SOW.pdf

PDF 273 KB Posted

Attached to
CG Sector Detroit Overhang Concrete Soffit Removal and Disposal
Solicitation number
37220Q230000090
Issued by

About this file

This statement of work outlines the requirements for a project to remove an overhanging concrete soffit and dispose of the materials. The contractor will be responsible for blocking off the road, safely removing and hauling away all concrete boards, wire mesh, and hanging materials from the overhang, and cleaning the work site upon completion. The period of performance is 20 calendar days at the United States Coast Guard Sector Detroit facility. The contractor must provide qualified personnel including a project manager available via phone during business hours. Upon completion, the designated contracting officer's representative will inspect the work site. Invoices should be submitted through the Invoice Processing Platform.

The related federal contract opportunity is a solicitation to obtain these overhang concrete soffit removal and disposal services with a response due date of [DATE]. The solicitation was issued by the United States Coast Guard under opportunity number 37220Q230000090.

View the file

Other files

File Type Posted
Questions and Answers.docx DOCX document
PICTURES.pdf PDF
Provisions and Clauses.pdf PDF
Wage Determinations.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

LAST UPDATED: 08/17/2023 PAGE 1/5

STATEMENT OF WORK (SOW)

FOR

Overhang Concrete Soffit Removal and Disposal

1.0 GENERAL

1.1 BACKGROUND

A Concrete Soffit comprised of concrete boards, wire mesh and metal hangers is sagging and needs to be removed to prevent injury to personnel or further damage to property and vehicles.

1.2 SCOPE

1. All work shall be conducted in accordance with all local, state and federal building codes.

2. Place safeguards to ensure all utility piping, electrical panels, conduit and lights are protected from damage.

3. Block of road area adjacent to work area to ensure cars are not passing by during the removal of the overhang material.

4. Remove and haul away all concrete boards, wire mesh, and wired hanging material.

5. Remove all safeguards that were put in place.

6. Once the tasks are completed the area shall be cleaned of all debris, materials, and construction equipment. Work site will be inspected by DCC Joseph Cendejas upon completion.

1.3 OBJECTIVE

The project goal is to have the sagging soffit and its hangers removed and disposed of.

1.4 APPLICABLE DOCUMENTS

N/A

1.4.1 Compliance Documents

The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:

1.4.2 Reference Documents

The following documents may be helpful to the Contractor in performing the work described in this document:

2.0 SPECIFIC REQUIREMENTS/TASKS

1. All work shall be conducted in accordance with all local, state and federal building codes.

2. Place safeguards to ensure all utility piping, electrical panels, conduit and lights are protected from damage.

3. Block of road area adjacent to work area to ensure cars are not passing by during the removal of the overhang material.

4. Remove and haul away all concrete boards, wire mesh, and wired hanging material.

5. Remove all safeguards that were put in place.

LAST UPDATED: 08/17/2023 PAGE 2/5

6. Once the tasks are completed the area shall be cleaned of all debris, materials, and construction equipment. Work site will be inspected by DCC Joseph Cendejas upon completion.

3.0 CONTRACTOR PERSONNEL

It is the responsibility of the contractor to propose qualified contractor personnel to perform all requirements specified in the SOW

3.1 QUALIFIED PERSONNEL

The Contractor must provide qualified personnel to perform all requirements specified in this

SOW.

3.2 CONTINUITY OF SUPPORT

The Contractor must ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement.

3.3 PROJECT MANAGER

The Contractor must provide a Project Manager who must be responsible for all Contractor work performed under this SOW. The Project Manager must be a single point of contact for the Contracting Officer and DCC Cendejas. The name of the Project Manager, and the name(s) of any alternate(s) who must act for the Contractor in the absence of the Project Manager, must be provided to the Government as part of the Contractor's proposal. The Project Manager is further designated as Key by the Government. During any absence of the Project Manager, only one alternate must have full authority to act for the Contractor on all matters relating to work performed under this contract. The Project Manager and all designated alternates must be able to read, write, speak and understand English. Additionally, the Contractor must not replace the Project Manager without prior approval from the Contracting Officer.

3.4 The Project Manager must be available to DCC Cendejas via telephone between the hours of 0730 and 1530 EST, Monday through Friday, and must respond to a request for discussion or resolution of technical problems within 05 hours of notification.

3.5 EMPLOYEE IDENTIFICATION

3.5.1 Contractor employees visiting Government facilities must wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, name, clearance-level and badge expiration date. Visiting Contractor employees must comply with all Government escort rules and requirements. All Contractor employees must identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times.

3.5.2 Contractor employees working on-site at Government facilities must wear a Government issued identification badge. All Contractor employees must identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times.

LAST UPDATED: 08/17/2023 PAGE 3/5

3.6 EMPLOYEE CONDUCT

Contractor’s employees must comply with all applicable Government regulations, policies and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor must ensure Contractor employees present a professional appearance at all times and that their conduct must not reflect discredit on the United States or the Department of Homeland Security. The Project Manager must ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.

3.7 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS

The Government may, at its sole discretion (via the Contracting Officer), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons.

Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.

4.0 OTHER APPLICABLE CONDITIONS

4.1 SECURITY

Security Risk and Background Investigation Form Requirements

The requirements office anticipates the following:

Check Applicable Box

Tier Investigation

Risk Form

X 1 Low Risk, Non-Sensitive, Physical/Logical Access (HSPD-12 Credentialing)

SF85

2 Moderate Risk, Public Trust SF85P 3 Non-Critical Sensitive, L, Confidential and

Secret Information

SF86

4 High Risk, Public Trust SF85P 5 Q, Top Secret, Compartmented

Information, Critical Sensitive, Special Sensitive

SF86

Contractor access to classified information is not currently required under this SOW. However, the Government at a later date may require all Contractor personnel to have Secret clearances.

Accordingly, all Contractor employees provided for this requirement must be eligible for a Secret Clearance.

4.2 PERIOD OF PERFORMANCE

The period of performance for this contract must not exceed 20 calendar days from the date of award.

4.3 PLACE OF PERFORMANCE

The primary place of performance will be at the United States Coast Guard Sector Detroit at 110 Mt. Elliott St, Detroit, MI 48336.

LAST UPDATED: 08/17/2023 PAGE 4/5

4.4 HOURS OF OPERATION

Contractor employees must generally perform all work between the hours of 0700 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees must be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.

4.5 TRAVEL

Contractor travel must not be required for this requirement.

4.6 PROGRESS MEETINGS

The Project Manager must be available to meet with the DCC Joseph Cendejas upon request to present deliverables, discuss progress, exchange information and resolve emergent technical problems and issues. These meetings must take place at Sector Detroit.

5.0 GOVERNMENT FURNISHED RESOURCES

The Government will not furnish any resources to the Contractor in support of this contract.

6.0 CONTRACTOR FURNISHED PROPERTY

The Contractor must furnish all facilities, materials, equipment and services necessary to fulfill the requirements of this contract.

7.0 GOVERNMENT ACCEPTANCE PERIOD

DCC Joseph Cendejas will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, DCC Cendejas will send an e-mail to the Contractor notifying it that the deliverable has been accepted.

7.1 DCC Cendejas will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the DCC Cendejas of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.

7.2 DCC Cendejas will have 03 business days to review deliverables and make comments.

The Contractor must have 30 business days to make corrections and redeliver.

7.3 All other review times and schedules for deliverables must be agreed upon by the parties based on the final approved Project Plan. The Contractor must be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review.

The Contractor must work with personnel reviewing the deliverables to assure that the established schedule is maintained.

8.0 INVOICING PROCEDURES

Invoices shall be submitted to Invoice Processing Platform.

8.1 Invoice Processing Platform (IPP)

For most U.S. Coast Guard awards established on or after October 1, 2021, contractors must submit proper invoices through the Invoice Processing Platform (IPP), a secure web-based, payment information system provided by the U.S. Department of the Treasury's Financial

LAST UPDATED: 08/17/2023 PAGE 5/5

Management Service. The service is available free of charge to all Federal agencies and their suppliers.

8.2 Enrollment actions to take after you have an applicable award:

If you are already enrolled in IPP through another award or agency: If your company is already registered to use IPP, you will not be required to re-register and you do not need to contact IPP.

If you are NOT already enrolled in IPP: The point of contact you provided in your SAM.gov registration will receive two emails from ipp.noreply@mail.eroc.twai.gov. Please note that emails from this email address may filter into your spam or junk folder: 1. The first email will have the IPP Logon ID and a link to the IPP application. 2. A second email, which will be sent within 24 hours of the first email, contains a temporary password. Once your contact receives these emails, please ensure they log into IPP and complete the registration process. If you are not enrolled in IPP, you must contact the FINCEN Vendor Support Team at FIN-SMB- FSMSVendorSupport@uscg.mil. You will not be able to "sign up" for IPP. You must have a current award and be enrolled by working through your FINCEN points of contact.

8.3 IPP Training and Support

Vendor training materials, including a first-time login tutorial, are available on the https://www.ipp.gov/ website. Once you have logged in to the IPP application, you will have access to user guides that provide step-by-step instructions for all IPP capabilities, ranging from creating and submitting an invoice to setting up email notifications. Live webinars are held monthly and provide a great opportunity to learn the basic of the system and to call in and ask the IPP team questions about the IPP application. IPP Customer Support is available to assist system users: · Toll-free number: 866-973-3131 · Email address:

IPPCustomerSupport@fiscal.treasury.gov · Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am - 6:00 pm EST

File details come from the government source that posted it. Updated .