This document is a Statement of Work (SOW) for the full enclosure of Coast Guard boat #45619 to facilitate repair work on the underwater hull. The SOW outlines the scope of work, which involves providing and constructing an environmental containment structure and covering to prevent rain and dust from contacting the boat hull during blasting and repainting operations. The containment structure will be approximately 57' x 24' and include a second layer over the back 1/3 of the hull for additional protection. Special C-clips will be used to facilitate the sealing of the shrink wrap to the hull contour. The vendor is required to deliver all consumables to the job site prior to the construction of the containment scaffolding, which may take up to 90 days from the contract award. The SOW also includes instructions for the vendor's quote, such as providing their Unique Entity Identifier (UEI) number, any credit card service charges, and payment preferences.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FULL ENCLOSURE OF RBM-45619 FOR CONTAINMENT OF BLAST GRIT AND SPRAY PAINT.

1. Work Site: The boat is located at 400 Sand Island Parkway on the Coast Guard Base. The vendor must get through base security to get to the work site. (Fig. 5)

2. SCOPE OF WORK: Provide and construct and environmental containment structure and covering to facilitate repair work on the underwater hull of Coast Guard boat #45619. The boat is 45 feet long and 11 feet 3 inches tall at the forward peak. The goal of the environmental containment is to prevent rain and dust from contacting the boat hull while we are blasting and repainting the boat. The vendor will disassemble and remove the containment when the project is complete.

3. From the edge of the main deck down. Exterior walls, roof, and floor will be 100% sealed to the hull with shrink wrap. Scaffold structure will be approximately 57’ x 24’ (+/-) in length and width. A second layer will be added over the back 1/3 of hull and containment for protection from elements.

4. Cradle will be the fixed point that scaffolding will be measured from for set up. See attached layout map. (Fig 1)

5. Special C-Clips will be provided to facilitate anchor points for line, to follow the profile of the hull with shrink wrap. See attached hull contour photo. (Fig 2)(Fig 6)

6. Shrink wrap must be taped to the hull, both inside and outside of containment to maintain 100% sealing.

7. Uprights of scaffolding will range from 10’ to 12’ to follow the rising contour of the hull. See attached layout map. (Fig 1)

8. Platforms will be installed on the inside of the containment at various heights. See attached layout map for heights and locations. (Fig 1)

9. A rain fly (shrink wrap) will be placed over the back 1/3 of hull and containment to keep out the elements. A metal frame will be provided on the fantail of the RBM-45, vendor to tape shrink wrap to outside of containment. See attached photos for reference. (Fig 2-4)

10. If quoted, include the following in quote or email:

a. Your companies UEI (Unique Entity Identifier) number. This can be found at SAM.gov and replaces the DUNs #

b. What cost (service charge) if any, would you add if paid by credit card.

c. Do you have a preference for how you are paid (ACH or credit card)? Provide information if ACH.

11. If awarded contract, all consumables for this job, shrink wrap, tape, flooring, etc. must be delivered to the job site prior to building of containment scaffolding. It may take up to 90 days from contract awarding to building of containment.

Layout Map Figure #1

Hull contour photo Figure #2 Figure #3 Rain fly back Figure #4 Rain fly back and side.

Figure #5 Location building #35, USCG Base Honolulu, 400 Sand Island Parkway.

Figure #6 C-Clips provided to follow hull contour and assist with containment sealing.