SOW ChemPOL.pdf
PDF 282 KB Posted
- Attached to
- ChemPOL - Statement of Work Federal contract opportunity
- Solicitation number
- Not on record
- Issued by
- Defense Logistics Agency Aviation
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C – REQUIREMENTS
Statement of Work
Chemicals, Packaged Petroleum, Oil, and Lubricants (Chem/POL)
In Support of All U.S. Military, Foreign Military, and Non‐Military Customers
TABLE OF CONTENTS
1.0 INTRODUCTION AND SCOPE
1.1 Contractor Responsibilities
1.2 Government Responsibilities
1.3 Customer Service/Marketing Outreach
2.0 ENVIRONMENTAL
3.0 TRANSITION & OPERATIONAL CAPABILITY
3.1 Transition
3.2 Initial Operational Capability
3.3 Full Operational Capability
4.0 SYSTEM INTERFACE & INTEGRATION
5.0 VENDOR MANAGED INVENTORY
6.0 TECHNICAL
6.1 Items Descriptions
6.2 Safety Data Sheets (SDS) & Hazardous Warning Labels (HWL)
6.2.1 SDS
6.2.2 HWLS
6.3 Submission of SDS Data Set Requirements
6.4 First Article & Production Lot Testing
6.5 Origin Inspection
6.6 Environmental Protection Agency – Designated Products
6.7 Forecasting & Inventory Management
6.7.1 Shelf Life Management
6.7.1.1 Contractor Furnished Inventory
6.7.1.2 Vendor Managed Inventory
6.8 Distribution & Transportation
6.8.1 OCONUS Sea Containers
6.8.2 Transportation
6.9 Delivery Requirements
6.9.1 Fill Rate Measurement
6.9.2 Time Definite Delivery Requirements
6.9.3 Backorders
6.9.4 Inactive Material
6.9.5 Disaster Relief Orders
6.9.6 Material Returns
6.9.7 Disposals
6.9.8 Product Quality & Supply Deficiencies
7.0 REPORTING REQUIREMENTS
8.0 END OF CONTRACT SUPPORT
9.0 CONTRACT EXPIRATION
10.0 POST AWARD CONFERENCE
INTRODUCTION AND SCOPE
This Statement of Work (SOW) defines the scope of effort required to provide logistics support for chemicals and packaged petroleum products in Federal Supply Classes (FSCs): 6810 ‐
Reagent and Technical Grade Chemicals; 6820 ‐ Dyes; 6840 ‐ Pesticides, Disinfectants, Repellents & Deodorants; 6850 ‐ Miscellaneous/Compounded Chemicals; and 9150 ‐ Packaged
Petroleum, Oil, and Lubricants, but excluding Class I Ozone Depleting Substances (ODS).
1.1 CONTRACTOR RESPONSIBILITIES
1.1.1 The Contractor shall be responsible for supplying all Chem/POL National Stock Numbers
(NSN) in addition to the integrated support of all FSCs for DLA customers through customer direct shipments to Continental US (CONUS), Outside Continental US (OCONUS), and the replenishment of Forward Stocking Locations (FSL) through Defense Logistics Agency (DLA) direct shipments. DLA’s customers include the Department of Defense (DoD), other civilian agencies, and Foreign Military Sales (FMS).
1.1.2 The Contractor shall perform comprehensive supply chain management of chemicals and packaged petroleum products to include but not limited to the following:
a. Procurement of materials
b. Planning & Forecasting
c. Order Processing & Fulfillment
d. Procurement & Purchasing
e. Inventory Management
f. Quality Control
g. Shelf‐Life Management
h. Storage, Packaging, Transportation & Distribution
i. Obsolescence Management
j. Data Management & Delivery
k. Customer Support Services
l. Material Returns
1.1.3 The Contractor shall also be responsible for the following:
a. Handling customer returns associated with Product Quality Deficiency Reports
(PQDR) and Supply Discrepancy Reports (SDR) for all items.
b. Maintain a single point‐of‐contact to interface with the Government’s Program
Manager to ensure timely resolution of business and technical problems and implementation of corrective action.
c. The contractor will not knowingly procure and supply counterfeit products or materiel. The supplier shall take the necessary actions to mitigate counterfeit occurrences. If counterfeit products or materiel are found, the supplier shall investigate and report incidents to the Government Industry Data Exchange Program
(GIDEP) system. The supplier shall provide similar guidance to sub‐ vendors and sub‐ suppliers to ensure supply chain integrity.
1.2 GOVERNMENT RESPONSIBILITIES
The Government will be responsible for the following:
a. Provide DLA Customer Account Specialist (CAS) Point of Contacts (POC) to coordinate communications with customers (who have assigned CASs) and provide assistance with Contractor access to customer locations.
b. Maintain responsibility of alternate source approvals, surplus offers, First Article Test
(FAT) requirements, Qualified Products List (QPL), Quality Assurance Letters of
Instruction, Government Lot Acceptance Testing, PQDR/SDR approval, Military/Federal
Specifications, waivers and deviations, creating new NSNs as required, maintaining the
Qualified Status List (QSL), approving Safety Data Sheets (SDS) and Hazard Warning
Labels (HWLs), origin inspection determination, provide access to the QSL on an as needed basis, and Procurement Item Descriptions (PID) updates.
c. Make semi‐annual Economic Price Adjustments (EPA).
d. Provide Contractor access to Government systems, such as, but not limited to
Hazardous Material Information Resource System (HMIRS) & webSDR, as needed.
e. Furnish all drawings and bid sets.
1.3 CUSTOMER SERVICE / MARKETING OUTREACH
The Contractor shall establish at a minimum a toll‐free number and web site link that DLA may use to query the status of requisitions.
The Contractor shall establish a Marketing Outreach Program to increase utilization of this
DLA contract and to educate customers on products/alternatives available for sale through the DLA Chem/POL Privatization Program. DLA will assist in the identification and engagement of potential new customers. New customer engagement may include discussions and/or slide presentations. The Contractor shall discuss its customer outreach efforts with DLA during Program Management Reviews.
2. 0 ENVIRONMENTAL REQUIREMENTS
2.1 The Contractor shall obtain and maintain all required federal, state, municipal, and international certifications, licenses, permits, registrations and approvals that may be required to perform this contract. The Contractor and any subcontractor shall possess or obtain their own, non‐Government, EPA RCRA identification number(s) and follow the regulations of 40 CFR 260‐280. The Contractor is responsible for reporting under EPCRA
(all applicable sections), as well as providing such data or other appropriate data to the customer/installation allowing the customer/installation to meet its
Federal/State/Local/DoD and international environmental reporting requirements.
2.2 Any time the Contractor communicates with or is contacted by an environmental or other regulatory agency at any level, or is required to communicate with such agency, as pertains to this program, it shall notify the Contracting Officer via e‐mail within 4 hours of the communication with or contact by an environmental/regulatory entity. In addition, the
Contractor shall notify the Contracting Officer of any spill via e‐mail within 4 hours of the spill or the discovery of the spill.
2.3 A spill is defined to be any release of a material from its primary container (i.e. the container that has an intimate contact with the material) that results in any loss of the material (i.e. asset), and the need to recoup, repackage, reissue or dispose of the asset whether or not the spill needs to be reported to a regulatory body under the various
Federal, State, or Local environmental or occupational‐safety regulations.
2.4 Reporting Protocol:
1. Designated Contractor POC notifies DLA Aviation Contracting Officer via e‐mail.
2. Notification occurs within 4 hours of the incident's occurrence or discovery of the incident.
3. Notification covers asset(s) in transit to requisitioner(s) as well as in storage awaiting distribution.
4. Notification applies to Vendor Managed Inventory (VMI) (see Section 5.0) as well as non‐VMI assets.
5. Notification to include the following information at a minimum:
a. Identify location of incident / approximate time of incident / injuries if any
b. Identify nature of incident
c. Identify and List NSN(s), Logistics Item Name(s), Contract #(s), Unit of Issue (U/I), number of U/I(s) affected
d. Identify total quantity/volume spilled (approximation)
e. Identify collateral damage (i.e. other assets/properties affected by incident)
f. Identify actions taken to contain/remediate incident
g. Identify corrective actions to minimize and/or eliminate future incidents of type noted
6. Closing & follow‐up notification within 7 calendar days of incident indicating state of affairs relative to incident to include any and all copies (at least for VMI) of all official notices sent to the various regulatory agencies where official notice and follow up are required.
7. Contractor notifies Local/State/Federal regulatory entities and the Contracting Officer depending on the type, nature, and volume of the spill.
2.5 The Contractor shall be responsible for any fines or penalties incurred as a result of a spill.
For reportable spills and instances of fines, penalties, and notices of violation, the
Contractor shall notify the Contracting Officer within 4 hours; for all other communications or contacts with Government environmental regulators, the Contractor shall notify the Contracting Officer as soon as practicable, but in no event later than 4 hours after the communication or contact. In addition, the Contractor shall provide a copy of all documents or electronic media related to such communications or contacts to the Contracting Officer at no expense to the Government. The Contractor shall not assert a privilege or other reason to withhold any such document or electronic media. This paragraph applies to all work under this contract.
3.0 TRANSITION & OPERATIONAL CAPABILITY
3.1 TRANSITION
Transition must be synchronized among the Contractor, DLA Distribution and DLA Aviation to ensure that customer requirements remain satisfied during the transfer with little or no disruption in customer support, in accordance with the approved transition plan.
3.2 INITIAL OPERATIONAL CAPABILITY (IOC)
The Contractor shall be capable of receiving and processing orders (manual and EDI) thirty
(30) calendar days prior to receiving the first order for supplies.
3.3 FULL OPERATIONAL CAPABILITY (FOC)
The Contractor shall have completed transition within 365 calendar days after contract award or once the Contractor assumes responsibility for individual products during transition. The Contractor shall assume responsibility for all NIINs in the listing of Active
NIINs / Schedule of Supplies and Inactive NIINs within the timeframes specified in its
Transition Plan.
4.0 SYSTEM INTERFACE & INTEGRATION
4.1 The Contractor shall be capable of receiving and processing orders both manual and via
Electronic Data Interchange (EDI) 30 calendar days prior to receiving the first order for supplies.
4.2 DIBBS. Delivery orders will be available through the DLA Internet Bid Board System (DIBBS) which requires that the Contractor possess Internet capability to receive email notification that an order is available on the website, https://www.dibbs.bsm.dla.mil.
4.3 ANSI X12. The American National Standards Institute (ANSI) X12 Standard will be utilized for formatting the EDI transactions. Information regarding EDI, ANSI X12 transactions, and Defense Automated Addressing System (DAAS) approved Value
Added Networks (VANs) can be obtained from the DAAS web site by going to https://www.daas.dla.mil/daashome/edi‐vanlist‐dla.asp.
4.4 The specific EDI transactions that will be exchanged between the Contractor and the
DLA for this effort are:
EDI 850 Delivery Order
EDI 997 Functional Acknowledgement of Delivery Order
EDI 856 Ship Notice/Manifest Transaction Set
4.5 Delivery orders will be issued via the 850 EDI transaction. The functional acknowledgement (997 EDI transaction) will constitute the Contractor’s receipt of the delivery order. The shipment notice (856 EDI transaction) will constitute the date of shipment.
4.6 The contract may specify the following VMI EDI requirements where VMI is applicable: VMI
Transactions:
EDI 945A ‐ Shipment Confirmation into SAP
EDI 947I ‐ Inventory Adjustment or change in Condition code
EDI 527R ‐ Receipt due‐in confirmation into SAP
EDI 945A ‐ DSS denial into SAP
EDI 511R ‐ Customer requisition, passing order, or redistribution order into SAP
EDI 940R ‐ MRO/DRO/RDO or follow‐up from MRO/DRO/RDO out from
SAP
EDI 869A ‐ Customer follow‐up out from SAP
EDI 945A ‐ DSS Current status of customer requisition into SAP
EDI 846P ‐ Request for Physical Inventory Count out from SAP
EDI 945A ‐ Response to MRO/DRO/ cancellation into SAP
EDI 869C; 940R ‐ Cancellation Request out from SAP
EDI 527D ‐ Due‐in to storage site out from SAP
EDI 846R‐ DZH/DZN Location Reconciliation Request
EDI 846R; 527R – DZK Transaction History Transmittal
EDI 846P ‐ Request for Inventory
EDI 846R ‐ History Transaction
VMI Order Fulfillment Features:
OF‐INT‐0011 (945A) – Shipment confirmation into SAP
OF‐ INT‐0039 (947I) – Inventory adjustments/change in condition code
OF‐ INT‐0049 (527R) – Receipt due‐in confirmation into SAP
OF‐ INT‐0051 (945A) – DSS denial into SAP
OF‐ INT‐0055 (511R) – Customer requisition, passing order, or redistribution order intoSAP
OF‐INT‐0056 (940R) ‐ MRO/DRO/RDO or follow‐up out from SAP
OF‐INT‐0060 (869A) – Customer follow‐up for MRO/DRO/RDO out from
SAP
OF‐INT‐0061 (945A) – DSS current status of customer requisition into SAP
OF‐INT‐0071 (846P) – Request for Physical Inventory Count out from SAP
OF‐INT‐0091 (945A) – Response to MRO/DRO/cancellation into SAP
OF‐INT‐0092 (869C; 940R) – Cancellation request out from SAP
OF‐INT‐0106 (527D) – Due‐in to storage site out from SAP
OF‐INT‐0167 (511R) – Post Issue
OF‐INT‐5105 (846R; 527R) – (IRM) Transaction history transmittal
DZH/DZN
OF‐INT‐5107 (846P) – Request for inventory
OF‐INT‐5108 (846R) – History transaction
4.7 Multiple Contract Numbers: Due to the extraordinary volume of delivery orders under this contract, the listing of available supplementary procurement instrument identification (PII) numbers for delivery orders is expected to be exhausted. In order to prevent duplication of supplementary PII numbers, it will be necessary to create multiple additional basic PII numbers for this contract.
4.8 Supplies and services already acquired under the initial contract number shall remain solely under this contract number for purposes of Government inspection, acceptance, payment, and closeout. All delivery orders, beginning after a date to be specified by the
Contracting Officer during the period of performance, will be accomplished under the new contract number. All new material that is to be placed on order following the specified date shall be labeled with the new contract number. Issuance of a new contract number may occur multiple times over the course of the contract.
4.9 Modifications to the basic contract will be issued against the original contract number.
5.0 VENDOR MANAGED INVENTORY (VMI)
5.1 VMI refers to DLA‐owned material in the custody of Contractors that perform warehouse management responsibilities under contract with DLA. VMI is defined as DLA‐owned materiel stored at or managed through a Contractor location that performs warehouse management responsibilities under contract with DLA.
5.2 The contractor will develop a plan for managing VMI that will be approved by DLA. DLA will identify existing Government‐owned inventory which may be transferred to the Contractor as VMI. If there is residual VMI on the existing contract when this contract is awarded, it will be transferred to the Contractor who shall then be accountable for the VMI. The
Contractor shall develop and submit its Property Management Plan as part of its proposal.
Once the plan is approved by DLA, the plan will be incorporated into the contract and the
Contractor shall manage the property in accordance with its approved plan. The Contractor shall use the VMI assets to fill requisitions.
5.3 Inventory will be physically transferred from the Government‐designated locations to the
Contractor for storage and distribution in following scenarios:
Current operational and emergent worldwide support may require the redistribution of Government‐owned OCONUS assets to the Contractor’s
CONUS facilities.
Unauthorized customer returns to DLA CONUS stock locations will be declared excess material by the Government and sent to DLA Disposition for further processing. Excess material is defined as any material returned to the Government that will not be passed on to the Contractor.
5.4 The Government will retain title to the inventory. The Contractor must use VMI to satisfy orders until the VMI is depleted; once VMI is depleted, the Contractor shall fill orders from Contractor‐owned inventory. VMI can only be used to satisfy Government demands issued against this contract.
5.5 The decision to transfer VMI to the Contractor shall be made on an ad hoc basis through bi‐ lateral agreement between the Contractor and the Government and may be accomplished in phases if needed. Once the Contractor has established an unconstrained commercial pipeline for product support, the Contractor shall have the final determination on whether a product is acceptable and in what quantities, as VMI. In each phase, when a quantity of
Government inventory is identified, the inventory will be blocked from issue at the depot and physically transferred to the Contractor’s facility at Government expense. The
Contractor and the Government will jointly inspect, count, and reconcile the incoming inventory. A record of this transfer will be maintained by the Contractor and provided to the cognizant administration office and Contracting Officer. Any questions concerning the acceptability of the incoming stock and/or the amount of inventory received will be resolved before the Contractor places the stock into its inventory and creates the record of the liability for the inventory from the Government.
5.6 The Contractor shall work with the Contracting Officer to resolve issues regarding the receipt and acceptance of the DLA inventory. These issues may be related to such things as damaged material, shipment quantity or material discrepancies. The Government will bear the expense of correction or disposal of any stock damaged prior to acceptance by the
Contractor. After acceptance of the VMI stock by the Contractor, the Contractor shall be responsible for and bear the expense of any damaged containers, leaks, spills or other releases of material. Regardless of which party bears the expense, if damaged VMI stock is to be disposed, the process outlined in 6.9.7, Paragraph 2, Disposals of the SOW shall be followed.
5.7 After the Contractor accepts the transferred inventory, the Government will start routing requirements to the Contractor via Electronic Data Interchange for the Contractor to fill from the inventory.
5.8 The Contractor shall be responsible and accountable for all Government inventory accepted into stock. The Contractor shall provide for preservation, protection, maintenance, and repair of the Government inventory in accordance with sound industrial practice. The
Contractor shall maintain an auditable inventory of the transferred Government stock. The
Government reserves the right to inspect and audit the VMI and the Contractor’s VMI records at any time during performance of the contract.
6.0 TECHNICAL REQUIREMENTS
6.1 ITEM DESCRIPTIONS
All materials delivered under this contract shall be provided in strict compliance with the applicable
Procurement Item Description (PID) requirements. The Contractor is responsible for notifying the
Government if the part number or technical data (including specification and drawing revisions) are different from the information cited in the PID. Until the Government has approved such a change, the Contractor shall provide the product in accordance with the PID.
The Contractor shall receive Government approval prior to ordering material from sources other than those approved in the PID, on a source‐controlled drawing, or in a qualified products list.
Contract Data Requirements List (CDRLs), DD Form 1423 may apply to this procurement. CDRLs are used to delineate any requirement for data which must be provided by the contractor as deliverable items. This can include, but is not limited to, Pre‐production Test Reports, special process demonstration reports, First Article Testing reports, Production Lot Testing reports, etc.
If a CDRL applies, it will be stated in PID Text/Item Description as a QAP with CDRL in the description.
CDRL documents are posted to cFolders (https://pcf1.bsm.dla.mil/cfolders/).
6.2 SAFETY DATA SHEETS (SDS) & HAZARDOUS WARNING LABELS (HWLs)
6.2.1 SAFETY DATA SHEETS (SDS)
SDSs are required for all materials delivered under this contract that meet the definition of hazardous as set forth in the latest version of Federal Standard 313 (including versions or changes adopted during the life of the contract). The Contractor should pay particular attention to paragraph 4.3 of Federal Standard 313 (Additional Information Required on the
SDS). SDS and HWLs must be submitted together for approval. The contractor will also provide updated SDS and HWL when formulations of the original procured product have changed.
For materials being shipped overseas and containing hazardous chemicals identified in
European Regulation (EC) No 1907/2006 (Registration, Evaluation, Authorization and
Restriction of Chemicals (REACH)), then the contractor must comply with REACH requirements regarding SDS' and labeling requirements of European Regulation (EC) No
1272/2008 (classification, labelling and packaging of substances and mixtures).
6.2.2 HAZARDOUS WARNING LABELS (HWLs)
Items shall be labeled in accordance with 29 CFR 1910.1200 unless otherwise directed by 29
CFR 1910.1200 (b) (5).
6.3 ELECTRONIC SUBMISSION OF SDS DATA SET‐ REQUIREMENTS
The Contractor shall be required to link and provide the SDS associated with the Delivery Order (DO).
The contractor shall also be required to provide electronically the following dataset for interfacing with DLA Aviation’s SDS Delivery Order Application (DOA) program: NSN; Contractor Serial Number;
Contract and DO Number; Source of Supply; Contractor Source of Supply CAGE; Manufacturer/
Responsible Party CAGE; SDS Responsible Party; SDS Preparation Revision Date; and Product Name.
The data is to be transmitted electronically from the Contractor to the DLA SDS Web Service site using an XML data structure in a Simple Object Access Protocol (SOAP) format. An example of the
SOAP format being used can be found at https://apps.Aviation.dla.mil/msds_delivery/deliveryorder?WSDL. The Contractor has the option of providing an optional file name for the transmission sent in order to confirm the accuracy of the data transmission. Upon receipt of the transmission, the Web Service will send a message acknowledging receipt. Data transmission to the Web Service requires authorized access by a company user which must be obtained through the DLA Application and Provision System (AMPS).
The system of record for SDS will be the Government’s Hazardous Material Information Resource
System (HMIRS).
6.4 FIRST ARTICLE / PRODUCTION LOT TESTING
NSNs that require Government/Contractor First Article or Production Lot Testing are identified in the list of active NIINS and the PID data.
6.5 ORIGIN INSPECTION
DCMA source inspection at the Government’s approved source’s location and Contractor’s distribution facility is required for all Aircraft Launch and Recovery Equipment (ALRE), Critical Safety
Items (CSI), and other NSNs as designated by DLA Aviation. ALRE, CSI and other NSNs designated by
DLA Aviation are identified in the Quality Matrix and are subject to change throughout the term of the contract. The Contractor’s commercial purchase orders shall include Government source inspection clauses for those NSNs. DCMA source inspection at the contractor’s distribution facility is required for FMS orders. It will be the Contractor’s responsibility to contact DCMA to schedule inspection.
6.6 ENVIRONMENTAL PROTECTION AGENCY‐DESIGNATED PRODUCTS
The Contractor shall be required to adhere to all environmental rules and regulations associated with the maintenance, storage and inventory, and order fulfillment of chemicals and packaged petroleum product assets in accordance with FAR Part 23, including the requirements of Executive
Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and requirements associated with EPA’s Comprehensive Procurement Guidelines (CPG) program that mandates certain items of supply be procured with recycled/post‐consumer use content. The CPG program applies to FSC 9150, lubricating oil (re‐refined, not synthetic); and 6850, misc. chemical specialties.
The Contractor shall procure and supply products in the applicable FSCs with USDA/EPA mandated bio‐based content. The Contractor shall also procure and supply environmentally friendly/green/recyclable products in the applicable FSCs in accordance with Federal statutes, regulations, or Executive Orders as they are published during the course of this contract.
6.7 FORECASTING & INVENTORY MANAGEMENT
The Contractor shall be responsible for forecasting and inventory management of all products as cited as Active Items to include any items added after contract award, to meet the Government‐ established delivery requirements. The Contractor’s forecasting shall include planning for the replenishment of DLA’s OCONUS Forward Stock Locations (FSLs). The Contractor shall be prepared to support those requirements in addition to customer direct order activity received during the life of the contract.
Any NSNs with a Nuclear Reactor Program Weapon System Designator Code (WSDC) of 21N will be designated as a “Never Out” item. The Contractor shall be expected to stock adequate quantities of these NSNs to have a high probability of never being out of stock. The Contracting Officer may designate other NSNs, in addition to those with a WSDC of 21N, as “Never Out” items. The
Contracting Officer may specify NSNs in addition to the “Never Out” items as special interest for the purposes of reporting.
This population of items may be refreshed bi‐weekly. If the item is a new addition to the contract, it is excluded from metrics for one Production Lead Time (PLT).
6.7.1 SHELF‐LIFE MANAGEMENT
6.7.1.1 CONTRACTOR‐FURNISHED INVENTORY
Minimum Shelf‐life upon Delivery of Contractor Furnished Material (CFM): The Contractor’s forecasting and inventory management practices shall ensure that, upon delivery, items with a shelf‐life cited in the Purchase Order Text (POT) will have a remaining shelf‐life, as follows:
For items with a shelf life of: Upon delivery, item shall have remaining shelf life of at least:
18 months or greater 12 months
12 months or greater but less than 18 months
9 months
9 months or greater but less than 12 months
7 months
6 months or greater but less than 9 months
4.5 months
Re‐certification – The Contractor shall ensure that a rigorous program of stock screening is in place to ensure proper turn‐around of shelf life designated materials that is comparable to or more stringent than that currently utilized by the Government. All re‐ certification risk is borne by the Contractor. The Contractor shall identify and submit to DLA Aviation for approval, the laboratories they will be utilizing for shelf‐life extension testing for Contractor
Furnished Material (CFM).
6.7.1.2 VENDOR‐MANAGED INVENTORY (VMI)
When VMI is established, a minimum Shelf‐life upon Delivery of VMI to CONUS customers will be required. The Contractor shall ensure that, upon delivery, VMI with a shelf‐life cited in the PID will have a remaining shelf‐life as follows:
of at least:
18 months or greater 3 months
12 months or greater but less than 18 months
3 months
Exceptions to the VMI shelf‐life requirements above are Fleet Logistics Center (FLC) Norfolk
(DODAAC N00189) and FLC San Diego (DODAAC N00244) which require a remaining shelf‐life of 6 months for all items in the above categories.
When VMI is established, a minimum Shelf‐life upon Delivery of VMI to OCONUS customers will be required. The Contractor shall ensure that, upon delivery, VMI with a shelf‐life cited in the PID will have a remaining shelf‐life as follows:
of at least:
18 months or greater 12 months
12 months or greater but less than 18 months
6 months
All shelf‐life extension testing for VMI will be performed by Government laboratories.
Shelf‐life laboratory testing results shall be provided to DLA Aviation for QSL updates.
6.8 DISTRIBUTION & TRANSPORTATION
6.8.1 OCONUS SEA CONTAINERS:
Upon notification from DLA Distribution that an OCONUS order requires a sea container
(SEAVAN), the Government will modify the delivery order to reflect FOB Origin and inspection/acceptance at origin terms. DLA Aviation will retain QA inspection and acceptance authority for OCONUS sea container orders.
The Contractor shall establish and maintain the capability to stage, pack and ship SEAVANs to support filling large OCONUS stock orders. The Contractor shall provide the following information to DLA Aviation: contract and delivery order number to include digital pictures of the NSN shipped, sea container loaded, blocked, and braced, and prior to DLA Aviation acceptance.
Active Radio Frequency Identification (aRFID) tags shall be utilized for all SEAVAN shipments.
6.8.2 TRANSPORTATION
The Contractor shall be responsible for all shipments of products in accordance with 49 CFR
170‐178, International Maritime Organization – International Maritime Dangerous Goods
(IMO‐IMDG), International Civil Aviation Organization – International Air Transport
Association (ICAO‐IATA), and Military Aircraft (MILAIR) [Air Force Manual (AFMAN) 24‐
204]. The Contractor shall be responsible for shipment of materials from its facility to the customer within CONUS; to the customer or designated Container Consolidation Points
(CCPs) or Point‐of‐Embarkation (POEs) for OCONUS; or to freight forwarders for FMS orders. The Contractor shall also be responsible for transporting customer material returns and discrepant orders from both CONUS and OCONUS customer sites to the
Contractor’s facility.
Vendor Shipping Module (VSM): The Contractor shall establish a VSM profile. To create a profile, contact the DLA Distribution (Code: TOT (1‐800‐456‐5507)) which will assign a unique User Name and Password to access the website at https://vsm.distribution.dla.mil/net. The Military Shipping Label (MSL) and carrier information/shipping instructions should be available in VSM within 24 hours of initial shipment registry. The carriers chosen by the Government will be responsible for shipping from the CCP, POE or Freight Forwarder point to the OCONUS customer destination.
6.8.3 FMS ORDERS
Upon notification from the Contractor that an FMS order was received, the Government will modify the FMS delivery order to reflect FOB Origin and Inspection/Acceptance at
Origin with DCMA Administration. Once the modification is complete, the Contractor shall request shipping instructions by utilizing the Shipping Information Request (SIR) application, available through DCMA’s website: https://www.DCMA.mil. SIR submittals will not include additional shipping documentation, i.e. WAWF, DD1348, DD1149, DD250.
Once shipping instructions are received from SIR, the inspection process will start
(scheduling, acceptance, shipping documentation, WAWF entry).
The cost of any transportation furnished but not used due to a Contractor issue will be charged to the Contractor.
FMS orders may remain at the Contractor’s facility for an extended period of time pending foreign country clearances. The Contractor should be aware of the potential impact of delays in shipping FMS items and the impact on shelf life. Items designated as FMS are not relieved from the stated shelf‐life requirements due to delays in shipping authorizations.
6.9 DELIVERY REQUIREMENTS
6.9.1 FILL RATE MEASUREMENT
Although the Contractor shall be required to meet the TDD standards, the Fill Rate (FR) measurement will be based on ship date rather than delivery receipt date. The Contractor is required to meet a 90% Material Fill Rate for all Chem/POL items except Nuclear Reactor
Program (NRP) items which must meet a fill rate of 95%.
FILL RATE MEASUREMENTS
CONUS and OCONUS Shipment to CCPs/POE
Delivery Order Category (CAT)
Codes
Priority 01 –
CAT 1 (High Priority)
2 Day
Priority 04 –
CAT 2 3 Day
Priority 09 –
CAT 3 4 Days
Although performance tracking will start upon the issuance of the first delivery order, the Fill
Rate Metric will assess performance over a 12‐month performance period. The first performance period will start at FOC and will continue through contract expiration.
Fill Rate: The amount of time measured from receipt of order to shipment. Although the contractor is required to meet the TDD Standards outlined in the SOW, the Fill Rate will be measured based on ship date rather than delivery receipt date. Monthly fill rates will be computed to assess contractor performance and identify problems as they occur. The material fill rate percentage is calculated by taking the total number of orders shipped complete within the designated timeframe, divided by the total number of orders received during that same timeframe. Both the monthly and annual performance Fill Rate percentage will be computed using this calculation.
Fill Rate percentage will be measured on the formula below: FR% = (TRS/TRR) * 100
Where: FR% = Fill Rate (rounded to the nearest tenth)
TRS = Total Orders Shipped complete within the designated measurement timeframe
TRR = Total Orders Received in a specific performance period
6.9.1.1 FILL RATE EXCEPTIONS
The following Fill Rate exceptions will apply:
a. Newly‐added NSNs (excluded until one full PLT has passed)
b. FOB Origin (SEAVAN or Direct Shipment) orders
c. Government Source Inspection delivery orders
d. Cancelled delivery orders
e. Bulk orders
f. Inactive NSNs
g. Significant spikes, defined as any demand spike that is three (3) times or greater than the previous three (3) months demand average
h. Excusable delays; see clause 52.214‐4
6.9.2 TIME DEFINITE DELIVERY REQUIREMENTS
The Contractor shall ensure each order is satisfied within the following Time Definite Delivery
(TDD) requirements:
TDD DELIVERY STANDARDS
CONUS and
OCONUS Shipment to CCPs/Ports of Embarkation
Issue Priority Designator (IPG)
FOB Destination
Priority 01 – 03 IPG 1 (High Priority) 6 Business Days
Priority 04 – 08 IPG 2 10 Business Days
Priority 09 – 15 IPG 3 15 Business Days
High priority Customer Direct (CD) requirements are identified by Military Standard
Requisitioning and Issue Procedures (MILSTRIP) priority designator codes 01, 02, and 03, and routine CD requirements are identified by MILSTRIP priority designator codes 04 through 15.
The Contractor has successfully filled a CONUS demand when, after receipt of an electronic requisition, the customer has received a product at the customer designated site within the specified TDD standards. The Contractor has successfully filled an OCONUS/FMS demand when, after receipt of an electronic requisition, the Contractor has delivered a product to the designated CCP, freight forwarder, or CONUS POE for OCONUS customer direct orders within the specified TDD standards.
6.9.3 BACKORDERS
A backorder is any order that is not shipped complete in accordance with the established fill rate. Backordered delivery orders will be included in the Delivery Disincentive.
6.9.4 INACTIVE MATERIAL
NSNs contained on the List of Inactive Items are exempt from the Fill Rate metrics. Inactive items are items defined as having less than four demands per year. Items will be moved from the inactive to the active items as demands increase.
6.9.5 DISASTER RELIEF ORDERS
Disaster Relief Items are products that have been labeled as Disaster Relief NSNs. Disaster
Relief orders will be assigned a specific project code provided by DLA and shall be filled as soon as possible, but in no event shall material be shipped later than 2 business days from the Contractor’s receipt of the order. Upon request and on an as needed basis, the
Contractor shall provide reporting on Disaster Relief NSN stock levels.
The supplier will be notified upon DLA Aviation receipt of Disaster Relief Project code. The supplier shall be responsible to provide status on all orders associated with this project code daily. All metrics are applicable to these orders.
6.9.6 MATERIAL RETURNS
The Government does not authorize material returns outside of the PQDR/SDR process (See
6.9.8 of the SOW).
If the Contractor chooses to provide a material return service, the Contractor shall be responsible for picking‐up material returns at customer sites (both CONUS and OCONUS) and shipping these assets to the Contractor’s facility. The Contractor shall indemnify the
Government from any and all liability relating to materials returns, spills and non‐compliant storage arising under Resource Conservation and Recovery Act (RCRA), Comprehensive
Environmental Response Compensation and Liability Act (CERCLA), and any other related or similar federal, state, local, and foreign country laws and regulations. All Government markings/labels will be removed before the Contractor can recycle or sell material outside this contract.
6.9.7 DISPOSALS
Contractor‐Owned Material. The Contractor shall be responsible for disposing any
Contractor‐owned material, including material returns. Disposal actions shall be in accordance with all applicable local, state, federal and foreign country laws and regulations, including CERCLA, RCRA, etc. Prior to disposing Contractor‐owned material and prior to re‐using or selling the Contractor‐owned material outside of this contract
(including material returns under paragraph 6.9.6 above), the Contractor shall ensure that it eliminates from the material packaging all reference to the Department of
Defense, this contract number, the National Stock Number or any other marking that would suggest Government ownership of the material. All costs associated with this disposal are at the expense of the contractor.
Vendor Managed Inventory: The Contractor shall not perform the recycling/disposal of
VMI that is identified to be excess inventory and/or VMI that experiences shelf‐life expiration which fails re‐certification process. The Contractor shall identify such material to the Contracting Officer as “excess material.” The Contracting Officer shall review the material and, if appropriate, declare it “excess inventory.” The Contracting Officer will authorize the Contractor to contact DLA Disposition for instructions regarding further processing of excess inventory. The Contractor shall not accumulate material subject to waste classification (e.g., shelf‐life expired material that cannot be extended or is in a damaged container) beyond 90 calendar days unless the Contractor possesses a RCRA Part
B operating permit for long‐term storage. Storage (RCRA generator accumulation) beyond
90 calendar days for generators without a Part B permit can subject the generator to the rules regarding establishment of a Solid and Hazardous Waste Management Unit
(SHWMU), and potentially facility wide corrective action. The Contractor will be paid appropriate costs for any VMI determined excess inventory that the Contractor arranges and pays to ship to the Government’s receiving point, according to the same throughput fee that would be paid for shipping the same items (NSNs and associated quantities) in response to regular delivery orders issued under the contract.
6.9.8 PRODUCT QUALITY DEFICIENCIES & SUPPLY DISCREPANCIES
The Contractor shall process all PQDR/SDR actions. The contractor is required to obtain and maintain WEBSDR access at:
https://www.transactionservices.dla.mil/daashome/websdr.asp
The Contractor shall investigate and resolve PQDR/SDR actions relating to non‐ conforming or discrepant material. The Contractor shall submit its recommended resolution to the
Contracting Officer within 15 calendar days of being notified of the action by the customer.
For Type W SDRs written for shipments that do not have the required information/packaging to enable forward movement (i.e., frustrated shipments), the
Contractor shall submit its recommended resolution to the Contracting Officer within 5 calendar days of being notified of the discrepancy. The Contractor shall track PQDR and
SDR receipts and resolution and shall include this information in the annual review with the Government. The Contractor shall be responsible for picking up and correcting or replacing any material requiring correction or replacement, and for delivery of conforming goods to the customer.
7.0 REPORTING REQUIREMENTS
Occurrence Reporting. The Contractor shall provide the following information via e‐mail to the
Contracting Officer on an individual occurrence basis during the period of performance of the contract:
a. Product Quality Deficiencies (include NSN, quantity returned, customer, disposition of material)
b. VMI inventory reported monthly by facility DODAAC (include NSN, quantity, disposition of material) in a MS Excel spreadsheet.
c. Hazardous Spill Reporting
8.0 END OF CONTRACT SUPPORT
Upon expiration or termination of the contract, the Contractor shall provide the Government all requested demand, forecast, and spend data and information necessary to prepare a follow‐on solicitation. The Contractor may also be asked to provide supplier information. The Contractor shall participate in meetings with the Government and the new contractor to ensure an orderly transition from the old contract to the new contract.
9.0 CONTRACT EXPIRATION
Upon contract expiration, the Government will not be required to purchase from the Contractor any inventory purchased by the Contractor to support the requirements of this contract. The
Contractor may negotiate a commercial sale to the successor contractor, but the Government disclaims any responsibility or obligation to facilitate any such sale.
The Contractor shall continue to comply with the delivery requirements of this contract for all orders received up to the expiration date.
10.0 POST AWARD CONFERENCE
The Contracting officer, in conjunction with the cognizant ACO, may require a post‐award conference in accordance with FAR 42.503. If a conference is deemed necessary, it will be conducted within 30 days of contract award. The Contractor shall be responsible for ensuring that all critical subcontractors participate in the conference. The date, time, and location of the conference will be mutually agreed upon by the Contracting officer, ACO, and the Contractor.
File details come from the government source that posted it. Updated .