Cabinets and Countertops Installation plus Option #1 Janitor Closet Renovation CCF Atlanta (ZTL) ARTCC, Hampton, GA
Solicitation number
697DCK23R00089
Issued by

About this file

This solicitation is seeking proposals for cabinets and countertops installation and optional janitor closet renovation at the Child Care Facility Atlanta Air Route Traffic Control Center in Hampton, Georgia. The Federal Aviation Administration requires replacement of cabinets, countertops, sink casings and optional janitor closet renovation. The NAICS code is 236220 with a $45 million size standard. The price range for this requirement is $250,000 to $500,000 and payment and performance bonds are required. A mandatory site visit will take place on February 9, 2023. Proposals are due based on the request for offer and any amendments posted on the website. This is a 100% small business set-aside solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILD CARE CENTER REPLACE CABINETS AND COUNTERTOPS

ATLANTA, GEORGIA (ZTL) AIR ROUTE TRAFFIC CONTROL CENTER

AUGUST2022

FAA-ZTL-1705138

F. Precedence of Contract Documents - In the event of a difference between the following contract provisions, the order of precedence to determine which provision shall govern is:

1. Contract Clauses and Provisions

2. Project Specifications

3. Project Drawings

Any discrepancies between the contract provisions, the specifications and the contract drawings shall be referred to the CO for a written determination in accordance with Contract Clause entitled Order of

Precedence.

G. Contracting Officer -The term "Contracting Officer" (CO) as used herein denotes the person designated to act on behalf of the Government in the performance of this contract. Where reference is made to "Federal Aviation Administration" (FAA), "Resident Engineer" (RE), "Contracting Officer's

Representative" (COR), or the like, this shall mean the Contracting Officer or his/her authorized representative.

H. Contractor Superintendence - In accordance with Contract Clause entitled SUPERINTENDENCE BY

THE CONTRACTOR, the Contractor shall at all times during performance of this contract and until the work is completed and accepted, directly superintend the work or assign and have on site a competent superintendent with the authority to act for the Contractor.

The Contractor shall submit a Project Organizational Chart with the key personnel identified and their qualifications for the Government's review and approval.

1.2 SPECIAL REQUIREMENTS

A. Asbestos Containing Materials. - No new materials supplied by the contractor for this construction shall contain asbestos or lead-based products. The contractor shall verify that all materials, including those supplied by third parties, are asbestos free and/or lead-based free materials.

1. Contractor certification requirements. - The contractor shall provide to the Contracting

Officer (CO) a signed and notarized document stating that to the best of his/her knowledge, no asbestos containing or lead-based materials were used during the construction, renovation, and/or modernization of this facility as stated in AMS clause 3.6.3-12

ASBESTOS - FREE CONSTRUCTION (APR 2017)

2. Material Safety Data Sheets. - The contractor shall submit Material Safety Data Sheets

(MSDS) with all submittals for review and approval by the Contracting Officer

Representative. Copies of all MSDS sheets shall be provided to the facility FAA personnel for the building records. The contractor shall comply with all health and safety provisions outlined in each MSDS and shall follow all OSHA guidelines regarding personnel protection.

3. Hazardous materials.- If the FAA RE suspects the presence of asbestos or lead-based products in the new materials, the FAA will sample the suspect material to verify that no asbestos containing material or lead-based material were used. If these materials are found to contain asbestos or lead-based products, the cost of the survey and all subsequent removal/replacement of any hazardous materials shall be at the contractors' expense.

B. Work plan and scheduling. - Prior to the Contracting Officer issuing the Notice To Proceed (NTP), the contractor shall submit for approval a plan and schedule of his work. This schedule shall include all of the requirements as defined in Section 01042 of this specification.

SUMMARY OF WORK 01010- 2