This document is a Statement of Work (SOW) for chapel furniture for the VA Boston Healthcare System located in West Roxbury, Massachusetts. The VA requires new non-denominational furniture for the interfaith chapel to promote an inclusive, safe environment for staff, patients, and visitors.
The SOW includes the scope of work, bid requirements, freight and installation requirements, detailed furniture specifications and minimum technical requirements, and contractor requirements. The required furniture includes console tables, a coffee table, a lectern, and acoustical privacy panels. Bids must be submitted using the provided bid price proposal template. The SOW also includes records management obligations. The associated federal contract opportunity is for a solicitation (RFQ) to procure the chapel furniture, with a set-aside for service-disabled veteran-owned small businesses (SDVOSB). Quotes are due by 4:30pm on 05/16/2023, and the award will be made to the most advantageous response based on evaluation factors including price, past performance, delivery timeframe, and item availability.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24124Q0684.docx | DOCX document | |
| LIT_Chapel_20240419.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Chapel Furniture
April 19, 2024
U.S. Department of Veterans Affairs Boston Healthcare System
1400 VFW Parkway West Roxbury, Massachusetts 02132
STATEMENT OF WORK CONTENTS
I. Justification
II. Scope of Work III. Bid Requirements IV. Freight & Installation Requirements V. Furniture Requirements
VI. Other Considerations for Proposal VII. Contractor Requirements
VIII. Payment Schedule IX. Non‐Personal Services Statement X. Records Management Obligations
XI. Appendix A – Bid Price Proposal
I. JUSTIFICATION
The West Roxbury Campus of VA Boston Healthcare System requires new furniture for the interfaith chapel. The existing furniture does not promote inclusivity due to engraved denominational symbols that only reflect one of many religions. To promote an inclusive, safe environment for staff, patients, and visitors of all religious and spiritual affiliations, we require nondenominational furniture that does not depict any symbolism towards one specific religion.
The product will meet all infection control requirements and help towards creating an environment that promotes individual healing, regardless of religious affiliation.
II. SCOPE OF WORK
The selected Contractor shall furnish, deliver, and install furniture to the VA Boston Healthcare System West Roxbury Campus located at 1400 VFW Parkway, West Roxbury, MA 02132.
The timeframe for delivery receipt shall be no later than 12 weeks following award of contract, with coordination of specific dates mutually agreed upon by the VA Medical Center and the selected Contractor. The selected Contractor shall deliver and install during regular business hours, Monday through Friday, 8:00 AM to 4:00 PM.
No product for this solicitation shall be drop shipped directly to the project site. All deliveries must be coordinated by the selected Contractor to their warehouse and delivered to the West Roxbury Campus at the time of installation. The selected Contractor will be required to coordinate the scheduling for delivery and installation with the VA Interior Designer. A map showing the loading dock location will be provided to the selected Contractor.
The selected Contractor shall provide timely response and assistance on all warranty and service claims made by the VA Medical Center. Proposed manufacturer shall have local representatives within 100 miles to provide on‐site warranty service. The selected Contractor and/or Manufacturer Representative shall perform a site visit for item inspection and review within 5 business days of correspondence from the VA Medical Center requesting warranty or service claim assistance. An action plan shall be submitted by the selected Contractor for all warranty and service claims within two weeks following the initial site visit.
The selected Contractor shall ensure that all owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions and any other information is provided to the Contracting Officer Representative (COR) upon completion of the installation.
III. BID REQUIREMENTS
All bids are to be formatted appropriately to ensure a consistent basis for comparison. A preformatted bid price proposal is included as Appendix A.
Cost of item (as defined below) shall be wholly inclusive of all required components. DO NOT break out costs for any parts, pieces, or COMs in either the cost or extended cost columns.
Comprehensive freight of all items to be indicated as a total amount.
Comprehensive installation of all items to be indicated as a total amount.
Potential contractors shall be solicited on minimum technical requirements. Basis of design provided for layout and aesthetic purposes. All bid submissions shall comply with the minimum technical requirements for each item described herein. Brand name product provided only for sole source requirements. Sole source justification is provided for any brand name product listed.
Potential contractors shall assume one installation, over a maximum of one business day during regular business hours.
REQUIREMENTS FOR OR EQUAL PROPOSAL
If submitting an OR EQUAL, bid manufacturer shall submit the following to the VA COR at the VA Boston Healthcare System West Roxbury Campus within ten days of bid submittal:
Product Data: Submit manufacturer’s product data, storage and handling requirements and recommendations, installation methods and available colors, styles, patterns, and textures.
Data sheets to include picture, make and exact model number, description, cut sheet, price list, and technical information on why substituted item meets SOW requirements.
Shop Drawings: Submit manufacturer’s shop drawings, including plans and elevations, indicating overall dimensions.
Samples: Submit manufacturer’s samples of materials, finishes, and colors.
Warranty: Submit manufacturer’s standard warranty.
If submitting an OR EQUAL bid on seating, vendor must supply a sample for demo to the VA COR at the VA Boston Healthcare System West Roxbury Campus within ten days of bid submittal.
Notification of pending sample submittal due to VA COR within 2 days of bid submittal. The sample will remain onsite for two weeks to undergo a determination of parity for construction quality and end user comfort. Include with the submittal, product information and salient characteristics.
Please direct all samples and submittals to:
ATTN: Aprilyn Arca Building 5, Engineering (138) 1400 VFW Parkway West Roxbury, MA 02132
IV. FREIGHT & INSTALLATION
The selected Contractor shall provide all necessary materials, equipment, labor, supervision, and management to: (1) coordinate pick‐up; (2) load and unload; (3) place/install in designated areas; (4) assemble items as required; (5) secure and store, as designated; and (6) properly dispose of all associated packing/crating materials.
All products shall be installed by manufacturer certified installers. Installation shall be coordinated by the selected Contractor with the designated VA Interior Designer. Loading docks and elevators will be available for installation. VA staff and patients will have priority access over the elevators and the selected Contractor’s time shall accommodate for this. Building hours are 8:00 AM – 4:00 PM. Installation shall be performed during regular hours, Monday through Friday, to be selected and confirmed by the VA Interior Designer. Multiple days of the week must be available for installation.
The selected Contractor shall supply sufficient installation labor to complete the installation in a maximum of 1 business day. The selected Contractor shall inspect all items to ensure that the furniture is free of surface dirt and defects and that the installation is complete, and furniture is ready for use. The selected Contractor shall furnish a written punch list, if necessary, to the VA Interior Designer within 5 business days of installation, along with an action plan for completion.
INSTALLATION CONTACT
VA COR for Delivery and Installation:
VABHS Interior Designer, Aprilyn Arca aprilyn.arca@va.gov
(857) 203‐4013 (office)
(617) 485‐8381 (cell)
The selected Contractor shall contact the designated VA COR at least 2 weeks prior to the date that services are to begin. Pick‐up, delivery, and installation services are expected to be performed per future information. The selected Contractor shall coordinate installation times with the designated VA COR to confirm that the building is ready for furniture. In the event there is a delay in installation, the selected Contractor must notify the designated VA COR immediately.
V. FURNITURE REQUIREMENTS
TB1 – 60” W x 17” D x 28” H Console Table – IDIQ# OT6 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location Basis of Design: OFS Kintra
Model: NSKT‐1078897 – 60” W x 17” D x 28” H Console Table (Custom Width) Finish: EN2 – Toffee
TB2 – 48” W x 17” D x 28” H Console Table – IDIQ# OT6 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location
Model: KT2‐M4817KST – 48” W x 17” D x 28” H Console Table
TB3 – 48” W x 15” D x 28” H Console Table – IDIQ# OT6 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location
Model: NSKT‐1078905 – 48” W x 15” D x 28” H Console Table (Custom Depth)
TB4 – 60” W x 30” D x 36” H Table – IDIQ# DT2 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location
Model: KT2‐M6030KTC – 60” W x 30” D x 36” H Table
Shelf: ZP – No Shelf Power Cutout: QR – No Power Cutout (Standard)
TABLE MINIMUM TECHNICAL REQUIREMENTS:
Above tables shall be part of a collection of occasional, console, and dining tables and to be of a coordinated collection from one manufacturer. Manufacturer shall also have a coordinating lectern that meets the lectern minimum technical requirements listed below.
Tabletop shall be a minimum of 2” thick thermoform laminate (TFL).
Table shall have mitered construction with two full end panels that align with the edge of the tabletop. Four leg or pedestal bases are not acceptable base solutions.
Table shall be available in a woodgrain laminate that coordinates with Samuelson Furniture’s 201 Light Walnut finish. Tabletop and end panels shall be available in woodgrain laminate with matching edges. All sides shall be finished. Exposed particle board is not acceptable.
Table shall be SCS Indoor Air Advantage Gold and BIFMA Level 2 Certified, or equal.
Table shall meet all applicable BIFMA and ANSI standards.
Minimum 12‐year, 24/7 manufacturer’s warranty.
TB5 – 36” Round Coffee Table – IDIQ# OT3 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location Basis of Design – Arcadia Ovate
536‐3616‐CO: 36” Dia. x 16” H Ovate Round Table, Wood Body, Corian Top Top Finish: Corian – Witch Hazel Wood Finish: #12 – Natural Beech NS04: Non‐Skid Glides
OCCASSIONAL MINIMUM TECHNICAL REQUIREMENTS:
Table shall be transitional in appearance.
Table shall be round and ±36” Dia. x ±16” H
Tabletop shall have ±½” Solid Surface top – Corian, or equal, with Witch Hazel finish option available to match existing finishes.
Table frames shall be constructed of solid hardwoods, with a woodgrain finish to match Arcadia #12 Natural Beech to match existing finishes.
Joinery shall be of a mortise and tenon construction, or equal.
Legs shall be solid wood and taper to ±1” x 1” at the bottom.
Table shall be from a coordinated seating line.
Table shall have a minimum 10‐year warranty.
Collection shall be SCS Indoor Advantage Gold Certified, or equal.
TB6 – 27” W x 22” D x 43 ¼” H Lectern – IDIQ# CH1 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location Basis of Design: OFS Applause
Model: A2743LE – 27” W x 22” D x 43 ¼” H Lectern Material: T – TFL or HPL Top Finish: TFL Top Finish, TFL: EN2 – Toffee Column/Paper Stop Finish: H1P – Oiled Bronze Foot Finish: H1P – Oiled Bronze Caster Finish: A4G – Black Casters
LECTERN MINIMUM TECHNICAL REQUIREMENTS:
Lectern shall be of a coordinated collection from one manufacturer with tables TB1 – TB4.
Lectern size to be approximately ±27” W x ±22” D x ±43 ¼” H.
Lectern shall have a paper stop.
Lectern shall be mobile with a 4‐star base with casters with minimum two locking casters.
Lectern top shall be available in a woodgrain laminate that coordinates with Samuelson Furniture’s 201 Light Walnut finish with matching edges. Lectern base shall be available in a minimum of (10) painted finishes, with at least five neutrals ranging from light to dark finishes.
Lectern shall be SCS Indoor Air Advantage Gold and BIFMA Level 2 Certified, or equal.
Lectern shall meet all applicable BIFMA and ANSI standards.
Minimum 12‐year, 24/7 manufacturer’s warranty.
PP1 – Acoustical Privacy Panel System with Door – IDIQ# MSP1 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location Basis of Design: Herman Miller Action Office Series 1 – Tackable Acoustic Panel
AO125: Tackable Acoustical‐Barrier Panel 62: 62” High 42: 42” Wide WL: Sandstone Trim/Top Cap Finish Price Category 1: Dex Stone 3DE103
AO210: Wall Start 62” 62” High WL: Sandstone
AO215: Draw Rod 62: 62” High
AO271: Finished End 62: 62” High H: Standard WL: Sandstone
Panel Typical A – Qty. 2
SCALE: NOT TO SCALE
PANEL TYPE (as indicated next to panel text)
Panel Type A
SCALE: NOT TO SCALE
PANEL SYSTEM MINIMUM TECHNICAL REQUIREMENTS:
Shall be a freestanding panel with connections at the wall. No power needed.
Shall not exceed 42” W x 62” H.
Full panel surface shall be tackable surface in a bleach‐cleanable fabric.
Panel trim shall include multiple painted color options, including a minimum of 3 neutral tones (white, gray, beige).
Panel shall be monolithic in appearance.
Panel trim shall be provided in painted finish for all end‐of‐run applications. These trim conditions shall be full height applications.
Lines should offer Contemporary, Transitional or Traditional design element options.
Freestanding products must meet or exceed the minimum fire code ratings as applicable to each project and in accordance with ASTM E‐84.
Product lines shall be unitized in construction and flexible for reconfiguration.
All products shall carry a minimum 10 year, 3‐shift parts warranty. Limitations or exclusions involving materials and components such as upholstery fabric are acceptable.
Panels and framework shall be unitized (not stick built), and non‐progressive to allow for flexible reconfiguration including the removal or relocation of panels on the same module.
Panels shall be a minimum of ±2” thick, shall have panels widths available between 12”
– 60” with 1/16” minimum nominal widths available. Panel heights shall be available up to 80” H.
Each panel shall have integrated leveling devices and have a minimum 1” of adjustability at the floor.
Panels shall have no more than a ¼” reveal between adjacent panels.
Acoustical Walls shall achieve a minimum 0.35 NRC.
o STC = Sound Transmission Coefficient o NRC = Noise Reduction Coefficient
Minimum 12‐year, 3‐shift manufacturer warranty.
AC1 – 36” W x 24” H Magnetic Dry Erase Board – IDIQ# DC2 Reference Appendix A – Bid Price Proposal & Appendix B – Furniture Floor Plan for Quantity and Location Basis of Design – Egan Aluminum Frame Markerboard
MES2436: 24” H x 36” W Magnetic Markerboard W: Wall Mount Options: EVS Surface *Marker holder, markers, and eraser to be included with EACH board *Include all required hardware for installation
DRY ERASE BOARD MINIMUM TECHNICAL REQUIREMENTS:
Boards shall be at or less than 0.81” thick in a thin aluminum frame with an integrated tray for marker/eraser storage.
Boards shall be installed via Z‐clips using an interlocking hanging mechanism. Boards shall hang flush to the wall. Installation via adhesive is NOT acceptable.
Boards shall be stain, ghost, and scratch resistant with low gloss/glare. EVS technology or equal.
Boards shall accept magnetic accessories.
Boards shall include markers and erasers for EACH board.
Boards shall include all required hardware for installation.
Boards shall be GreenGUARD Certified.
Boards shall have a minimum 10‐year warranty.
Boards shall be made with sustainable sourcing and manufacturing process meeting BIFMA Level requirements or equal.
VI. OTHER CONSIDERATIONS FOR PROPOSAL
The selected Contractor shall be responsible for any damage to building walls, doors, or windows during delivery. The selected Contractor shall furnish and install all supplementary or miscellaneous items, appurtenances, and devices incidental to or necessary for sound, secure, and complete installation. The selected Contractor shall provide complete coordination of all product delivery and installation and provide competent supervision personnel.
VII. CONTRACTOR REQUIREMENTS
The selected Contractor shall perform all work under this contract in strict accordance with all safety codes to eliminate the possibility of damage or injury to personnel, equipment, and building structures.
Scope of work to include, but not limited to, provision of furnishings, delivery, and installation.
Furniture layout shall meet the requirements and design intent of ABA, NFPA, OSHA, ANSI, BIFMA, CAL 117, VA, for all accessibility, life safety, occupational safety, VA, and federal requirements for a business, healthcare, or residential occupancy, as applicable.
Track all orders to ensure timely delivery and communicate issues to VA Interior Designer.
Furniture delivery not to interfere or disturb other tenants in the building or the operation of the facility. The selected Contractor will coordinate the work of the project with the VA Interior Designer.
Upon delivery of goods, the selected Contractor shall unload at the loading dock with permission of building management. Please contact the VA Interior Designer for scheduling.
Provide final cleaning of products prior to project completion.
Provide furniture cut sheets, warranty, and delivery schedule. The selected Contractor shall provide O&M manuals including warranty, care, and manufacturer contact information to VA Interior Designer at completion of project. VA Interior Designer to provide digital format for O&M manual.
Freight all furniture in an environmentally responsible manner, i.e., blanket wrapped or equal, when available. Remove and recycle or discard all packaging materials in an environmentally responsible manner.
Repair or replace damaged products at the discretion of the VA Interior Designer.
Final layout to be determined by the VA Interior Designer.
Responsible for containing any rubbish/waste generated by the work force or material delivery at the end of each day.
All waste to be removed and disposed of by the selected Contractor daily.
VIII. PAYMENT SCHEDULE
The selected Contractor shall bill on completion and acceptance of the work.
IX. NON‐PERSONAL SERVICES STATEMENT
Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the SOW. Contractor employees will perform their duties independent of, and with occasional supervision of VA COR. The tasks, duties, and responsibilities set forth in the SOW may not be interpreted or implemented in any manner that results in any contractor creating or modifying Federal policy, obligating the appropriate funds for the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating contracting regulation.
REPORTING REQUIREMENTS: The Contractor shall be required to report to the Police Office to check in. This check‐in is mandatory. When the service is completed, the FSE shall document services rendered on a legible ESR(s). The FSE shall be required to check out with Engineering and submit the ESR(s) to the COR or designated representative. ALL ESRs shall be submitted to the equipment user for an "acceptance signature" and to the COR or designated representative for an "authorization signature". If COR or designated representative is unavailable, a signed, authorized copy of the ESR will be left with the user.
IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS: The Contractor's FSE's shall wear visible identification at all times while on the premises of the VAMC. The Contractor shall park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VAMC will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited on all VAMC property. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search.
Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
SECURITY REQUIREMENTS: All contractor personnel shall obtain a short‐term identification badge issued by the COR or designated representative. Such badge shall be worn by the individual and prominently displayed at all times while on VA Property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. In order to obtain a short‐term identification badge, contractor personnel shall present to the COR a valid (non‐expired) photo identification issued by a US federal, state or local government agency. Escort will be provided as required in sensitive work areas.
X. RECORDS MANAGEMENT OBLIGATIONS
A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions
“Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them. The term Federal record:
1. Includes [Agency] records
2. Does not include personal materials
3. Applies to records created, received, or maintained by Contractors pursuant to their
[Agency] contract
4. May include deliverables and documentation associated with deliverables
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. [Agency] and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230.
5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non‐public information is limited to authorized personnel with a need‐to‐know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub‐contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub‐contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with [Agency] policy.
8. The Contractor shall not create or maintain any records containing any non‐public [Agency] information that are not specifically tied to or authorized by the contract.
9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
10. The [Agency] owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S.
Government for which [Agency] shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227‐11 through FAR 52.227‐20.
D. Flowdown of requirements to subcontractors
1. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.
2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
XI. APPENDIX A: BID PRICE PROPOSAL
See next full page for Appendix A.
XII. APPENDIX B: FURNITURE PLAN
See next full page after Appendix A for Appendix B.
APPENDIX A
VA Boston Healthcare System BID PRICE PROPROSAL Chapel Furniture 19 April 2024
TYPE ITEM DESCRIPTION QUANTITY COST EXTENDED NOTES
TB1 60" W x 17" D x 28" H Console Table 1 IDIQ# OT6 TB2 48" W x 17" D x 28" H Console Table 1 IDIQ# OT6 TB3 48" W x 15" D x 28" H Console Table 1 IDIQ# OT6 TB4 60" W x 30" D x 36" H Table 1 IDIQ# DT2 TB5 36" Dia. X 16" H Round Coffee Table 1 IDIQ# OT3 TB6 27" W x 22" D x 43 1/4" H Lectern 1 IDIQ# CH1 PP1 42" W x 62" H Privacy Panel 2 IDIQ# MSP1 AC1 36" W x 24" H Dry Erase Magnetic Board 3 IDIQ# DC2
Delivery/Installation SLA Fee
Total
INTERFAITH
CHAPEL
GD-122
SACRISTY
GD-122A
CHAPLAIN
OFFICE
GD-125
OIT SUPERVISOR
OFFICE
GD-126A
TB4
AC1
AC1
PP1
PP1
TB1
TB2
TB3
TB6
TB5
AC1
TB1
AC1
PP1
- 60" W x 17" D x 28" H Console Table
- 36" W x 24" H Dry Erase Magnetic Board
- 42" W x 62" H Privacy Panel
TB2
TB3
TB4
TB5
TB6
- 48" W x 17" D x 28" H Console Table
- 48" W x 15" D x 28" H Console Table
- 60" W x 30" D x 36" H Table
- 36" Dia. x 16" H Round Coffee Table
- 27" W x 22" D x 43 1/4" H Lectern
VA BOSTON
ENGINEERING
Drawing Number
Project No.
Drawing Title
Location
Project Name
Building Number Date Drawn Scale As indicated
4/
/2
0:
:5
A M
AF101.5FURNITURE PLAN
23-08
WEST ROXBURY VA MEDICAL CENTER
INTERFAITH CHAPEL RENOVATION
01 04/19/24 AA
1/2" = 1'-0"
1 FURNITURE PLAN
LEGEND:
APPENDIX B
| SOW_Chapel Furniture_20240419 |
| Appendix A_Bid Price Proposal_20240419 |
| Appendix B_Chapel Furniture Plan_20240419 |
| Sheets |
| AF101.5 - FURNITURE PLAN |
File details come from the government source that posted it. Updated .