View the file

Other files

File Type Posted
RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ref:

Range Code 840 MRCS2 HVAC Equipment Simplified Acquisition Purchase

Note: This equipment has a long lead time of approximately 26 weeks. Equipment shall include hot gas reheat for dehumidification control.

SOW: Purchase two Bard HVAC equipment and two programmable temperature & humidity controllers. Deliver to Wallops Flight Facility building F‐19 Wallops Island, VA

Quantity: 2 Bard Model W60ACDB09XXAX2J; 5‐ton AC 11‐EER | 208/230V 3Phas e | Aluminum | 9KW Electric Heat | Barometric Fres h Air Damper ‐ Std | 1" Dis pos able Filter | “Technicoat” Condenser Coil | Low Ambient Control & Alarm Relay | Hot Gas Reheat Dehumidification

Quantity 2

BARD TEMP & HUMIDITY CONTROLLER PROGRAMMABLE 3H/3C

Quantity 2

File details come from the government source that posted it. Updated .