SOW Cummunications System Upgrade QA006.docx

DOCX document 17 KB Posted

Attached to
Motorola Communication System Upgrade RFQ- Amendment 0001
Solicitation number
W911S626QA006
Issued by

About this file

This is a Statement of Work for the upgrade of the Security Guard Branch Communications System at U.S. Army Dugway Proving Ground in Dugway, Utah. The project requires a contractor to provide all labor, materials, equipment, installation, programming, and testing to implement a modernized Motorola-based communication system. The required equipment includes 40 portable radios for daily patrol use, 10 multi-unit charging stations capable of charging six radios or batteries simultaneously, 19 mobile radios for vehicle installation, and 4 base stations for static posts including a dispatch headquarters station. All work must comply with Department of the Army, Dugway Proving Ground, and Motorola technical standards.

The scope of work encompasses procurement and delivery of Motorola communications equipment and accessories, installation in designated facilities and vehicles, system programming according to mission-specific frequency, channel, and encryption requirements, on-site testing and validation, removal of obsolete communication hardware, basic user training, and provision of manufacturer warranties and technical documentation. The final delivery location is Building 4515 at the West Desert Test Center. Key personnel from Dugway Proving Ground include Perry Sosa, John C. Pierce, Michael R. Smith Jr., Milford Tiafala, Caldarold Wells, and Brian Dobney. The related solicitation number is W911S626QA006, issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

U.S. ARMY DUGWAY PROVING GROUND

WEST DESERT TEST CENTER

DUGWAY, UTAH 84022-5000

1. Subject: Upgrade of the Security Guard Branch Communications System

2. Final Delivery Location: West Desert Test Center, U.S. Army Dugway Proving Ground, Utah. Bldg. 4515

3. Key Personnel from Dugway Proving Ground: Perry Sosa, John C. Pierce, Michael R. Smith Jr., Milford Tiafala, Caldarold Wells, Brian Dobney

Scope Of Work Required:

The purpose of this project is to upgrade the outdated communications infrastructure currently in use by the Security Guard Branch. The selected contractor shall provide all labor, materials, equipment, installation, programming, and testing necessary to implement a fully functional and modernized Motorola-based communication system. We will require 40 portable radios for our patrols to carry on their person daily. To charge 40 radios we will require 10 multi-unit charging stations that can charge 6 radios or batteries simultaneously. We require 19 mobile radios to mount in our vehicles. We require 4 base stations to install in certain static posts, including our headquarters base station that our dispatch operates out of.

The scope includes, but is not limited to:

- Procurement and delivery of required Motorola communications equipment and accessories

- Installation of communications equipment in designated facilities and vehicles

- System programming in accordance with mission-specific frequency, channel, and encryption requirements

- On-site testing and validation of system functionality

- Removal of obsolete communication hardware, if applicable

- Basic user training on new systems

- Provision of manufacturer warranties and technical documentation

All work must comply with current DPG, Department of War, and Motorola technical standards.

File details come from the government source that posted it. Updated .