Scope of Work

Date: 29 June 2022

Project Scope:

This is a gravel materials request to supply and deliver 3500 tons of SB2 gravel to the address listed below (Materials Specifications) in Wilhite, LA 71234. This will partially resurface approximately 2 miles of levee top.

The vendor should be able to supply and deliver materials to the project site, and materials spread by tailgate spreading at a thickness of 4-6” based on site representatives request at any specific section of road surface.

The materials delivered will be in support of USFWS work order #F2019330531 for RPI #10017675 which is scheduled for rehabilitation (resurfacing) under a deferred maintenance program.

Materials Specifications:

● 3500 tons of SB2 gravel with up to 1” coarse aggregate

Performance Specifications:

● Delivery To: Beanfield Levee off of Tower Road, Wilhite LA 71234

● Delivery may be done in smaller tandem axle or Tri-axle trucks

● Contractor should be able to supply approximately 200 tons or more a day

Delivery Location (Map)

Parish Road 5546 (Tower Road), Intersection of Tower Road and Wes Wilhite Rd is the start of the surfacing area.

GPS Coord: 32.61983711432544, 92.24482255984152

2.4 Miles East of Wilhite, LA

From Highway 552 Turn East on Wes Wilhite Road. After 2 miles there is a hairpin curve with refuge signage and a kiosk. The road to the right (North) is the project road. Surfacing continues down past the tower onto the levee top

ROADWAY SURFACING MATERIAL REQUEST

Station : North Louisiana Refuge Complex ( D’Arbonne NWR) Date: 29 June 2022 Contact: Adam Rogers (318-737-6207) or Erin Cox (318-341-9313)

Material Description: SB2 Gravel

Specification Section/Paragraph/No. (Reference applicable State Department Standard And Specification, if known): Not applicable to project

Total Tons/Yards Required: 3500 tons

Delivery Type (Stock Piled (spot dumped) or Tail Gate Spread /Thickness):

Tailgate Spread at approx. 4-6” primarily, some may be stockpiled

Maximum/Minimum Amount to be delivered daily: Full delivery of materials may be made in a single day. Minimum delivery should be twenty loaded (16 ton) trucks.

Delivery and/or local site map Attached Below

State certified scales in the area: No scales are present

Required commencement date for delivery: Will Call

Last date for delivery: 72 Hours after Will Call

Local conditions that may affect delivery: Delivery route from vendor may include Rocky Branch Rd which is a seasonal flooded road and may alter delivery times and routes.

Scope of Work
Project Scope:
Materials Specifications:
Delivery Location (Map)
2.4 Miles East of Wilhite, LA
From Highway 552 Turn East on Wes Wilhite Road. After 2 miles there is a hairpin curve with refuge signage and a kiosk. The road to the right (North) is the project road. Surfacing continues down past the tower onto the levee top