SOW.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C24822Q1484
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Picture2.jpg | JPG image | |
| Tailored 52.212-1 Instructions to Offerors.docx | DOCX document | |
| Picture1.jpg | JPG image | |
| 15-4537.txt | TXT text file | |
| VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx | DOCX document | |
| 36C24822Q1484.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. GENERAL SCOPE
The purpose of this Statement of Work (SOW) is to set out the requirements necessary for a Contractor to provide materials and services for Gainesville VAMC restrooms that meet high-quality threshold while integrating excellent environmental stewardship.
Materials and services to include 62 restroom areas in phased planning. Service will be performed at Malcom Randall VA Medical Center, 1601 SW Archer Road Gainesville, FL 32608. In carrying out this action, the Contractor shall furnish all labor, materials, equipment, and supervision necessary for, or incidental to, the performance of work set forth herein.
The floors being completed is 5,393 square feet and the walls are 9,101 square feet. When half the rooms (31) have been completed the contractor shall invoice for payment in the arrears for work completed.
Materials and Service for areas:
Colors: (Outback FB-517 & Stonewash FB-708)
| ITEM |
| SERVICE AREA |
| DESCRIPTION |
| 1 |
| 122-12 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 2 |
| 240A-12 |
| · Deep Clean All Floors and Wall Tile |
· Floor: Apply Full Flake
| 3 |
| 270-12 |
| · Deep Clean All Floors and Wall Tile |
· Floor: Apply Full Flake
| 4 |
| 272-12 |
· Deep Clean All Floors and Wall Tile
· Floor: Apply Full Flake
| 5 |
| 305-12 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 6 |
| 323-12 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 7 |
| 340A-12 |
| · Deep Clean All Floors and Wall Tile |
• Full Flake floor
· EnduraGLAZE walls
| 8 |
| 344-12 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 9 |
| 364-12 |
| · Deep Clean All Floors and Wall Tile |
• Full Flake floor
• EnduraGLAZE walls
| 10 |
| 375-12 |
| · Deep Clean All Floors and Wall Tile |
• Full Flake floor
• EnduraGLAZE walls
| 11 |
| H201A-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 12 |
| H201B-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 13 |
| H212-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 14 |
| H219A-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 15 |
| H265-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 16 |
| J243A-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 17 |
| H301A-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 18 |
| H301B-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 19 |
| H312-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 20 |
| H319A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 21 |
| H365-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 22 |
| J343A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 23 |
| H401A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 24 |
| H401B-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 25 |
| H419A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 26 |
| H465-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 27 |
| H412-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 28 |
| J443A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 29 |
| A240-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 30 |
| A250A-1 |
| · Deep Clean All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 31 |
| E200-1 |
| · Deep Clean Floor All Floors and Wall Tile |
· Full Flake floor
· EnduraGLAZE walls
| 32 |
| E201-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 33 |
| E292-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 34 |
| A307A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 35 |
| A320A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 36 |
| A326A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 37 |
| A329A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 38 |
| A339-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 39 |
| A340-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 40 |
| A350A-1` |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 41 |
| A386-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 42 |
| A387-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 43 |
| E357-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 44 |
| E365-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 45 |
| E300-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 46 |
| E301-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 47 |
| A451-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 48 |
| A460B-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 49 |
| A490-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 50 |
| A489-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 51 |
| A458-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 52 |
| E465-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 53 |
| E400-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 54 |
| E401-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 55 |
| A529A-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 56 |
| A532-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 57 |
| A589-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 58 |
| A590-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 59 |
| E571-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 60 |
| E583-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 61 |
| E500-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
| 62 |
| E501-1 |
· Deep Clean All Floors and Wall Tile
· Full Flake floor
· EnduraGLAZE walls
PERFORMANCE REQUIREMENTS
1) The contractor shall provide and be responsible for the technical assistance, development, and generation for final specifications.
2) Phased Sanitizing and application for Malcom Randall VA Medical Center will be required on or before August 15, 2022, to begin projects. Coordination of phasing to be coordinated with Engineering, EMS, and Interior Design. Duty hours will be nights and weekends.
3) Government recognized US holidays are: New Year’s Day, Martin Luther King, Jr. Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day. If the holiday falls on Sunday, it is observed on Monday.
4) The Government maintains the option to modify the normal work week, days, and hours, as necessary for the accomplishment of VHA mission.
5) The Contractor shall always keep the work area free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
6) Contractor shall provide maintenance instruction manuals for all products specified.
7) Color of materiel will be decided on prior to installation by the COR and Interior Designer.
III. PRODUCT REQUIREMENTS
1) All finished surfaces shall be free of scratches, mars, dents, or blemishes, and exhibit no flaking, cracking, or loss or adhesion.
2) Finishes shall be smooth with no hazardous projections, sharp corners, or detail, which can be hazardous and cause personal injury or damage to clothing.
3) Warranty - All product specified needs to offer a 3-year warranty (including shipping, parts and labor for the repair or replacement of defective item). Product is to be free of defects in materials and workmanship.
IV. PERFORMANCE REQUIREMENTS
1) The contractor shall be responsible for taking and applying accurate field measurements to ordered product for verification of correct sizing. Auto-Cad drawings may not be accurate finished dimensions and may not be used in place of field measurements. The Vendor shall be liable for any incorrect field measurements leading to incorrect product order.
2) The product must not be placed into production without clearance from the VA COR.
3) The contractor shall track manufacturing schedule and notify COR with updates of estimated completion date by email.