SOW.pdf
PDF 110 KB Posted
- Attached to
- Service Agreement for Li-Cor LI-6800F
- Solicitation number
- 12305B24Q0203-O
About this file
This document is a Statement of Work (SOW) for a Service Agreement for a Li-Cor LI-6800F Portable Photosynthesis System with Fluorometer. The U.S. Department of Agriculture (USDA), Agricultural Research Service (ARS), Northeast Area (NEA) Floral and Nursery Plants Research Unit (FNPRU) requires this service agreement plan. The contractor must be a certified/trained Li-Cor technician and provide free replacement for extensive damage, water damage coverage, impact damage coverage, voltage damage coverage, a free loaner instrument, 2 calibrations, and free cavity replacements for trace gas analyzers. The estimated period of performance is a base period plus 4 option years from September 30, 2024 to September 29, 2029.
The related federal contract opportunity is a combined synopsis/solicitation for commercial products and services under Solicitation Number 12305B24Q0203-O. It is a full and open competition under NAICS code 811210. Offerors must submit documentation demonstrating technical capability, a firm fixed price quotation valid for 60 days, and their Unique Entity ID. Award will be made on a lowest price technically acceptable basis. All responsible sources may submit an offer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CLAUSES_PROVISIONS_O.pdf | ||
| WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Service Agreement for Li-Cor LI-6800F
The USDA, Agricultural Research Services (ARS), Northeast Area (NEA) Floral and Nursery Plants Research Unit (FNPRU) requires a service agreement plan for a Portable Photosynthesis System with Fluorometer (Li-Cor LI-6800F System).
Technical Requirements:
• Contractor must be certified/trained LiCor technician.
• Free replacement for extensive damage
• Water damage coverage
• Impact damage coverage
• Voltage damage coverage
• Free loaner instrument
• 2 Calibrations
• Free cavity replacements for trace gas analyzers
Estimated Period of Performance:
Base, Plus 4 Options 30 September 2024 – 29 September 2029
File details come from the government source that posted it. Updated .