SOW_-_Chinle_Land_Transfer_Phase_I_and_II__2.pdf
PDF 160 KB Posted
- Solicitation number
- 140A0922Q0050
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CHINLE_PARCEL_E_0001.pdf | ||
| Sol_140A0922Q0050_Amd_0001.pdf | ||
| REV_CHINLE_PARCEL_A_0001.pdf | ||
| CHINLE_PARCEL_B_0001.pdf | ||
| CHINLE_PARCEL_G-F_0001.pdf | ||
| GoogleMaps.pdf | ||
| fedbizopps_Chinle.pdf | ||
| CHINLE_PARCELS_A.pdf | ||
| BuyIndianRepresentation.pdf | ||
| Copy_of_FormulatedBlank_BidSchedule.xlsx | XLSX spreadsheet | |
| Sol_140A0922Q0050.pdf | ||
| WageRates_Chinle_ESA.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
CHINLE LAND TRANSFER
ASTM PHASE 1 AND PHASE II STUDIES
CHINLE, APACHE COUNTY, ARIZONA
Introduction: The Bureau of Indian Affairs (BIA), Branch of Environmental Management (BEM) is requesting the services of licensed environmental professional to conduct the ASTM Environmental Site Assessment (ESA) Phase I and Phase II on five (5) vacant parcel tracts located in Chinle, Apache County, Arizona (Figure 1). These parcels are located adjacent to the Bureau of Indian Affairs Chinle Agency administration building and next to BIA N7 Highway.
These land parcels are to assess (site reconnaissance) and sampled if required before the land parcels are transferred back to the Navajo Nation. The work requires conducting both the ESA Phase 1 (ASTM E 1527-05 Phase 1 study) and an ESA Phase II (ASTM E1903-11 Phase II).
Both studies shall be prepared concurrently to expedite the proposed property disposal.
It is assumed the vacant lands to be assessed have not been used before, and to assure the condition of the vacant land is safe to return to the Navajo Nation, BIA BEM is requesting each of the parcels identified as:
1) Parcel “A-1-1” = 50.618+ acres (vacant lands surrounding BIA Housing, north, east, and west),
2) Parcel A-1-2 = 11.431+ acres (vacant land formerly part of BIA Housing, located northeast),
3) Parcel B-1-2 = 3.930+ acres (located east of current Chinle Agency Administration building)
4) Parcel E-1 = 14.619+ acres (located on top of mesa, with a former lagoon site next to Chinle Wash)
5) Parcel G-1 = 1.541+ acres (located east of Holiday Inn, which includes acreage adjacent to Holiday Inn across the BIA N7 Highway) be assessed.
The current total number of acres is 82.139+ acres.
The maps showing the parcels are attached in a PDF file.
Background: The Navajo Nation requested the vacant lands be transferred back in FY2021.
Since then, several meetings have taken place with the BIA Navajo Region in identifying the vacant land parcels and acreage for each of the parcels. The BIA Navajo Region, Real Estate Services (RES) with the BEM to retain a contractor that will conduct the ASTM ESA Phase I and II for these land parcels before they are returned to the Navajo Nation. These parcels are the following:
1) Parcel “A-1-1” = 50.618+ acres are vacant land that surround the BIA housing directly north of the BIA N7 Highway. Parcel “A-1-1” has former storage tanks that may no longer be used by the Navajo Tribal Utility Authority (NTUA), housing, business occupying the some of the land areas. No historical information is available on the current use of the land area or the occupants in the area.
2) Parcel A-1-2 = 11.431+ acres are a strip of land that extends along the north and west of the
BIA Housing. This parcel has a dirt road and trees within the land area. No information is available on the land use for this area.
3) Parcel B-1-2 = 3.930+ acres are located east of Chinle Agency Administration building. The land parcel is bordered on north by BIA N7 Highway and N27, a roundabout intersection.
This was an empty land area, however several years ago the Navajo Nation transportation requested from BIA to utilize this fence area to store heavy equipment. A visual assessment of the area was conducted by BIA property and BEM to ensure the land was not environmental impacted. To date, the condition of the land parcel is unknown, or if the parcel is continued to be used for storage of heavy equipment.
4) Parcel E-1 = 14.619+ acres are located west of Chinle Agency Administration building.
Parcel is described as adjacent to the Chinle wash and located south of the BIA N7 Highway, with some residents living nearby. Apparently, BIA had used this area as former wastewater lagoon, no information is available if this lagoon has been properly closed or the current environmental condition of the site.
5) Parcel G-1 = 1.541+ acres are located next to the Holiday Inn on the east side. This parcel is small area that may utilized for parking and does not appear to be developed. No information is available on former land use or the environmental condition of the area.
BEM has included in the Appendix is four (4) maps of the parcels that can be downloaded, as the map was large to include. The maps will be submitted with file name to view.
Work Required: The work shall be conducted concurrently in two phases as ASTM ESA Phase I and II for the five land parcels. Each of the parcels identified in the SOW shall be assessed for any environmental hazards. For this project, only the land parcels shall assess to ensure these lands will be returned to the Navajo Nation with no contamination. The contractor professional knowledge and experience shall guide the outcome of completing the ASTM Phase I and II for this project. The goal is to ensure the vacant lands are safe to returned to the Navajo Nation.
Each of these parcels are located near housing, governmental buildings and private residences, livestock corrals, utilities, commercial businesses, transportation maintenance yard, and former lagoon used by the BIA.
The contractor shall conduct all appropriate inquiries on the previous ownership and uses of the property for recognized environmental conditions, for the presence of hazardous substances or petroleum products or the likely presence of hazardous substance or petroleum products that is released or likely released to the environment or the presence of environmental conditions that may pose a threat to current parcels or future release to the environment. The BIA intends to relinquish and return approximately 81.134+ acres of withdrawn land back to the Navajo Nation within FY2022.
The work identified in this contract will be a performance-based contract. The successful bidder will be evaluated on the completion of identified tasks in accordance with the established standard.
Following the ESA Phase 1, a report shall be prepared in the format a provided by Section 7, Phase 1 ESA of the ASTM E1527-05 and shall also include documentation and recommendations as outlined in Section 13. The document shall be reviewed, stamped, and signed by a Professional Engineer certifying that the Phase I was prepared in accordance with the ASTM E1527-005 format and the All-Appropriate Inquiry Regulations 40 CFR 312.16.
The work will also include conducting an ASTM E 1903-11 Phase II study with sampling and analyses which shall be included as part of testing recommendations for the Phase II ASTM E 1903-11 hazardous constituents discovered on the site during the survey. The contractor shall identify the target analytes if there are asbestos, petroleum hydrocarbons (if identified), and chemical unknowns discovered on the grounds.
Other: Contractors who wish to bid on the project must attend the site visit the site prior to bidding on the project. No compensation will be made to contractors for attendance at the site visit. A Site Plan of these parcels will be given to all potential bidders at the site visit. The successful bidder will be required to conduct both the Phase I and Phase II concurrently as this is an expedited project and must be completed within the period of performance.
The Period of Performance for ASTM ESA Phase 1 and II is August 1, 2022, through November 30, 2022, or 90 days from the receipt of the Notice to Proceed.
OTHER:
1. Contractors must attend the BIA scheduled site visit site prior to bidding on the project. No provisions for payment of site visits are included.
2. There is no power or water available for this project. Contractor must provide their own utilities to conduct both Phase I and Phase II projects, should it be required.
3. The Report shall follow the E1903-11 format outline and include all the above supplemental information.
TASK I Pre-Work Submittals
A. The Contractor shall provide a site-specific Health and Safety Plan (HASP) to address worker protection in accordance with 29 CFR 1910.120 for the overall project. The HASP shall contain certifications/licensures of workers and describe the use of all and appropriate PPE.
Known and potentially occurring environmental hazards are asbestos, PCBs, lead-based paint, biological hazards and venomous insects, snakes/reptiles, and mold. The HASP should also address the COVID-19.
B. Prepare a Work Plan with Work Schedule for Bureau review and approval prior to commencement of work for ASTM ESA Phase I.
Task II - Conducting ASTM E1527-05/AAI (40 CFR 312.16)
1. The contractor shall conduct the following items in accordance with the ASTM E1527-05 format for the Phase 1 Environmental Site Assessment and the All-Appropriate Inquiry regulations (40 CFR 312.16).
A. Records Review B. Site Reconnaissance C. Interviews D. Report-Evaluations and report
Task III-1 Reporting:
The ASTM report shall be reviewed and stamped by a Professional Engineer certifying that the report was conducted and prepared in accordance with the required standards identified in this contract.
1. Reporting: A final report shall be prepared to document all activities associated with the project. The contractor shall provide two copies of the draft reports for approval by BIA within 15 days of the site investigation. The BIA will review the draft and return the document within 5 days following receipt with corrections.
2. When the draft is approved, the contractor shall prepare five (5) final copies and three electronic file copies in Microsoft Word®/AutoCAD format; two in read-only format and one in write version and marked FOR BIA USE ONLY. The BIA shall be the owner of all documents prepared by the contractor. The contractor shall not copyright or write protect any documents or utilize any data from the project without consent of the Government.
ASTM 1903-11 ESA Phase II Sampling
Work Required: The BIA requires the services of a licensed contractor to conduct environmental sampling of the potential environmental hazardous identified in the ASTM Phase I. The sampling shall require a sampling plan and a certified analyses of the environmental hazards sampled on the land parcels. Following the sampling and analyses, the contractor shall quantify the hazards and develop an abatement plan for removal of hazards and provide an engineer cost estimate identifying location, quantities, volume, and cost for abating these hazards. This document will be used to conduct abatement or cleanup of hazardous materials in accordance with federal regulations in the next phase of the project.
The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the work that successfully completes the objective of the project.
There is no electric power or water to serve the area. The contractor shall be responsible for procuring water and power for the project, if required.
Task 1 Phase II Pre-work Submittals:
A. Health and Safety Plan (HASP). The contractor shall prepare a site-specific HASP in accordance with 29 CFR 1910.120 to allow for the protection of workers, employees, and the public.
1. The plan shall include the company’s respiratory protection plan
2. The plan shall include certificates of workers for HAZWOPER, asbestos, and Lead.
3. PPE plan for hazardous work sites and COVID-19.
B. Name of NVLAP certified laboratory which will be used to analyze samples C. A list of all subcontractors, including qualifications and experience D. Include the CDC COVID-19 practices, as masks are required on the Navajo Nation.
Task II Investigation/Sampling/Analyses
A. Investigation: Within the 81.134 ~ acres if there are findings of concrete foundations left in place, water lines, sewer lines and one two-cell sewage lagoon or sewage control vault. The contractor shall conduct a 100% inspection and sampling with analyses of all potential hazards identified in the ESA Phase 1 of each parcel. If a stained soil is observed during the investigation, sampling of oil stains on ground shall be sampled to identify all contamination and suspect materials of concern present in soil.
Sampling and Analyses
1. Asbestos (Friable and Non-Friable): The contractor shall conduct a thorough inspection of the land area, if their concrete debris is discovered or asbestos containing materials are identified.
The contractor shall prepare a sampling for site that quantifies if the hazards is friable or non-friable asbestos for future clean up.
The contractor shall collect bulk samples and analyze using PLM analyses of the samples to identify any asbestos in equipment such as tanks or transite pipes abandoned in any of the land parcels. The required number of samples to be collected per sample location homogeneous area) shall be followed per NESHAPS regulations, if required for any abandoned building located on these parcels.
2. Lead and Lead Based Paint: The contractor shall conduct a thorough inspection of land areas identified in soils. Analytical methodology identified and approved by BIA shall be in accordance with the sampling plan. Sample methodology shall be XRF instrumentation. If XRF instrumentation is used the contractor shall include in the analytical report section, the certification by the manufacturer/contractor that the XRF unit has received its annual and use driven calibration, the certification of the XRF staff who will use the XRF unit, and the calibration log prepared for the unit for the past year.
3. Hazardous Chemicals: Chemicals are found onsite of the former bureau operations. The contractor shall conduct a thorough inspection the land areas identified for any chemicals or chemical treated building materials disposed for removal as a hazardous or solid waste.
a. Inventory and identify the location, quantities of the chemicals and other waste in disposed on the land areas that is being surveyed.
b. Any treated wooden service (drop) light poles used to support the electrical/telephone systems. The contractor shall inventory and identify on the land site plan the location of the poles. Field test kits may be used to determine if the poles are creosote containing. If the poles are determined to be treated with creosote, the contractor shall identify them as a hazardous waste disposal item.
4. Sewage Lagoon: The contractor shall sample the two-cell sewage lagoon for RCRA metals to determine if the lagoon can be closed. Prepare a plan with cost estimate and quantities of the universal waste in the buildings.
Task III. Engineer Cost Estimate:
The contractor shall prepare a report certified by a Professional Engineer for the disposal of all identified waste identified in the ASTM Phase II. This document shall contain sufficient information to allow BIA to solicit bid proposals to conduct removal of hazardous materials and/or chemicals from the land parcels.
1. Submit the draft report for BIA review and comment.
2. The report shall be certified by a P.E. that the cost estimate is provided based on best management practices and to the best of his/her ability.
3. Discussions may be necessary with BIA to address any concerns identified by the contractor.
IV. Reports:
A. Reports for this work shall describe the work done in the Phase II and include, but is not limited to, the following information:
1. Narrative of the work performed
2. Plotting of areas of contamination to be disposed
3. The nature and extent of contamination in soils
4. Analytical Results
5. Engineer Cost Estimate to conduct disposal of the identified target analytes.
B. A draft report will be submitted for review to BIA within 15 days following completion of the field work. Two copies of the draft report shall be submitted to BIA for review.
C. Following the final review and approval of the draft document by BIA, the contractor shall prepare the final report for the Phase II certified by a professional engineer that the work was done in accordance with the approved sampling plan and federal regulations.
Five copies, three CD will be prepared two CD are to be read only and one CD editable version in MS Word and all tables in Excel. Drawings shall be provided to BIA. The one CD editable version shall be labeled for “BIA Use Only.” All documents collected or prepared for this project are the property of the Bureau of Indian Affairs and must be submitted to the government. The Contractor may not copyright or duplicate the documents without the written permission of the Bureau of Indian Affairs, Navajo Region.
INSTRUCTIONS, CONDITIONS, AND NOTICES TO CONTRACTORS
Special Conditions The Contractor will adhere to all applicable federal and tribal laws and regulations, and payment of tribal taxes. The contractor shall be required to furnish electrical power and procure water to perform investigation, sampling, and mitigation.
There is no electric power or water to serve the area. The contractor shall be responsible for procuring water and power for the project.
The Contractor is responsible for any utilities that are damaged while the work and shall repair them immediately at no cost to the Government.
As data is developed and regulatory agencies provide direction and guidance, contractors shall be expected to provide timely and quality response to issues raised by the regulators. All contact with the public, private or regulatory community shall be made through the BIA, Navajo Region.
No information may be released without the written consent of the BIA Navajo Region.
Requirements Mandatory Site Visit Pre-Work conference Written weekly status report to COR Submittal of Draft and Final documents
Reference Material Chinle Agency Figure 1, Chinle, AZ Chinle Agency Map Parcel A-1
| Other: Contractors who wish to bid on the project must attend the site visit the site prior to bidding on the project. No compensation will be made to contractors for attendance at the site visit. A Site Plan of these parcels will be given to all ... |
| The Period of Performance for ASTM ESA Phase 1 and II is August 1, 2022, through November 30, 2022, or 90 days from the receipt of the Notice to Proceed. |
| OTHER: |
| 1. Contractors must attend the BIA scheduled site visit site prior to bidding on the project. No provisions for payment of site visits are included. |
| 2. There is no power or water available for this project. Contractor must provide their own utilities to conduct both Phase I and Phase II projects, should it be required. |
| TASK I Pre-Work Submittals |
| A. The Contractor shall provide a site-specific Health and Safety Plan (HASP) to address worker protection in accordance with 29 CFR 1910.120 for the overall project. The HASP shall contain certifications/licensures of workers and describe the use o... |
| B. Prepare a Work Plan with Work Schedule for Bureau review and approval prior to commencement of work for ASTM ESA Phase I. |
| Task II - Conducting ASTM E1527-05/AAI (40 CFR 312.16) |
| 1. The contractor shall conduct the following items in accordance with the ASTM E1527-05 format for the Phase 1 Environmental Site Assessment and the All-Appropriate Inquiry regulations (40 CFR 312.16). |
| A. Records Review |
| B. Site Reconnaissance |
| C. Interviews |
| D. Report-Evaluations and report |
| Task III-1 Reporting: |
| The ASTM report shall be reviewed and stamped by a Professional Engineer certifying that the report was conducted and prepared in accordance with the required standards identified in this contract. |
| 1. Reporting: A final report shall be prepared to document all activities associated with the project. The contractor shall provide two copies of the draft reports for approval by BIA within 15 days of the site investigation. The BIA will review th... |