SOW.docx

DOCX document 79 KB Posted

Attached to
USCG New Orleans ATON Fence Repair
Solicitation number
70Z02925QNEWO0185
Issued by

About this file

This is a Statement of Work (SOW) for a fence repair project at the U.S. Coast Guard Base in New Orleans, Louisiana. The project involves inspecting and repairing approximately 1,200 linear feet of damaged galvanized steel chain-link fencing and anti-intrusion barbed wire at the Buoy Yard, with the goal of creating a uniform barrier with functioning gates. The solicitation is a small business set-aside under NAICS code 238990, resulting in a Firm-Fixed Price Construction Contract awarded to the lowest-price quoter.

Key requirements include replacing or repairing fencing components, gates, stanchions, and barbed wire, with all work to be completed by a licensed contractor between 8:00 AM and 4:00 PM, Monday through Friday. The contractor must provide submittals within 14 calendar days after contract award, begin work within 14 calendar days of submittal approval, and complete the project within 30 calendar days. Safety, environmental compliance, and proper waste disposal are critical, with specific requirements for site access, material handling, and adherence to federal regulations. The contract includes a one-year workmanship warranty.

View the file

Other files

File Type Posted
Wage Rates.txt TXT text file
Construction Clauses (Mar) 2025.odt ODT document
SF-1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Base New Orleans Buoy Yard Fence Repair

Located at U.S. Coast Guard Base New Orleans 1790 Saturn Blvd.

New Orleans, La

August 2025

Commanding Officer United States Coast Guard Base New Orleans, LA Facilities Engineering Department New Orleans, LA 70129

CWO Mike Ackiss Assistant Facilities Engineering Officer Base New Orleans, LA

PART 1: GENERAL

1. INTENT: The intent of this project is to inspect and repair damaged galvanized steel chain-link fencing and anti-intrusion barbed wire at the Buoy Yard on the Coast Guard Base in New Orleans, LA. All parts, installation, and repairs shall meet or exceed manufacturers specifications and industry standards. Upon completion, all fencing will provide a uniform barrier with functioning gates and continuous barbed wire topper. All work shall be completed by a licensed contractor with in-depth knowledge of commercial fence repair. All work shall be completed as outlined in this Scope of Work. No work is authorized without the authorization of the Contracting Officer (KO) or the Contracting Officers Representative (COR).

2. SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel to replace or repair all fencing, gates, stanchions, barbed wire, and associated hardware surrounding the Buoy Yard. All waste materials will be disposed of off-site. No modifications outside of the Statement of Work criteria are authorized without permission from the contracting officer or their representative.

3. BACKGROUND: Existing Buoy Yard fencing, approximately 1,200 linear feet long and 7 feet tall, sustained storm damage and requires evaluation, repair, and replacement of fencing components to create a uniform barrier.

4. QUALIFICATIONS: Contractor shall provide personnel who have the knowledge, qualifications, and working experience to perform the functions outlined in this Scope of Work.

5. CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facility’s normal operations. Perform all on-site work between the hours of 8:00 AM and 4:00 PM, Monday through Friday (federal holidays excluded), unless otherwise approved by the Contracting Officer or Contracting officer’s representative.

6. GOVERNMENT FURNISHED MATERIALS: None

7. GOVERNMENT FACILITIES AND UTILITIES: Electrical power and water are available within proximity. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded. Telephone services will not be available for use by the contractor. Building restroom facilities are available for use.

8. SAFETY: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with and abiding by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series), 29 CFR 1926 (series), State and Local safety laws, rules and regulations. Any operation defined as “Hot Work” as per OSHA/NFPA requires a permit to be issued. In the event of Hot Work, the Contractor will notify the COR with dates and times Hot Work will be performed. The contractor is to give at least 48-hour notification. This includes welding, cutting, brazing, grinding or any work that could produce sparks or heat and may initiate a fire.

9. ENVIRONMENTAL COMPLIANCE: Any waste generated because of the project shall either be recycled or be disposed of IAW the Resource Conservation and Recovery Act (RCRA). Any Hazardous Waste shall be manifested off site with Base New Orleans listed as the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored and disposed of IAW RCRA and all applicable federal, state (i.e. DOT) and local laws and ordinances. All solid waste/trash shall be removed from site and not disposed of in onsite dumpsters. Waste and recycling areas are reserved for RCF Tenants and shall not be used by Contractors at any time. All work will be performed IAW the BASE New Orleans Spill Prevention Control and Countermeasures Plan. All chemicals required for this project shall be preapproved by the contract POC along with SDS’s. All solid waste shall be removed from the RCF after each working day. All extra chemicals and products shall be removed from the site upon work completion, as the Emergency Planning and Community Right-To-Know Act requires Coast Guard maintains an inventory of all Hazardous Materials located at the site. A laydown area as required and an Erosion and Sediment Control Plan, shall be preapproved by the COR as needed. Nothing shall be discharged to a storm drain at any time during the project. All storm drains within range of a potential discharge shall be covered/sealed during installation and kept covered until the work has been completed and the system has been deemed fully operational and compliant with all applicable CG policies/plans/permits/laws/ordinances. All storm drains and waterways within range of a potential discharge shall be covered/sealed or protected by silt fence.

10. SITE VISIT: All site visits should be scheduled with the Contracting Officers Representative. Any personnel coming on site without a TWIC, military or prior approved ID, will need to provide first and last name to representative at a minimum of (2) two business days prior to arrival, so a security badge can be created to allow access on the base. All personnel requiring access to NASA Michoud Assembly Facility must have REAL ID credentials.

· Contracting Officers Representative (COR) CWO Mike Ackiss Cell: (504) 239-4937 Email: carlton.m.ackiss@uscg.mil

11. MATERIALS:

a) The Contractor will furnish all materials, equipment, instruments, tools, safety lines and harnesses, and other items necessary for accomplishment of these services.

b) Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturers’ recommendations in a clean, dry, well-ventilated area. Materials stored onsite shall be protected from sunlight and kept away from excessive heat. The contractor shall not store any highly flammable materials in the work area and all chemicals used shall be preapproved by POC. Laydown areas and parking should be on non-vegetated areas when possible.

c) The Contractor is required to comply with local VOC laws and regulations. All applicable Safety Data Sheets shall be available upon request.

12. LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the Technical Representative.

PART 2: PERFORMANCE STANDARDS

1. PERFORMANCE REQUIREMENTS: Contractor shall provide all materials and personnel to complete the following:

a. Inspect

1. Evaluate existing fencing and all associated components for repair/replacement.

b. Repair

1. Remove, and dispose of off-site, any existing fencing components requiring replacement. Replace with galvanized steel chain link fencing and all necessary components.

2. Repair existing components that are in disrepair that do not require replacement (i.e.-straightening vertical stanchions) to ensure that it is a uniform, seamless, fenced barrier with continuous barbed wire.

3. Service existing gates to ensure proper operation.

2. LABOR LAWS: The Service Contract Act applies to the procurement.

3. SITE RESTORATION & CLEAN UP: The work site shall be cleaned up at the completion of each workday. Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains, off-site. There will be no final acceptance of the contract until the Contracting Officers Representative approves the appearance of the job site.

4. GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base/ Unit regulations. All personnel employed on the project shall keep within the limits of the work area and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Coast Guard Building. All smoking must be done in the designated smoking area.

5. CONTRACT TIMELINE: The Contractor shall provide all required information and complete this contract within this time schedule, unless approved by the Contracting Officer.

a) Provide all required submittals to the Contracting Officer within 14 calendar days after contract award.

b) The U.S. Coast Guard will have 7 calendar days to review the submittals and respond to Contractor.

c) Contractor shall provide a projected delivery schedule during the proposal and provide a firm delivery date within 14 calendar days after the contract has been awarded.

d) The Contractor, upon receiving notification that the U.S. Coast Guard has approved the submittals and having received the Contractors firm delivery date schedule, will have 14 Calendar days to begin work on the project & 30 Calendar days to complete. The Contractor shall notify the Contracting Officer of any long lead time delivery of equipment, so that the Contracting Officer can modify the delivery date of the contract.

6. SUBMITTALS: Once awarded, the following list of submittals required for approval defines the specific minimum requirements for this contract. The submittal shall contain sufficient information that can be used to determine compliance of the material with these specifications and referenced specifications.

i. Detailed plan to include repair/replacement plan, work schedule, and proposed timeline.

ii. List of employees for badging at least 48 hours before access to Base

iii. Warranty information

7. EXECUTION: Installation, workmanship, fabrication, assembly, erection, examination, inspection and testing shall be in accordance with appropriate sections of 29 CFR 1910, 1926.

a) The Contractor shall schedule all work with the Technical Representative. The Contractor shall understand the importance to schedule and complete all work in a timely fashion. The Contractor shall minimize the impact for the command and/or mission of the personnel located at each location.

b) The Contractor shall perform all work IAW all Federal, EPA, OSHA, and State of Louisiana laws and regulations.

8. WARRANTY: Contractor shall provide a 1-year workmanship and provide information for manufacturers warranty image1.png