SOW.docx

DOCX document 2 MB Posted

Attached to
USCG Station Venice Back Flow Preventer Replacement
Solicitation number
70Z02925QNEWO0005
Issued by

About this file

This Statement of Work outlines requirements for replacing backflow preventers at US Coast Guard Station Venice in Louisiana. The project involves removing existing 4" and 6" backflow preventers and installing new Watts 909 models (909NLF-4 and 909NLF-6), conducting pressure testing, and completing operational testing with station engineering personnel present.

The solicitation (70Z02925QNEWO0005) is a small business set-aside under NAICS 237110, with quotes due by February 21, 2025 at 5:00pm CST. The contract will be a firm-fixed-price award to the lowest price offeror. Work must be completed within 45 days after receipt of order. Site visits are strongly encouraged and must be coordinated with MK1 Todd Caltagirone. Questions are due by February 18, 2025. The contractor must provide all labor, materials, and equipment, dispose of old units, clean the jobsite, and cannot use Coast Guard dumpsters. Work hours are Monday-Friday 7AM-5PM, with weekend work available upon 24-hour notice.

View the file

Other files

File Type Posted
LA20250052.txt TXT text file
SF1442 Venice.pdf PDF
Construction Clauses Provisions FAC 2023-01.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

CG Station Venice 436 Coast Guard Venice, LA Project Specification For Replace Station Venice 4” & 6” Backflow Preventers November 2024

Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS3
SECTION 01 11 00 - GENERAL PARAGRAPHS3

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 11 00 - GENERAL PARAGRAPHS

PART 1 GENERAL

1.1 PROJECT BRIEF: Coast Guard Station Venice is replacing the 4” & 6” backflow preventers that provide potable water to the facility. The backflow preventers are located just inside the front gate of the facility. We require the removal of the existing 4” Backflow Preventer and 6” Backflow Preventer, replace in kind with a new 4” & 6” backflow preventer. In addition, both will need to have the required annual inspection done on them after installation. After installation both backflow preventers will need to be operationally tested. There are no drawings of the current electrical wiring or fuel piping of the Station available for review. Prior to submitting a quote, it is required to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed.

1.2 Address:

CG Station Venice 436 Coast Guard Rd.

Venice, LA

1.3 The POC:

MK1 Todd Caltagirone Phone: 504-915-6986 Email: Todd.C.Caltagirone@uscg.mil

1.4 Security Requirements

1. Contractor shall provide a list of names to the Coast Guard POC for access to the base.

2. All personnel shall present ID to the security personnel at the entrance to the base.

1.5 SCOPE OF WORK:

BASE BID:

Furnish and install:

1. New 4” Watts 909 (909NLF-4 WATTS - 4" LF909 RPA NRS LEAD FREE) backflow preventer

2. New 6” Watts 909 (909NLF-6 WATTS - 6" LF909 RPA NRS LEAD FREE) backflow preventer

3. Conduct required backflow preventer pressure testing.

4. Dispose of old backflow preventers.

5. Contractor shall provide labor, materials, and equipment for all requested work and for cleaning up all excess materials.

6. Complete operational test of backflow preventers with Station Engineering point of contact. POC must be present during the testing of the backflow preventers.

7. Contractor will remove any excess waste materials left after repairs are completed. The jobsite will be cleaned. The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.

Completion:

1. When the contractor has completed the work, they shall notify the Coast Guard (POC) for a final inspection.

Work hours are Monday-Friday 7 AM to 5 PM.

Weekend work is available if the written request is made 24 hours in advance to the POC.

If a building wide utility outage is needed, the POC shall be given a 12-hour notice prior to securing to make notifications to building personnel.

1.6 IMAGES:

4” Backflow Preventer:

4” Backflow Preventer:

6” Backflow Preventer:

6” Backflow Preventer:

4” & 6” Backflow Preventers:

image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg

File details come from the government source that posted it. Updated .