SOW Deicing Tank Fluid.pdf
PDF 94 KB Posted
- Attached to
- Used Deicing Fluid Tank Pumpout - Scott AFB, IL
- Solicitation number
- W50S7S22Q0025
- Issued by
-
Department of the Army National Guard
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) FOR SUPPLIES
ILLINOIS AIR NATIONAL GUARD (ILANG) UNIT/DIRECTORATE
DATE: 23 August 2022
TITLE: Used Deicing Fluid Tank Pumpout
1. PURPOSE. The 126th uses propylene glycol to deice planes and collects the used deicing fluid in a 20,000 gallon Underground Storage Tank (UST). The UST is almost full and needs 12,000 gallons pumped out and disposed of.
2. SCOPE OF WORK. The contractor shall provide all materials and support necessary to pump out and dispose of 12,000 gallons of used deicing fluid from the 126th’s UST. The contractor shall dispose of the fluid in compliance with federal, state, and local regulations.
3. DELIVERY LOCATION AND DELIVERY DATE. This service shall be completed at the Illinois Air National Guard Apron, behind Building 5026, located at 5780 Pryor Dr, Scott AFB, 62225 not later than October 31 2022.
4. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
5. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
6. Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area.
All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within XX calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS), or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.
File details come from the government source that posted it. Updated .