SOW COL Koehler Plaque Removal-Relocation _PR .pdf

PDF 152 KB Posted

Attached to
Relocate Koehler Plaque Federal contract opportunity
Solicitation number
W911SD20R0050
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

View the file

Other files for this federal contract opportunity

Other files attached to Relocate Koehler Plaque, newest first.
File Type Posted
Plaque Idea.docx DOCX document
Performance COL Koehler Plaque Removal-Relocation MICC Construction QASP_PR .pdf PDF
COL Koehler Project Design Concept_13FEB2018.pptx PPTX presentation
After work started.jpg JPG image
Plaques befor construction.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Statement of Work Page 1 of 11

STATEMENT OF WORK (SOW)

COL Koehler Plaque Removal/Relocation PR #

1. GENERAL: The following is a statement of work for the removal/relocation of the current COL Herman Koehler plaque located on the first floor of the Arvin CPDC to the second floor (refer to slides 5-7 of Encl 1). The Contractor shall be accountable to the Government for Contractor or subcontractor personnel.

1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to conduct the COL Koehler Plaque Removal/Relocation PR number 11179303 as defined in this Performance Work Statement (PWS), except for those items specified as government furnished property and services. The Contractor shall perform in accordance with (IAW) the terms and conditions of the contract and consistently with the established standards in this SOW and contract.

1.2. Background: There is currently a 4’ 6” x 27” bronze plaque of COL Herman Koehler “The Father of the Department of Physical Education” located on the first floor of the Arvin CPDC which needs to be relocated due to limited visibility to the public and visitors of the facility.

1.3. Objectives: The basic performance objective includes the following:

1.3.1. Remove and relocate the COL Koehler plaque listed in 1.4.1, below.

1.3.2. Provide all labor, materials, equipment and supervision to install items listed in 1.4.2, below.

1.4. Scope: The contractor will perform the following specific tasks:

1.4.1. Demolition and removal: Request the COL Koehler plaque be removed from the 1st floor of Arvin CPDC and relocated to the 2nd floor, IAW the specifications indicated on slides 5-7 of the attached PowerPoint (Encl 1).

Request the contractor be responsible for proper testing of any materials required to be disturbed that are suspected to contain hazardous materials.

Contractor will be responsible for proper removal and disposal of these materials IAW all applicable laws and regulations. It will be the responsibility of the contractor to clean the work site on a daily basis. Below are additional specifications of the project.

1. Remove and relocate a bronze plate with dimensions (4’, 6” x 27”) and approximate weight of 10lbs.

Attachment 1 – Statement of Work Page 2 of 11

2. Removal of existing grout off the bricks around the current plaque location on the first floor, provide material preparation, and reinstall of the plaque on the 2nd floor of Arvin CPDC (refer to slides 5-7 of attached PowerPoint).

3. Once the current plaque is removed, backfill the opening of the current plaque position with stucco or a similar material IOT maintain a natural appearance of the current construction.

4. The installation of the new plaque will require cutting a small opening in the wall of the second floor to install the plaque and reinforce the existing brick around the plaque surface.

1.4.2. Installation: provide all labor, materials, equipment, and supervision to install the plaque.

1.4.3. All work to follow appropriate federal and states building codes, laws and regulations; including but not limited to, the UFC, NEC, NFPA 101 and OSHA regulations.

1.5. Period of Performance: The period of performance shall be for no more than 10 days.

1.6. General Information

1.6.1. Quality Control: Quality Control is the responsibility of the Contractor.

The Contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements).

1.6.1.1. Quality Control Program: The Government is committed to a highly interactive relationship between quality control by the Contractor and quality assurance by the government recipient of services. This relationship shall be achieved through an effective Prevention Based Quality Control Program dedicated to ensuring the best possible products and services to end users. The Contractor shall provide their final written Quality Control Plan (QCP) no later than (NLT) 5 days after contract proposal and within five (5) days of any proposed changed to the COR and KO.

1.6.1.1.1. The Contractor’s quality program shall demonstrate its prevention-based outlook by meeting the objectives stated in the PWS throughout all areas of performance. The QCP shall be developed to specify the Contractor’s responsibility for management and quality control actions to meet the terms of the contract. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances;

procedures for root cause analysis to identify the root cause and root cause

Attachment 1 – Statement of Work Page 3 of 11 corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints.

1.6.1.1.2. Upon request from the COR, the Contractor shall provide, all reports generated as a result of the Contractor’s quality control efforts. This shall include any summary information used to track quality control, including any charts/graphs.

1.6.1.1.3. Proposed changes made after COR acceptance shall be submitted in writing through the COR to the KO for review and acceptance prior to implementing any revision. The Contractor’s QCP shall be maintained throughout the life of the contract and shall include the Contractor’s procedures to routinely evaluate the effectiveness of the plan to ensure the Contractor is meeting the performance standards and requirements of the contract.

1.6.1.2. Contractor Discrepancy Report (CDR): When the Contractor's performance is unsatisfactory, a CDR will be issued. The Contractor shall reply in writing within five (5) work days from the date of receipt of the CDR, giving the reasons for the unsatisfactory performance, corrective action taken, and procedures to preclude recurrence.

1.6.3. Property Management System: The Contractor shall establish a system to manage Government Furnished Material (GFM) in its possession to control, use, preserve, protect, repair and maintain. The Property Management System (PMS) must be adequate to satisfy the requirements of Property Management in accordance with (IAW) FAR clause 52.245-1 Government Property.

1.6.4. Recognized Federal Holidays: The Contractor shall not be required to perform services on recognized federal holidays. The recognized federal holidays include:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day Washington’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.4.1. When a holiday occurs on a Saturday, Federal employees are normally granted the previous Friday as the holiday observance. When a holiday occurs on a Sunday, Federal employees are normally granted the following Monday as the holiday. The contractor shall work on the days the Government is scheduled to work.

1.6.4.2. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor will have the following options:

Attachment 1 – Statement of Work Page 4 of 11

1.6.4.2.1. Reschedule the work so it is performed the following day unless the following day falls on a weekend.

1.6.4.2.2. Reschedule the work on any day that is mutually satisfactory.

1.6.5. Hours of Operation: The Contractor shall be responsible for providing services, between the hours of 0730 am to 4:30 pm, Monday through Friday, except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings or similar government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential to successful performance under this contract. No overtime (OT) or compensatory time (CT) is authorized. Contractor personnel shall not exceed a 40 hour work week; flexible work schedule may be considered.

1.6.6. Place of Performance: Contractor shall have routine access to Government-controlled facilities. The work to be performed under this contract shall be accomplished at Thayer Hall on the West Point Military Installation.

1.6.7. Security Requirements: Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites. All personnel must meet requirements IAW DODD 8570.

1.6.8. Special Qualifications.

1.6.8.1. General:

1.6.8.1.1. The Contractor shall be responsible for ensuring all personnel performing work under this contract possess and maintain current certifications as indicated in PWS 1.6.6.; security requirements during the execution of this contract.

Attachment 1 – Statement of Work Page 5 of 11

1.6.8.1.2. Contractor personnel performing work under this contract shall be able to read, write, speak, and understand the English language to effectively carry out all contract requirements. They shall have a command of both the written and spoken English language to properly clearly, and effectively communicate in person or via electronic devices (telephone or Email) with co-workers, customers, and the general public.

1.6.8.1.3. Contractor personnel performing work under this contract shall be U.S.

citizens unless the provisions of Army Regulation 25-2, Information Assurance have been fully completed and approval has been granted by the Government for the non-U.S. citizen to perform the required support.

1.6.8.1.4. Access and General Protection/Security Policy and Procedures: All Contractor personnel performing work under this contract shall comply with applicable installation, facility and area commander installation/facility access, local security policies and security procedures provided by the Security Manager Government representative. Contractor personnel shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor personnel shall comply with all personal identity verification requirements as directed by Department of Defense (DoD), HQ Department of Army (DA) or local policies.

1.6.9. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office. This meeting shall be at no additional cost to the Government.

1.6.10. Contracting Officer Representative (COR): The COR will be identified by separate letter of appointment. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assures that the Contractor performs the technical requirements of the contract; performs inspections necessary in connection with contract performance; maintains written and oral communications with the Contractor concerning technical aspects of the contract;

issues written interpretations of technical requirements, including government drawings, designs, specifications; monitors Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinates availability of government furnished property, and provides site entry of Contractor personnel.

A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

Attachment 1 – Statement of Work Page 6 of 11

1.6.11. Key Personnel: Key personnel shall not be added to or removed from the contract without express acknowledgement of the COR. Any changes to the working status of these key personnel shall be transmitted (in writing) to the KO/COR within ten (10) work days of the proposed change. If, for any reason, any of the key personnel becomes, or is expected to become, unavailable for work under this contract for a continuous period exceeding 30 work days the contractor shall promptly replace personnel with personnel who possess qualifications equal to or better than that of the original employee. The Contractor shall ensure all key personnel terminated or released from employment under this contract are replaced within ten (10) work days of the termination.

1.6.11.1. The follow are considered key personnel by the Government: The Contractor shall provide a Program Manager (PM) who shall be responsible for the performance of the work under this contract. The name of this person, and an Alternate PM (APM), who shall act for the Contractor when the PM is absent, shall be designated in writing to the KO at the post award conference. The PM or APM shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The PM or APM shall be available between the hours of 7:30 AM to 4:30 PM, Monday through Friday, except federal holidays or when the government facility is closed for administrative reasons.

1.6.11.2. Qualifications for all Key Personnel:

1.6.11.2.1. Program Manager (PM): The PM shall meet or exceed the following minimum qualifications: 5 years of experience managing general construction projects of similar complexity to this project. These five years of management shall include references for past projects that included demolition, proper handling of hazardous materials, carpentry, sheet rock installation, plaster installation and repair, commercial electrical work, and the installation of sheet vinyl flooring. The management shall reference projects that involved successful utilization of subcontractors. The APM shall meet or exceed the same qualifications as the PM.

1.6.12. Contractor Personnel

1.6.12.1. Identification of Contractor Personnel: All Contractor personnel attending meetings, answering government telephones, and working in other situations where their Contractor status is not obvious to third parties, are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials.

1.6.12.2. Contractor Personnel Appearance and Performance: It is essential that all Contractor personnel meet the highest standards of professionalism and personal integrity. The Contractor shall ensure their personnel do not perform

Attachment 1 – Statement of Work Page 7 of 11 work under the influence of alcohol, illegal prescribed drugs or any other incapacitating agents.

1.6.13. Organizational Conflict of Interest:

1.6.13.1. Purpose. To aid in ensuring that:

1.6.15.1.1. The Contractor does not obtain an unfair competitive advantage by establishing the ground rules for a future competition;

1.6.13.1.2. The Contractor's objectivity and judgment are not biased because of its present or future interests (financial, contractual, organizational, or otherwise) which relate to work performed under this contract; and

1.6.13.1.3. The Contractor does not obtain an unfair competitive advantage by virtue of its access to non-public or proprietary information belonging to others.

1.6.13.2. Definitions.

1.6.13.2.1. The term “Contractor” herein used in section 1.6.16., Organizational Conflict of Interest, means: (a) the organization (hereinafter referred to as "it" or "its") entering into this agreement with the Government; (b) all business organizations with which it may merge, join or affiliate now or in the future and in any manner whatsoever, or which hold or may obtain, by purchase or otherwise, direct or indirect control of it; (c) it’s parent organization, if any and any of its present or future subsidiaries, associates, affiliates, or holding companies, and;

(d) any organization or enterprise over which it has direct or indirect control now or in the future.

1.6.13.2.2. The term "proprietary information" for purposes of section 1.6.16., Organizational Conflict of Interest, means any information considered so valuable by its owners that it is held secret by them and their licensees. Information furnished voluntarily by the owner without limitations on its use, or which is available without restrictions from other sources, is not considered proprietary.

1.6.13.3. Organizational Conflicts of Interest Examples. The following examples illustrate situations in which organizational conflicts of interest may arise. These examples are not all inclusive.

1.6.13.3.1. Biased Ground Rules. This type of conflict may arise in situations where a company sets the ground rules for a future competition. For example, when a Contractor develops requirements then competes to provide products or services to satisfy those requirements, thus obtaining a competitive advantage.

1.6.13.3.2. Impaired Objectivity. This type of conflict may exist where a Contractor’s obligations under a contract require objectivity, but another role of

Attachment 1 – Statement of Work Page 8 of 11 the Contractor casts doubt on its ability to be truly objective. An example of this type of conflict is where a Contractor’s work under one contract entails evaluating itself, its affiliates, or its competitors under a separate contract.

1.6.13.3.3. Unequal Access to Information. This type of conflict may arise when a Contractor has access to nonpublic or proprietary information as part of its performance under a contract that gives it an unfair advantage in a competition for a later contract.

1.6.13.4. General Constraints. The provisions of FAR Subpart 9.5, Organizational and Consultant Conflicts of Interest, concerning organizational conflicts of interest govern this contract. Potential conflicts may exist in accordance with FAR 9.505-1, Providing Systems Engineering and Technical Direction, through 9.505-4, Obtaining Access to Proprietary Information. In this regard, the Contractor is responsible for identifying any actual or potential organizational conflicts of interest to the KO that arise as the result of performance under this contract. To avoid or mitigate a potential conflict related to performance under this contract, the KO will impose appropriate constraints such as the constraints discussed below. Since it is impossible to foresee all of the circumstances that might give rise to organizational conflicts of interest, the constraints discussed below are not all inclusive and the KO may impose constraints other than, or in addition to, the constraints listed below.

1.6.13.4.1. The Contractor agrees that if it provides, under a contract or task order or delivery order, systems engineering and technical guidance for systems and programs, but does not have overall contractual responsibility, it will not be allowed to be awarded a contract or task or delivery order to supply the system or any of its major components or be a subcontractor or consultant to a supplier of the system or any of its major components (FAR 9.505-1).

1.6.13.4.2. The Contractor agrees that if it prepares complete specifications for non-developmental items or assists in the preparation of work statements for a system or services under a contract or task order or delivery order, it will not be allowed to furnish these items, either as a prime Contractor, a subcontractor or as a consultant (FAR 9.505-2).

1.6.13.4.3. The Contractor agrees that it will neither evaluate nor advise the Government with regard to its own products or activities. The Contractor will objectively evaluate or advise the Government concerning products or activities of any prospective competitors (FAR 9.505-3).

1.6.13.4.4. The Contractor agrees that if it gains access to proprietary information of other companies, it will exercise diligent effort to protect such proprietary information from unauthorized use or disclosure (FAR 9.505-4). In addition, the Contractor agrees to protect the proprietary information of other organizations disclosed to the Contractor during performance of this contract with the same

Attachment 1 – Statement of Work Page 9 of 11 caution that a reasonably prudent Contractor would use to safeguard highly valuable property. The Contractor also agrees that if it gains access to the proprietary information of other companies it will enter into written agreements with the other companies to protect their information from unauthorized use or disclosure for as long as it remains proprietary and to refrain from using the information for any purpose other than that for which it was furnished. The Contractor shall provide copies of such agreements to the KO.

1.6.13.4.5. If the Contractor, in the performance of this contract, obtains access to plans, policies, reports, studies, financial plans, data or other information of any nature which has not been released or otherwise made available to the public, the Contractor agrees that without prior written approval of the KO, it shall not: (a) use such information for any private purpose unless the information has been released or otherwise made available to the public, or (b) release such information unless release is otherwise authorized under the contract or such information has previously been released or otherwise made available to the public by the Government.

1.6.13.6. Training. The Contractor shall effectively educate its employees, through formal training, company policy, information directives and procedures, in an awareness of the legal provisions of FAR Subpart 9.5 and its underlying policy and principles, so that each employee will know and understand the provisions of that Subpart and the absolute necessity of safeguarding information from anyone other than the Contractor's employees who have a need to know, and the U.S. Government.

1.6.13.7. Subcontracts. The Contractor agrees that it will include the provisions in paragraphs 1.6.13.4., 1.6.13.5., and 1.6.13.6., above and this paragraph in consulting agreements, teaming agreements, and subcontracts of all tiers, which involve access to information or the performance of services described in paragraph 1.6.13.4., above. The use of section 1.6.13., in such agreements, shall be read by substituting the word "consultant" or "subcontractor" for the word "Contractor" whenever the latter appears.

1.6.13.8. Conflicts Involving Future Procurements. The award of this contract, government tasking or acquiescence in the Contractor’s performance of services hereunder shall not constitute or be interpreted as a determination that the Contractor is eligible to participate in future procurements, developmental efforts, implementation efforts, or related activities. Only the KOs for such efforts, applying the rules, principles, and procedures of FAR Subpart 9.5, have the authority to determine whether a conflict exists, in connection with such procurements.

1.6.13.9. Representations and Disclosures.

Attachment 1 – Statement of Work Page 10 of 11

1.6.13.9.1. The Contractor represents that it has disclosed to the KO, prior to award of this contract, all facts relevant to the existence or potential existence of organizational conflict of interest as that term is used in FAR Subpart 9.5.

1.6.13.9.2. The Contractor represents that if it discovers an organizational conflict of interest or potential conflict of interest after award of this contract, a prompt and full disclosure shall be made in writing to the KO. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order to avoid or mitigate such conflict.

PART 2

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

2. GOVERNMENT FURNISHED ITEMS AND SERVICES:

2.1. Services: none.

2.2. Facilities: none.

2.3. Utilities: The Government will provide all utilities in the facility to the Contractor for their use in performing tasks outlined in this PWS. The Contractor shall instruct all employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

2.4. Equipment: none.

2.5. Materials: none.

PART 3

CONTRACTOR FURNISHED ITEMS

3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

3.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 2 of this SOW.

3.2. Materials: The Contractor shall provide materials, supplies, and equipment necessary to meet the requirements under this SOW.

3.3. Equipment: The Contractor shall provide all equipment and containers necessary to meet the requirements under this SOW.

Attachment 1 – Statement of Work Page 11 of 11

PART 4

SPECIFIC TASKS

4. Specific Tasks:

4.1. The Contractor shall provide all labor, equipment, personnel and supervision to uninstall and reinstall the Koehler Plaque in Arvin CPDC, at the United States Military Academy, 727 Brewerton Road, West Point NY 10996.

PART 5

APPLICABLE PUBLICATIONS

5. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):

NOT APPLICABLE

File details come from the government source that posted it. Updated .