About this file

This document is a Scope of Work (SOW) for a housing carpet and flooring replacement project at a U.S. Coast Guard base in Cheboygan, Michigan. The SOW details the requirements for the contractor to remove and dispose of existing carpet, repair subfloors, and install new stain-resistant carpet, padding, and vinyl flooring.

Key details include:

  • Carpet and flooring specifications, including brand names and product details
  • Estimated square footage for carpeted and vinyl flooring areas
  • Requirement to obtain approval from the Contracting Officer's Representative (COR) for any deviations from the specified materials
  • Coordination requirements, including work hours, site cleanliness, and disposal of materials
  • Project completion timeline, with all work to be performed by September 30, 2024

This SOW is associated with a federal contract opportunity, Solicitation Number 70Z03024QCLEV0081, for the U.S. Coast Guard Cheboygan Housing Flooring Replacement project. The estimated value of the procurement is less than $15,000, and the applicable NAICS code is 238330 (Flooring Contractors) with a Small Business Size Standard of $19.0M.

View the file

Other files

File Type Posted
MI20240006.pdf PDF
RFQ (START HERE).docx DOCX document
REQUEST FOR INFORMATION.docx DOCX document
SF 1442.pdf PDF
REFERENCE INFORMATION.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Homeland Security United States Coast Guard

Base Cleveland Housing Division

Scope of Work (SOW) Housing Site

Cheboygan, MI For

Home Carpet Replacement

Point of Contact (POC) DC1 Jose Castro

(231) 627-7882

Or DCC Coyet Carter (OHMC)

(443) 760-5034

Site Addresses

One Story Unit 635 Blackthorn Dr.

Cheboygan, MI 49721

Scope of Work

Carpet Area -

1.1 The contractor is to remove all carpet on stairs and on the second floor along with the padding to be replaced and dispose of all materials off the USCG property at the contractor expense to an approved disposal site.

1.2 The contractor will repair or replace any damaged or loose tack strips as needed;

inspect and repair the subfloor for any loose staples, screws, nails, and etc.;

identify and report any water, pet staining or odors, or any other abnormal damages that may cause further damage or odors to the USCG POC before continuing work.

1.3 All flooring will need to be cleaned of all loose debris, swept and/or vacuumed, before installing any new materials.

1.4 Install any needed rubber shims to level the carpet with any other flooring in use and install transitions to areas connecting to different flooring materials.

1.5 Install stain resistant padding and carpet following the manufacturer’s recommendations.

1.6 Carpet installation on stairs is to be tucked.

Material/ Part Information

2.1 All materials will be supplied by the contractor.

2.2 8# 3/8” Spill guard padding is to be used.

2.3 Mohawk Dynamic Quality I color Spice Cake color is to be used.

2.4 All rubber shims used will be Johnsonite LS-40-E (D or E according to thickness required).

2.5 All transitions and other exposed materials planned for use will have to be approved by the POC listed for quality and color. Johnsonite #CEXXC Aluminum track and Johnsonite rubber #47 chocolate brown both in 12’ length should be used.

2.6 Underlayment for all hard flooring is to be a minimum of 2mm thick and will provide moisture barrier protection and sound reduction. One option would be Silver Vapor’s 3-in-1 flooring underlayment (2mm).

2.7 All hard flooring to be installed will be Mannington Vinyl Prime, color TBD. Any deviation from this must meet the same specifications of the above flooring, especially for thickness, durability, and function. All deviations outside the flooring listed above must be previously approved by the Coast Guard listed POC.

2.8 Approximate square footage is listed below per unit per install area; contractor is to measure for accuracy and may do so prior to submitting a bid, padding and carpeting measurements are to include stairs:

Carpeted Estimate Vinyl Floor Estimate

635 Blackthorn Dr. – 950 sq. footage 530 sq. footage (not required) Cheboygan, MI 49721

References

3.1 All work is to be completed shall comply with Federal, State and Local Laws, Codes and Regulations.

Liabilities

4.1 The contractor will be financially responsible for all damages incurred while working on Government property.

Coordination

5.1 All communications will go through the POC listed. No work can be modified or changed without their permission.

5.2 Work to be completed should have minimal impact on the unit’s operation. In the event any of the utilities need to be secured, these items should be well planned out.

5.3 Normal work hours for the unit is 8:00 AM to 4:00 PM, Monday-Friday, excluding all Federal Holidays. Any work outside these times needs to be worked out ahead of time.

5.4 All required License, Certificates, Accreditation Card, etc. will be submitted with the quote or bid.

Project Completion

6.1 All work completed is up to the POC’s approval. The site is to be at a minimum as clean of a condition it was found in. All trash, debris, materials removed, etc.

should be properly disposed by the contractor. There will be no on-site storage available for the duration of this project.

6.2 This contract will be awarded for multiple addresses, all with different start schedules; these will not run consecutively but as available units become vacant. The contractor will be given a one-week window to schedule and complete each job. The Coast Guard POC will attempt to provide a 30-day notice prior to the availability timeline as they have the ability to do so. All jobs will be completed no later than September 30, 2024.

File details come from the government source that posted it. Updated .