SOW_CJAG_M320_Overhead_Cover.docx

DOCX document 33 KB Posted

Attached to
Bill of Materials: Building/ Lumber Material for Ohio National Guard CJAG
Solicitation number
W9136426QA015
Issued by

About this file

This is a Statement of Work for the purchase and delivery of materials to support the 1194 Engineer Company M320 Overhead Cover Construction Project at Camp James A. Garfield in Ravenna, Ohio. The contractor must procure and deliver all items listed in Appendix 1 to exact specifications or part numbers, with any requested material substitutions requiring approval from the requiring activity prior to contract award. Delivery of all construction materials except concrete is scheduled between 07-10 April 2026 to 1SG Persing, Brian at 8451 State Route 5, Ravenna, OH 44266. Contractors are advised to contact the Point of Contact or Contracting Officer Representative beforehand to ensure seamless delivery operations.

The bill of materials includes structural lumber (pressure-treated posts, beams, and dimensional lumber), prefabricated trusses, roofing materials (metal roof panels, ridge covers, eave closures), fasteners (bolts, screws, nails, staples, rivets), metal trim and clips, sealants, concrete mix, gravel, seed, erosion control materials (fencing, filter socks, straw), and tarps. Quality control inspections are scheduled between 02-04 May 2026, with any discrepancies requiring vendor correction by 20 May 2026. Construction is planned to begin on or around 01 June 2026. Questions regarding the project should be directed to Trevor J. Ducey at 614-336-4548 or trevor.j.ducey.mil@army.mil.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

M320 Overhead Cover Bill of Materials

1. Project Scope: Purchase and deliver all material listed in Appendix 1 of this document to support 1194 Engineer Company (EN CO) M320 Overhead Cover Construction Project at Camp James A. Garfield.

2. Product Description: See Appendix 1.

3. All material listed in Appendix 1 is to be purchased to exact specification(s) and/or part number(s). Any requested material substitution(s) are to be approved by the requiring activity prior to contract award.

4. All construction material minus the concrete shall be delivered between 07-10APR26 to 1194 Engineer Company (EN CO), ATTN: 1SG Persing, Brian (cell phone: 330-984-8130), 8451 State Route 5, Ravenna, OH 44266a. Contractor 5.2.2 Delivery of Material deliveries are recommended to make contact between the POC or COR beforehand to ensure seamless operation.

5. Soldiers will inventory and do quality control inspections of construction material between 02-04MAY26 to ensure material is not damaged or identify potential issues to mitigate construction progress. In event of discrepancies found during quality control inspection, unit representative will notify the COR and KO. COR or KO will report of any material deficiencies with vendor responsible for making and delivering corrections NLT 20MAY26. Construction is planned to start on or around 01JUN26.

6. Any questions for the entire project can be directed to the undersigned at 614-336-4548 or trevor.j.ducey.mil@army.mil.

Item
Unit of Measure
Quantity
Price
6"x 6" POST, 14' LENGTH, PRESSURE TREATED
EA
10
6"X6" POST, 12' LENGTH, PRESSURE TREATED
EA
7
PREFAB TRUSS, 4/12 PITCH, 20' SPAN, 24" OVERHANG
EA
14
FELT PAPER, 30# (1,500 SQ FT OF COVERAGE)
ROLL
1
OSB PLYWOOD, 7/16", 4'X8'
EA
38
2"X10"X16' PRESSURE TREATED LUMBER
EA
4
2"X10"X12' PRESSURE TREATED LUMBER
EA
12
1"X4"X12' PRESSURE TREATED LUMBER
EA
12
2”x6”x18’ (or longer) LUMBER
EA
8
2"X6"X16' LUMBER
EA
44
2"X4"X12' LUMBER
EA
2
2"X4"X16' LUMBER
EA
10
5/8" X 8" GALVANIZED CARRIAGE BOLT
50/BOX
2
5/8" WASHER, GALVANIZED
50/BOX
2
5/8" NUT, GALVANIZED
100/BOX
1
1/2" X 6" GALVANIZED LAG SCREW
35/BOX
1
3 1/4" X .148 ROUND HEAD FRAMING NAIL, 21 DEGREE STICK
25/LB BOX
1
2" X .113 ROUND HEAD NAIL, 21 DEGREE STICK (DEWALT)
25/LB BOX
1
12D COMMON OR SINKER NAILS (LOOSE) (10LB BOX)
10/LB BOX
2
6" HURRICANE TRUSS CLIPS, 100 PK
PKG
1
HURRICANE DOUBLE TRUSS CLIPS (FOR GIRDER TRUSSES)
EA
4
GALVANIZED MENDING PLATE FOR 2" X 6"
EA
8
STAPLES, 3/8" ARROW TYPE TA 50, 5000 CT
BOX
2

26 GAUGE STANDING SEAM METAL ROOF PANEL, 16" WIDE x 30'-0" LONG IMAGE II W/MINOR RIBS (CLASSIC GREEN-PVDF) PANELS (910 lineal feet)

LINEAL FOOT
910
OUTSIDE CLOSURE 1" x 3'-0"
EA
14
10" STEP RIDGE/HIP COVER FOR 4:12 PITCH, 10'-2" LENGTH (CLASSIC GREEN-PVDF)
EA
14
10'-2" (4:12) EAVE WITH OPEN HEM (CLASSIC GREEN-PVDF)
EA
14
#8 - 18 x 3/4" TRUSS HEAD WOOD SCREW (FOR CLEAT TO FASCIA)
250/BOX
1
#8 - 18 x 1" TRUSS HEAD WOOD SCREW (CONCEALED PANEL/TRIM TO WOOD ATTACHMENT)
250/BOX
3
1/8" x 3/16" POP RIVET (3 PER PANEL - FLASHING ATTACHMENT)
250/BOX
1
#9 - 16 x 1" WOOD SCREW WITH RUBBER WASHER (EXPOSED PANEL/TRIM TO WOOD ATTACHMENT)
250/BOX
1
#9 - 16 x 1 1/2" WOOD SCREW WITH RUBBER WASHER (EXPOSED PANEL/TRIM TO WOOD ATTACHMENT)
250/BOX
1
7/8" x 3/16" x 25'-0" DOUBLE BEAD TAPE SEALANT BUTYL-GRAY
ROLL
21
TUBE SEALANT 10.3 OZ
TUBE
7
IMAGE II Z-CLOSURE 10'-2"
EA
19
OFFSET CLEAT 10'-2"
EA
14
CLEAT 10'-2"
EA
14
1/4" x 14 x 7/8" DRILLER STICH SCREW WITH RUBBER WASHER (FLASHING TO FLASHING ATTACHMENT)
250/BOX
3
TOUCH-UP PAINT (CLASSIC GREEN - PVDF)
GALLON
1
PRE-BLENDED CONCRETE, MORTAR, AND CEMENT MIX
BAG/80LB
42
16D DOUBLE HEAD (DUPLEX) NAILS (LOOSE)
10LB/BOX
3
304 Gravel
TON
40
Grass Seed Mix (Annual Rye Grass, Winter Rye, Oats, etc
BAG
1

Concrete Dispostal box (Recommend buying prebuilt). Can be purchased or made out of the following:

1. 3 x 4'x8'x3/4" plywood

2. 1 x 4"x4"x8'

3. 10 x 2"x4"x12'

5-PACK
1
Silt Temporary Fencing Contractor Grade Assembled 3ft x 100ft
EA
2
1" X 2" X 3' Wood stakes
12-PACK BUNDLE
2
Straw (bales, not paper)
EA
5
Compost Filter Sock (used for erosion and sediment control) 12"x 10' - 10 Units - 100 Liner Ft - Green/Black
PALLET
1
Tarp 30' X 50'
EA
1
Tarp 20' X 50'
EA
1

APPENDIX 1

File details come from the government source that posted it. Updated .