SOW.pdf
PDF 347 KB Posted
- Attached to
- Pacific Shear & Hardinge Lathe Repair Federal contract opportunity
- Solicitation number
- 80NSSC25903159Q
About this file
This Statement of Work (SOW) details repair services for two machines located at NASA Armstrong Flight Research Center (AFRC) in Edwards, California. VetPowered will perform comprehensive repair services for a Pacific Shear Model 500HD8 and a Hardinge Lathe Model HLV-H, involving a six-day process that includes on-site measurements, custom bracket fabrication, hydraulic cylinder removal and rebuilding, and replacement of specific parts. For the Pacific Shear, the work includes measuring and removing hydraulic cylinders, rebuilding them with replacement O-rings, U-cups, rod packing, and filter, with a firm-fixed price covering six days of labor and travel. The Hardinge Lathe repair involves one day of labor, procurement and installation of a new power feed and controller, and requires returning the core components to the manufacturer for pricing. The period of performance has a lead time not exceeding 16 weeks once awarded, with the work to be completed at NASA AFRC in Edwards, California.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements Repair of QTY 1 Pacific Shear Model 500HD8 and QTY1 Hardinge Lathe Model
HLV-H.
2. Characteristics, Scope, and Specs
The contractor shall perform the following duties:
Vet Powered (https://vetpowered.com/) service technician will procure and install listed part under “Replacement Part” (if possible) for a Pacific Shear model 500HD8 S3 S10210 located at NASA AFRC in Edwards Ca.
This Firm-Fixed price covers up to six (6) days of Labor and Travel from Vet Powered Facilities
Day #1 (At Customer Site) Measure hydraulic cylinders at customer site in order to design and fabricate a bracket (or similar) that would be used to secure/lift/remove the hydraulic cylinders.
Day #2 (At VetPowered Facility in San Diego) Design and fabricate custom bracket to use to secure/lift/remove the hydraulic cylinders.
*Day #3 (At Customer Site) VetPowered to return to customer site and remove hydraulic cylinders; LOTO the machine; Return to VetPowered facility in San Diego, CA with the removed hydraulic cylinders for rebuild and installation of parts;
*Please note: VetPowered will require a customer provided forklift to complete the scope of work listed above. *
Day #4 (At VetPowered facility in San Diego, CA) Rebuild hydraulic cylinders and install the following Replacement Parts:
O-ring (Left) Qty: 2, U-cup (Left) Qty: 2, O-ring (Right) Qty: 2, U-cup (Right) Qty: 2, Rod Packing Qty: 2;
*Day #5 - #6 (At Customer Site) Return with the hydraulic cylinders to the customer site; Remove LOTO;
Reinstall hydraulic cylinders; Replace Filter Qty: 1 and Oil Qty: 1;
(Customer will be responsible for disposing of the oil) Op test;
*Please note: VetPowered will require a customer provided forklift to complete the scope of work listed above.* Replacement Parts for Pacific Shear Model 500HD8 Serial #S10210:
Replacement Filter Qty: 1 Replacement O-ring (Left) Qty: 2 Replacement U-cup (Left) Qty: 2 Replacement O-ring (Right) Qty: 2 Replacement U-cup (Right) Qty: 2 Replacement Rod Packing Qty: 2 Replacement Oil Qty: 1 (Customer will be responsible for disposing of the oil)
*Customer (NASA) will provide forklift support to complete the Scope of Work.
VetPowered service technician will procure and install Listed parts below, Op’s test and provide full Preventive Maintenance (if possible) for a Hardinge Model HLV-H S# HLV-H-1511 located NASA AFRC in Edwards Ca.
This Firm-Fixed price quote covers up to one (1) day of labor and travel to and from job site.
If additional parts/labor are required, VetPowered will provide a written Quote to the customer for approval before proceeding.
Procure, install, and Op’s check New Power Feed and Controller for Hardinge Model HLV-H S# HLV-H-1511
VetPowered to remove components and return Core to manufacturer to provide pricing.
If Core is not returned, additional cost will apply and a new estimate will be provided to the customer.
3. Place of Performance
NASA AFRC Edwards AFB Ca
4. Period of Performance Lead time for parts and services will not exceed 16 weeks once Awarded.
File details come from the government source that posted it. Updated .