This document is a Statement of Work (SOW) for the purchase and delivery of 21 steel or spiral culverts of varying diameters and lengths for the rehabilitation of approximately 4.5 miles of the Ethel Access Roads in Arkansas County, Arkansas.

The SOW specifies the required culvert quantities, sizes, and delivery location at the Arkansas County maintenance yard. The period of performance is from July 8, 2024 to September 30, 2024. The preferred award method is lowest bidder - technically acceptable. This procurement supports the Arkansas County road rehabilitation efforts and is associated with a federal contract opportunity from the U.S. Fish and Wildlife Service for the purchase of CULVERT PIPE BULK in Dewitt, Arkansas.

View the file

Other files for this federal contract opportunity

Other files attached to GA DIV OF ENGINEERING CULVERT PIPE BULK, newest first.
File Type Posted
Sol_140FS324Q0180_Amd_0001.pdf PDF
Sol_140FS324Q0180.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work/Period of Performance

RT# 011 S. CC Camp Rehabilitation Gravel Delivery

This statement of work is for the purchase of materials to aid in the rehabilitation of the Ethel Access Roads (Bisswanger, Butler, Jones Lake, and Refuge Roads) in Arkansas County, Arkansas. Roadway Rehabilitation will be +/- 4.5 miles and will include the replacement of 21 culverts. Culverts are to be delivered to the Arkansas County, maintenance yard. The preferred procedure for bid is lowest bidder – technically acceptable.

To support the efforts of Arkansas County, this is a request for the procurement and delivery of 21 steel black culverts or spiral with bitumen coating of varying diameter and lengths with a minimum 3/8” thickness. Delivery will be made to the Arkansas County Maintenance yard at 1421 Tip Lane, DeWitt, AR 72042. The following culverts are being requested for purchase –

Stockpile Coordinates: 34.291687, -91.3521746

Point of Contact:

David McCaghren – (256) 642-5417

Judge Best – (870) 344-3469

Delivery Location:

1421 Tip Lane, DeWitt, AR 72042

Period of Performance:

7/8/2024 – 9/30/2024

Quantity Butler Rd Quantity Bisswanger Rd Quantity Jones Lake Rd Quantity Refuge Rd 1 12" x 25' 3 30" x 30' 1 20" x 24' 2 20" x 30' 1 20" x 25' 1 36" x 30' 1 20" x 27' 1 24" x 30' 1 20" x 31' 1 24" x 30' 1 20" x 30' 1 30" x 30' 1 12" x 27' 1 24" x 24' 1 24" x 30' 1 20" x 30' 1 30" x 30' 1 20" x 31'