This Statement of Work details HVAC replacement requirements at the USCG Station Grand Isle in Louisiana. The contractor must remove and replace existing ductwork/insulation, air conditioning system, and fan coil unit in the southwest wing of the UPH building, which has suffered extensive water damage in 4 berthing rooms and utility room.

The scope includes installing 24 GA insulated galvanized sheet metal ductwork, a new fan coil unit with single-stage 4-way multipoise condensing gas furnace/5-ton evaporator, and a new 5-ton 15 SEER2 residential AC condenser unit on a grated platform. Work must be completed within 60 days after award. The solicitation (70Z02925QNEWO0008) is a small business set-aside under NAICS 238220, with quotes due by February 21, 2025 at 5:00pm CST. An optional item includes replacing the utility room door. The contractor must be an American citizen or permanent resident, coordinate with COR MKC Shawn Bissinger, and follow specific security protocols while working on the Coast Guard facility at 453 Admiral Craik Dr, Grand Isle, LA.

View the file

Other files

File Type Posted
Construction Clauses Provisions FAC 2023-01.doc DOC document
SF1442 Grand Isle.pdf PDF
LA20250038.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

STATION GRAND ISLE

SPECIFICATIONS

FOR

UPH Southwest Wing FCU/AC and Ducting Removal and Replacement

General: United States Coast Guard Station Grand Isle is accepting proposals for qualified individuals or firms to remove existing Duct work/insulation, Air conditioning system and Fan Coil unit and replace in kind. Current system has suffered extensive water damage in the 4 berthing rooms and utility room on the southwest wing of the UPH building adjacent to the main station building. Prior to submitting a quote, it is mandatory to examine the scope of work and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Grand Isle.

Location:

United States Coast Guard Station Grand Isle.

453 Admiral Craik Dr, Grand Isle, LA 70358

I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 7:30am to 3:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative.

II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work.

III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities.

MKC Shawn T. Bissinger
Shawn.T.Bissinger@uscg.mil
504-382-1395

IV: Recycling and Disposal of Refuse: All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste, to include old drywall, deteriorated frame wood, screws, etc shall be disposed of in contractor provided dumpsters.

V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.

VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.

VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that their materials are protected. The Coast Guard has no responsibility for receipt, storage, or protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation that may be in and around the work sites. Any damage shall be repaired at the contractor’s expense.

VIII. Contractor Identification: The contractor and subcontractor personnel shall, at all times, wear company identification.

IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during demolition at no additional cost to the Government.

X: Regulations while onboard Coast Guard Station Grand Isle:

1. Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events.

2. The work site shall be maintained in a clean condition at all times. This includes daily clean-ups of the work and storage areas. The site shall be well lit and well barricaded/cordoned off as appropriate.

3. Absolutely no firearms or weapons of any kind are allowed onboard Station Grand Isle.

4. Only American citizens and permanent resident aliens are allowed onboard Station Grand Isle Facilities. Absolutely no foreign nationals are permitted on the premises.

5. Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, and sewage or lighting outages.

6. The contractor shall provide a consolidated list of all contracted personnel including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on Facilities either the day of or prior to the notice to proceed date.

7. Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work.

8. No personnel other than the contracting officer has the authority to alter the terms of any contract or to issue any change orders.

9. All contractor vehicles, equipment and gear onboard Coast Guard properties are subject to search at all times. Additionally at all times due to security and operational needs, the contractors are subject to orders to evacuate the property at any time.

10. Due to the nature of operations & support functions ongoing on-board Station Grand Isle, all efforts within reason to minimize the size and footprint of the contractor’s lay down area shall be taken. The boat ramp, government vehicles, and small boats shall not be obstructed or blocked.

VIII: SCOPE OF WORK: Contractor shall provide all labor, materials, and equipment necessary to complete the following unless noted below:

A. Base Bid

1. Contractor shall completely evacuate, disconnect and remove current Air Conditioning Condenser/evaporator systems, supply ducting/insulation and Fan Coil Unit on southwest wing of the UPH building (indicated on reference drawings).

2. Install 24 GA Insulated galvanized sheet metal for duct work plenum supply ducting.

3. Install new Fan Coil unit with Single-Stage 4-Way Multipoise Condensing Gas furnace/5 Ton Evaporator A Coil Cased Multipoise Painted 24" Width reconnecting outside air supply ducting.

4. Install New 5 Ton up to 15 SEER2 residential Air Conditioner Condenser unit on Grated Platform outside of Utility room.

5. Contractor is responsible for the disposal of all old materials IAW federal and state laws.

6. Contractor Shall Charge new system with refrigerant and test cooling/heating modes in presence of Contracting Officer’s Representative.

7. Required delivery 60 days after award.

8. Contractor shall protect all equipment and merchandise in work locations.

9. All work must be approved by the Contracting Officer’s Representative.

B. Option Item

1. Contractor shall replace door on Utility room with door suitable for space and weather elements.

2. Contractor is responsible for the disposal of all old materials IAW federal and state laws.

3. Required delivery 60 days after award.

image1.jpg