PEFORMANCE WORK STATEMENT

Title: USS Lewis B. Puller (ESB-3)

Contract: N3220520Q2160 Requisition: N4103800224002

1.0 SCOPE OF WORK:

1.1 This performance work statement describes the requirement for the contractor to perform a variety of repairs during the Puller’s VR period in UAE

1.2 References: Applicable technical manuals to be provided upon request.

1.2.1 SIDUS service quote 603451, 1 April 19

1.2.2 SIDUS installation and service manual available upon request

2.0 SPECIFIC TASKS:

2.1 Upon this task order, the Contractor shall provide parts and perform the following repairs and services. The ship’s crew will stand by as needed to allow the SIDUS rep to perform needed tests.

2.1.1. SIDUS security system Survey

Perform repairs, system groom, and operational test and survey of SIDUS security camera system

2.1.2. Known Discrepancies, Troubleshoot and Repair

The ship’s crew reports the following discrepancies:

(a) Video distribution servers unable to communicate with cameras and monitors

(b) 2 Pan and Tilt cameras do not power on

(c)2 fixed cameras do not power on
(d)Video server configuration does not match installed settings

Provide troubleshooting and repair services to correct the known discrepancies listed above. Perform a grooming of the system as needed to ensure it operates normally.

2.1.3 Demonstrate operable CCTV system

Demonstrate operation of the CCTV system in the presence of the ship’s Chief Engineer, Combat Systems Officer, and both technical points of contact listed in paragraph 6.

3.0 DELIVERABLES:

3.1 The contractor shall provide the following deliverables:

3.1.1 Provide a report detailing conditions found and work performed including photographs and all other aids needed. Fully describe repair actions taken. Include recommendations for future maintenance on any associated systems.

4.0 PERFORMANCE LOCATION:

1) UAE

5.0 PERFORMANCE PERIOD:

From 15 June 2020 to 23 June 2020 for two engineering field technicians.

6.0 TECHNICAL POINT OF CONTACT:

N/A

7.0 ADDITIONAL INFORMATION:

1) Actual time required to perform is estimated. The additional time onboard will be the subject of a contract change.