SOW.pdf
PDF 175 KB Posted
- Solicitation number
- 80NSSC23840329Q
About this file
This statement of work outlines requirements for the purchase of a refurbished Edwards M150 GRC abatement system and cartridge trolley. The National Aeronautics and Space Administration Shared Services Center seeks to procure one refurbished Edwards M150 GRC abatement system and one operational GRC cartridge trolley for use in the Fabrication Lab at Goddard Space Flight Center. Delivery is required within 6-8 weeks of award. The contractor will ship the equipment from its own facility to Goddard Space Flight Center. The period of performance is approximately 6-8 weeks after award.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase of Edwards M150 GRC Abatement System and GRC Cartridge Trolley for GSFC 551 Fabrication Groups Lab
June 15, 2023
PR: _____________________
Background This statement of work is to purchase an Edwards M150 GRC abatement System for use in the Fabrication Lab. We need this unit in order to safely operate coatings and fabrication equipment. Due to the high cost of purchasing new, a refurbished unit was deemed appropriate to purchase from Trillium.
Scope 1x refurbished M150 unit as well as 1x cartridge trolly shall be purchased, shipped, and delivered to B5 E70. From there the members of the 551 Fabrication group shall proceed with the implementation and installation of this unit.
Requirements The manufacture shall provide the following:
• 1x Refurbished Edwards M150 GRC Abatement System
• 1x Operational GRC Cartridge Trolley (150)
Deliverables or Delivery Schedule
Deliverable Projected Completion Date
Refurbished Edwards M150 GRC Abatement System and Cartridge Trolley
6-8 weeks ARO
Government-Furnished Equipment and Government-Furnished Information
The vendor will not use any government furnished equipment or information to complete this project.
Place of Performance
The contractor will use its own facility to ship the abatement system.
Period of Performance
The period of performance will be approximately 6-8 weeks after award is given.