About this file

This Statement of Work (SOW) details a cable replacement project for the Runway 07L Medium-Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) at Daytona Beach International Airport. The Federal Aviation Administration (FAA) requires the procurement and delivery of specific power cables, with strict compliance to cable type, spool quantities, and color phasing as specified in a separate breakdown. The delivery is to be made to the FAA's Daytona Beach ATSS/ SFB ATCT ATSS facility located at 1580 Aviation Center Parkway in Daytona Beach, Florida 32114. The project is identified by Job Control Number (JCN) 23008797 and is dated January 2, 2026, with the delivery point of contact being Charles M Lundquist from the FAA.

View the file

Other files

File Type Posted
ItemsList-ProposedPricing.pdf PDF
697DCK-26-Q-00011.pdf PDF
ItemsList-ProposedPricing.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JCN: 23008797

January 2, 2026

STATEMENT OF WORK

Daytona Beach International Airport (DAB) – RW 07L MALSR -Steady Burn Cable Replacement

JCN 23008797

Provide and deliver power cable required for installation of the RW 07L MALSR at Daytona Beach International Airport. Cable type, spool quantities and color phasing shall be in strict compliance with breakdown provided.

Delivery Address:

Federal Aviation Administration

Daytona Beach ATSS/ SFB ATCT ATSS

1580 Aviation center pkwy

Daytona beach, FL 32114

DELIVERY POC:

Charles M Lundquist AAAE/EC

Federal Aviation Administration

Daytona Beach ATSS/ SFB ATCT ATSS

1580 Aviation center pkwy

Daytona beach, FL 32114 https://corporateworkplan.faa.gov:7011/CWPPortal/faces/projects?searchString=23008797 https://corporateworkplan.faa.gov:7011/CWPPortal/faces/projects?searchString=23008797

File details come from the government source that posted it. Updated .