This is a Statement of Work (SOW) for shower flooring replacement services at the United States Coast Guard Academy in New London, Connecticut. The contractor must furnish all labor, materials, equipment, and transportation to remove and replace 102 square feet of shower tiles, 58 linear feet of base trim, replace damaged waterproofing membranes, and regrout and caulk affected areas. The finished shower floor must be pitched according to industry standards and manufacturer requirements to ensure positive drainage, with standing water remaining more than 30 minutes after use considered a deficiency requiring corrective action at no additional cost to the government.
The contractor must be licensed by the State of Connecticut and shall designate a primary point of contact with phone number and email address. All work is subject to inspection and acceptance by the Contracting Officer or Technical Advisor (Jason Askew, (571)607-2956, Jason.M.Askew@uscg.mil) during and after completion, with unsatisfactory work corrected at no cost to the government. Work shall be performed Monday through Friday between 7:30 a.m. and 4:00 p.m. local time, excluding Federal Holidays, at the Coast Guard Academy, 15 Mohegan Drive, New London, CT 06320. The contractor must schedule all work with the Technical Advisor, maintain the installation's operational security, remove daily debris and contractor equipment, and dispose of all removed materials offsite in compliance with applicable federal, state, and local regulations. The government will provide electricity (120vac @ 20 amps) and water from existing building services at no cost; additional utilities are the contractor's responsibility.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work United States Coast Guard Academy New London, Connecticut
Part 1 – GENERAL
1.1 Project Description:
The contractor shall furnish all labor, material, equipment, and transportation, change out leaking shower flooring, Coast Guard Academy, New London, Connecticut.
1.2 Contractor Qualifications and Personnel Requirements:
The contractor and contractor personnel performing work under this contractor shall be licensed by the State of Connecticut. The contractor shall provide a primary point of contact to include a phone number and email address.
1.3 Technical Advisor:
All work performed by the contractor is subject to inspection and acceptance by the Contracting Officer or the Technical Advisor during and after the completion of each visit. Unsatisfactory work shall be corrected at no additional cost to the government. The Technical Advisor for site visits and technical support is Jason Askew who may be reached at (571)607-2956 (office) or at Jason.M.Askew@uscg.mil. TA are not authorized to issue changes to the contractor or resolve contractual disputes.
1.4 Location of Work:
All work shall be performed at the Coast Guard Academy, 15 Mohegan Dr, New London, CT 06320.
1.5 Site Visit:
Bidders are encouraged to visit the site to become familiar with existing conditions. Failure to do so will not relieve the successful bidder from furnishing all labor, materials, and equipment to satisfactorily complete performance of all required work. Bidders shall contact the primary TA to schedule a site visit.
1.6 Hours of Work:
All work shall be performed between the hours of 7:30 a.m. and 4:00 p.m. local time, Monday through Friday excluding Federal Holidays. Should the contractor desire to work outside these hours, the contractor shall submit a request to the primary TA no less than 48 hours in advance.
1.7 Scheduling of Work:
The contractor shall schedule all work with the TA.
1.8 Contractor’s Use of Premises:
The contractor will be working within an operational Coast Guard military installation. The contractor shall perform and conduct all work to minimize interference with Coast Guard operations.
1.9 Parking:
The contractor is authorized parking during the performance of work. Overnight parking is not authorized. Parking arrangements shall be made through the TA.
1.10 Inspection and Acceptance of Work:
The contractor shall keep the TA fully informed of contract operations throughout the performance of work. The contractor shall notify the TA upon completion of work. The contractor and TA shall perform a joint final inspection and the contractor shall correct any noted deficiencies.
1.11 Government Furnished Utilities:
The government will furnish electricity (120vac @ 20 amps), and water from existing building services will be provided at no cost to the contractor. Additional hookups or temporary connections shall be the responsibility of the contractor and shall be removed by the contractor upon completion of work.
1.12 Storage Facilities:
The government will not provide storage facilities.
1.13 Site Clean Up:
Upon completion of daily work, the contractor shall remove and properly dispose of site debris and rubbish. Contractor equipment shall be removed from Coast Guard Academy premises unless otherwise authorized by the TA.
1.14 Disposal of Removed Materials:
All materials and equipment removed by the contractor shall become the property of the contractor and shall be disposed of offsite in accordance with all applicable federal, state and local laws and regulations. Under no circumstances shall materials be placed in government-owned or leased refuse containers.
1.15 Smoking:
The contractor shall strictly adhere to the Coast Guard Academy’s smoking policy which limits smoking to 4 designated locations. The TA will provide smoking area locations upon request.
Part 2 – SCOPE OF WORK
2.1 General:
The work associated with this contract includes removing and replacing shower tiles.
102 sq ft tile 58 Liner feet base Replace damaged waterproofing membrane Regrout and caulk all areas affected.
The finished shower floor shall be pitched in accordance with industry standards and manufacturer requirements to ensure positive drainage to the drain. Standing water remaining on the shower floor more than 30 minutes after use shall be considered a deficiency requiring corrective action by the contractor at no additional cost to the Government.