/tagout procedures, reassembling the boiler, conducting hydro testing to operating pressure, and ensuring tube roll tightness. All work must comply with seismic zone requirements, environmental compliance, Life Safety codes, NFPA, ADA-ABA, and Federal, State, and Local codes and regulations.
The contractor must provide three copies of Safety Data Sheets for all materials used and ensure all employees wear required personal protective equipment in accordance with OSHA standards. Security clearances must be submitted a minimum of 30 days prior to work start, and all contractor employees must obtain and wear institution-issued picture ID/contractor badges. A five-year written guarantee covering all material and workmanship is required. The FBOP will provide minimal electricity (120V), restroom services, and staging areas for contractor materials and equipment. The contractor bears responsibility for loading, unloading, and transporting materials without impeding institutional operations, and must remove all old equipment and materials at their own expense while restoring Federal property to its original condition. All work is subject to evaluation under FAR Part 42, with COR oversight and approval required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ.pdf | ||
| Statement of Work - USP LEE 26ZAM6 Retube Boiler 1.pdf | ||
| RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .