SOW Deck Repair.docx

DOCX document 23 KB Posted

Attached to
USCGC THETIS FANTAIL AND FUEL TANK REPAIR
Solicitation number
70Z08021-Q-PP45A9800
Issued by

View the file

Other files

File Type Posted
FAR CLAUSE 52.212-5 JAN 2021.docx DOCX document
905-WMEC_141_2.pdf PDF
905-WMEC_131_2.pdf PDF
SFLC-Std-Spec-0740-(2020).pdf PDF
SFLC-Std-Spec-0000-(2020).pdf PDF
REPS CERTS FEB 2021.docx DOCX document
SFLC-Std-Spec-6310-(2020).pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

PR 801P45A98

CGC THETIS Fantail and Fuel Tank Repair

1. BACKGROUND

CGC THETIS currently has a 4”x2” hole on the fantail deck underneath the oxygen cylinder storage rack. This has allowed water to leak into the Hawser Stowage space (2-207-3-A), and had caused wastage on top of fuel tank 4-207-1-F. When underway, fuel leaks through the tank top into the Hawser Stowage space. The deck plating needs to be repaired in both locations.

2. REFERENCE

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Coast Guard Drawing 905-WMEC_141_2_1_-_D, 1ST PLATFM PLTG & FRAM, AFT 182 Coast Guard Drawing 905-WMEC_131_2_1_-_C, MN DK PL & FRAM AFT 182

3. REQUIREMENTS

Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to: Oxygen cylinders, Oxygen cylinder storage rack, insulation, cables.

The Coast Guard will ensure that diesel fuel tank 4-207-1-F is emptied and commercially cleaned prior to commencement of work.

The contractor shall certify the fuel tank and Hawser Stowage space safe for hotwork. Clad weld an area of up to 1 sqft on the tank top, as determined by CG inspector. Preserve Hawser Stowage space deck in accordance with SFLC Std Spec 6310 from starboard bulkhead inward 4 ft for a length of 14 ft (56 sqft).

The contractor shall crop and renew up to 3 sqft of deck plating on the fantail, as designated by Coast Guard inspector.

The Coast Guard will reapply non-skid to the fantail as needed after work is complete.

4.0 ADMINISTRATION.

4.1 CONTRACTOR PERSONNEL

4.1.1 Qualified Personnel.

The Contractor shall provide qualified personnel and subject matter experts to perform all required tasks specified in this SOW.

4.1.2 Employee Conduct.

Contractor employees shall present a professional appearance and their conduct shall not reflect discredit upon the U.S. Government, and any involved Departments or Agencies.

4.1.3 Conflict of Interest.

The Contractor shall not employ any person who is an employee of the U.S. Government if that employment would, or would appear to cause, a conflict of interest. The Contractor shall take appropriate precautions as delineated in the Federal Acquisition Regulation (FAR) to preclude actual or apparent conflicts of interest.

4.2 PERIOD OF PERFORMANCE.

12-23 April 2021

4.3 PLACE OF PERFORMANCE.

CGC THETIS

100 Trumbo Point Rd Key West, FL 33040

POC: LT Moriba George

*THIS STATEMENT OF WORK IS SOLELY FOR MARKET RESEARCH*