SOW CESU 18-01 MGT HABITAT GRASS HGT TEST JBMDL 14DEC2017.pdf

PDF 138 KB Posted

Attached to
JBMDL GRASS HEIGHT MGMT
Opportunity number
NWO-CESU-18-1
Issued by

About this file

SOW

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

For

NATURAL RESOURCES SUPPORT

JOINT BASE MCGUIRE-DIX-LAKEHURST, NJ

MGT, HABITAT, GRASS HEIGHT TESTING

CESU 18-01

Projects for execution under this Cooperative Agreement (CA) by the U.S. Army Corps of Engineers (USACE) do not include any functions to be performed that are inherently governmental. This determination is made with the assessment that places emphasis on the degree to which conditions and facts restrict the discretionary authority, decision-making responsibility, or accountability of Government officials using Non-Federal Entity (NFE) services or work products.

This CA shall not be used for performance of personal services. These tasks provided by the customer for execution under this CA by USACE do not include functions to be performed that are personal services.

Any modifications to Cooperative Agreement activities as outlined by this SOW must be channeled through the Grants Officer’s Technical Representative (GOTR) and Grants Officer (GO) prior to NFE implementation.

NFE personnel shall also wear a distinctive NFE furnished security (ID) badge/lanyard readily identifying the individual as a NFE employee. The badge shall be worn in a conspicuous place at all times when performing work under the Cooperative Agreement including attendance at Government meetings and conferences that take place outside of the Government facility.

NFE personnel shall identify themselves as an NFE employee when answering or placing calls on a Government telephone and when leaving outgoing or incoming messages on voice mail.

Use of acronyms in this identification is insufficient to meet this requirement.

All NFE email signatures shall identify them as such and will include their employer’s name.

PERIOD OF PERFORMANCE: 18-months from date of award.

GOVERNMENT POCS:

1. USACE Omaha District POC: Ms. Sarah Miller PM, (402) 995-2625, sarah.miller@usace.army.mil

2. USACE Omaha District POC: Ms. Kali Evans, GOTR, (402) 995-2295, kali.l.evans@usace.army.mil

3. USACE Omaha District POC: Ms. Stephanie Rostermundt, Grants Officer, (402) 995- 2083, stephanie.a.rostermundt@usace.army.mil

This statement of work addresses the following tasks:

PROJECT

NUMBER

TITLE LOCATION

PTFL18NR09 MGT, HABITAT, GRASS HEIGHT TESTING JBMDL AFB

1.0 PROJ# PTFL18NR09 MGT, HABITAT, GRASS HEIGHT TESTING

1.1 Task Order Objective:

The Sikes Act, enacted in 1960, requires the Department of Defense (DoD) to develop and implement Integrated Natural Resource Management Plans (INRMPs) for all military bases within the United States. Implements approved Joint Base McGuire-Dix-Lakehurst’s (JBMDL) INRMP goals Project 8.10.1.2.4, as well as 8.1.1. Manage Fish and Wildlife, 8.1.2, State Listed Species, and meets the requirements of Air Force Instruction 32-7064. The Air Force’s Project PTFL18NR09 contributes to JBMDL’s INRMP goals and objective 8.10.1.2 - Prevent Flocking Birds from Nesting near Airfields.

1.2 Task:

The tasks for this project consist of conducting avian surveys on test runway plots for grassland bird occupation, specifically the New Jersey’s listed threatened and endangered species grasshopper sparrow and upland sandpiper. Bird surveys will be conducted on 300 acres using alternately mowed 30-acre blocks of 7-14 inch grass height and winter mowed grass. A maximum of 10 blocks shall be created. Specific areas will be mapped and priorities will be determined by JBMDL Natural Resources staff at the kick-off meeting. The NFE shall coordinate with JBMDL Natural Resource Manager or their designee. The NFE shall conduct at least six surveys using two transects per block from May 15 through July 10.

1.3 Schedules and Monthly Progress Reports; Deliverables:

The NFE shall provide electronic copies for review and approval to the USACE GOTR, and the JBMDL Natural Resource Manager, Air Force Installation Support Section (ISS).

1. The NFE shall provide monthly bird survey reports (Memo in Word and .pdf, electronically submitted.).

2. The NFE shall provide an annual accomplishment report (Memo in Word and .pdf, electronically submitted.) that shall consist of the following: quarterly accomplishments and quarterly funding charges.

3. The NFE shall submit schedules and SF-PPR quarterly progress reports summarizing activities as follows:

Meetings attended including purpose/objective and attendees Action items, support, and taskers accomplished Percentage of work complete as compared to this SOW

File details come from the government source that posted it.