SOW.pdf
PDF 82 KB Posted
- Attached to
- Demolition B9329 Federal contract opportunity
- Solicitation number
- FA466125R0001
About this file
This document is a Scope of Work (SOW) for the demolition of Building 9329 at Dyess Air Force Base in Texas. The project involves the complete demolition of the 417 square foot building, including concrete slabs, foundations, sidewalks, utilities, and related infrastructure. The contractor is responsible for all demolition, site preparation, and landscaping activities. The SOW outlines specific requirements for safety, environmental considerations, construction, and pricing. It references attachments with additional project details, specifications, and as-built drawings. The related federal contract opportunity is a pre-solicitation notice for this demolition project, with the solicitation expected to be posted on or about October 17, 2024. This is not a solicitation, and proposals will not be accepted at this time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment B Specifications.pdf | ||
| Attachment A Asbestos Survey.pdf | ||
| Attachment C As-builts.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MACC SOW Dyess AFB, Texas
12 September 2024 SCOPE OF WORK (SoW)
PROJECT TITLE: Demolish Bldg 9329
PROJECT NUMBERS: FNWZ 2 - 0
TYPE OF WORK: Demolition (536 monies)
POINTS OF CONTACT:
(1) BCE Representative: Mr. Darian Flores, 7CES/CEN, (325) 696-5669
(2) Contracting: Ms. Traci Hughes, 7 CONS/PKA, (325) 696-2272
(3) Communications: Mr. Joe Mason 7 CS/SCX, (325) 696-5564
1.1 GENERAL:
1.2 Base bid 1 with Bldg 9329 has an approximate total square footage of 417. This projects will demolish in its entirety to include concrete slabs and foundations to a depth of three feet below existing grade elevation. This will also include, but not limited to the following: sidewalks, drives, utilities, select fill, tops of structural concrete piers & pier caps, steel reinforcing, wood framing, gypsum board, transite panels, doors, frames, windows, caulking, gypsum & lay-in ceilings/grid, floors, carpet, tile, plumbing lines & fixtures, accessories, furniture, insulation, wood & metal framing, HVAC units, ducting & registers, piping, pumps, electrical panels, conduit, wiring, lighting, transformers, gas lines & meters, roofing, flashing, etc.
1.3 Contractor shall verify all existing conditions at the sites prior to bidding and follow all the requirements as indicated in the attached contract drawings and specifications.
1.4 Scope: The Contractor shall furnish all demolition, layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, shoring, tools, fencing and incidentals and performing all operations in connection with the demolition of Building 9329.
2.1 SAFETY: Contractor shall follow base standard safety & Occupational Safety and Health Administration (OSHA) guidelines throughout construction duration.
3.1 ENVIRONMENTAL ENGINEERING:
3.2 Building 9329 is free of asbestos and does not require any removal or disposal of in accordance with all local, state, & federal requirements prior to building demolition. Refer to Attachment “A” – Asbestos Report.
3.3 Contractor shall assume all painted surfaces contain lead unless he conducts sampling and testing that proves otherwise. Contractor shall provide appropriate worker protection for any work that involves sanding, grinding, or other activities that may cause such lead to become airborne. All demolished lead items, such as plumbing flashing, shall be recycled. All waste shall be disposed of in accordance with local, state, and federal requirements.
4.1 GENERAL CONSTRUCTION REQUIREMENTS:
4.2 The Contractor is responsible for field verifying all information given & provide all work. The Contractor shall be responsible for coordination of project work activities with the Contracting Officer that would interrupt or limit the on-going daily activities and/or functions of neighboring facilities. Any survey required to provide utility locations, manhole inverts, verification of existing features, etc., shall be the responsibility of the Contractor and shall tie into the project datum.
MACC SOW Dyess AFB, Texas
4.3 Haul Route: Approved haul route is from the Tye Gate to Rapcon Rd. Contractor is required to use the Tye Gate for all access.
4.4 Refer to Attachment “B” – Specifications for additional project requirements.
4.5 Contractor shall haul in topsoil & grass seed the area disturbed by demolition & former building/walks/drives/slab locations. Topsoil shall be a minimum of 4” thick over a compacted subgrade (95% standard proctor). All areas shall slope away from former building & drive locations; no ponding of water shall be allowed. Prepare topsoil for receiving of grass; refer to Specifications.
5.1. EXISTING AS-BUILTS: All available and relevant as-built drawings are provided by the Government as electronic copy on CD-Rom in either *.tif images or *.pdf Adobe formats, refer to Attachment “C”- As-Builts on CD. All existing site, utility, facility conditions and dimensions shall be field verified by Contractor.
6.1 DIRECTION: The Contractor shall accept directions only from the Dyess AFB Contracting Officer (CO).
Requests or desires of the users or using agency made directly to the Contractor shall be immediately brought to the attention of the CO. Any changes to the project scope or other provisions of the SoW must be authorized in writing by the CO.
7.1 PRICING SCHEDULE: Refer to Attachment “D” – Pricing Schedule