SOW - C295 VLS Support Draft.pdf

PDF 797 KB Posted

Attached to
MK-41 Vertical Launch System (VLS) Repair and Refurbishment
Solicitation number
N5005425R0001-SS
Issued by

About this file

This document is a Statement of Work (SOW) for the repair and refurbishment of MK-41 Vertical Launch Systems (VLS) on U.S. Navy and other military vessels. The contractor shall provide management, technical support, labor, material, equipment, and facilities to perform this work. Repair actions may be required to be performed shipboard or at contractor facilities within a 50-mile radius of Naval Station Norfolk, Norfolk, VA, and potentially elsewhere including OCONUS. The contractor shall identify repair requirements, submit Condition Found Reports, and implement repairs and refurbishment as directed by the government. Key personnel and facility requirements are specified, and the contractor must comply with various NAVSEA Standard Items, Local Work Templates, and Standard Work Templates.

The related federal contract opportunity is a pre-solicitation for MK-41 VLS repair and refurbishment services, with a NAICS code of 336611 (small business size standard of 1,300 employees). The anticipated period of performance is one base year and four option years, commencing around June 2025. Interested parties are requested to submit a capabilities statement package addressing relevant experience, resources, management approach, and security clearance capabilities. This is for market research purposes only and does not constitute a solicitation or offer.

View the file

Other files

File Type Posted
Sources Sought Addendum 1.pdf PDF
Sources Sought - C295 VLS Support.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Descriptions and Specifications

STATEMENT OF WORK

1. SCOPE OF WORK

a. The Contractor shall furnish the necessary management, technical support, labor, material, equipment, and facilities to accomplish repair and refurbishment of MK-41 Vertical Launch Systems (VLS) on board U.S. Navy and/or other military type vessels.

b. A Delivery Order (DO) will normally consist of a single requirement. Multiple delivery orders will be issued for emergent requirements. Emergent requirements are detailed as any work item that must be completed within 60 business days. The contractor may be required to respond to more than one requirement (simultaneous delivery orders for more than one vessel).

c. The contractor shall perform the repairs ordered by the issuance of delivery orders from the Contracting Officer. When ordered, the repairs shall be in accordance with the requirements outlined in this contract. Repairs shall be performed shipboard or at contractor facilities within a 50-mile radius of Naval Station Norfolk, Norfolk, VA.

Under normal conditions, work shall be accomplished at the contractor’s facilities.

Additionally, performance of work may be required elsewhere including OCONUS. In the event work is required outside of the 50-mile radius of Naval Station Norfolk, Norfolk, VA, travel and per diem shall be paid in accordance with Joint Travel Regulations (JTR). The rules in the Federal Acquisition Regulations §31.205-46 govern Government contractor and contractor employee travel costs dated Jan 1, 2018.

d. Required reports and documentation shall be compatible with current Government software applications. (Example: MS Office 2016)

2. DEFINITION OF REPAIR REQUIREMENTS

a. The contractor shall be required to identify repair requirements. When required, these efforts will include but are not limited to the following: inspect equipment and/or systems to determine repair options, repair alternatives, and make recommendations to the Contract Specialist.

b. In some cases, the Government on-site VLS Subject Matter Expert (SME) will confirm the repair options and requirements with the contractor prior to a report being submitted.

For conditions that impact the schedule, the contractor shall notify the government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR) but must include a description of the condition/deficiency and an estimated timeframe for the offeror’s professional recommendation for resolution, which shall not exceed five (5) days as specified below.

c. Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR in accordance with the instructions below:

1) NOTIFICATION TO GOVERNMENT:

CFRs shall be submitted to the Contract Specialist within five (5) working days of discovery of the condition.

2) CFR REQUIREMENTS:

At a minimum, the CFR will include the following:

Identify contract, DO, Ship and hull number

Serialized by the CFR number

Identification of the applicable Work Item number

Date requirement was discovered

Description of the work requirement

Specific location of the work

Recommendation for corrective action

Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future Chief of Naval Operations (CNO) or Continuous Maintenance Availability (CMAV). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.

Identification of related changes, if any, to the internal milestones and production and contract completion dates.

3. GOVERNMENT REVIEW AND RESPONSE TO CFR

a. The Contract Specialist shall review the CFR for accuracy. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to 5-day requirement). As appropriate, the Government and contractor will need to meet to conduct ship checks and/or discuss the recommendation for corrective action to further determine the full scope of work required prior to final approval of the CFR. The contractor's accuracy reflected in the CFRs submitted may be evaluated in Contractor Performance Assessment Reporting System (CPARS).

b. Repair Implementations. After CFR approval and as directed by either technical direction or contract delivery order modification the contractor shall implement repairs/refurbishment, maintenance, renewal and evaluation for the MK-41 VLS on naval ships and shore-based activities. The contractor effort shall include, but is not limited to, the following:

1) Conduct ship visits to coordinate schedules for VLS fleet technical support, inspections, repairs, equipment removal for repair, and refurbishment or replacement.

Repair actions shall include the removal and reinstallation of all interferences.

2) Correct deficiencies identified during ship visits and/or surveys when authorized by the individual delivery order.

3) Provide journeymen level mechanics, technicians, and when required in the delivery order, the In-Service Engineering Agent (ISEA) or Original Equipment Manufacturer (OEM) representatives to accomplish repairs. Repair efforts on short notice may be required and may require work efforts to continue around the clock, including weekends and holidays, until completed.

4) Provide subcontracting capabilities, administration, and management to accomplish repairs that may require highly specialized skills beyond the contractor’s internal workforce.

5) Submit completion inspection reports to the cognizant SME after all repair and/or replacement actions have been accomplished.

6) Provide Quality Assurance Inspections and Certifications for all repair actions accomplished in accordance with this contract and standard industry practices.

7) Repair and refurbishment work efforts shall be conducted at locations specified in each delivery order.

8) During the ship visits, the contractor shall work closely with the on-site VLS SME to expeditiously fulfill planned or emergent work (emergent work as defined in paragraph 1.b requirements. The contractor shall keep the Government fully informed of the status of work on a weekly basis via email to the cognizant SME and Contracts department.

9) Coordinate with on-site VLS SME and ship’s force when crane support is required.

10) Provide written report of all work performed, delays of work and test documentation results to the COR after confirmation from the on-site VLS SME.

c. Except as otherwise provided in this contract, or delivery orders issued thereunder, the contractor shall provide all material, labor, repair support, equipment, supplies, power, accessories, rigs, test equipment, facilities and such other things and support as necessary for accomplishing assigned requirements.

4. PERSONNEL

a. The contractor shall be responsible for the employment of trained and technically qualified personnel to perform delivery orders. The contractor, upon request of the Government representative shall produce the qualifications of an individual to substantiate qualifications to perform the requirement. In addition, the contractor is responsible for employing and maintaining the personnel, organizational and administrative controls necessary to ensure that performance meets or exceeds all contract specification requirements hereunder and as set forth in each individual delivery order.

5. ORGANIZATION

a. The contractor shall have a management organization with the experience and comprehensive understanding to apply management techniques, methods and procedures required to efficiently complete the requirements of the solicitation.

6. REFERENCES

a. In performing the requirements of this contract, the contractor shall comply with all the following references and attachments (Section J) to this solicitation.

b. The following Category I and II NAVSEA STANDARD ITEMS (NSI) may be viewed on the Internet at https://www.navsea.navy.mil/Home/RMC/CNRMC/Our- Programs/SSRAC/NSI/ and shall be invoked on all delivery orders:

FY-23

ITEM NO.

TITLE UTILIZATION

CATEGORY

DATE

009-01 General Criteria I 01 OCT 2023

009-02 Environmental Compliance Report for Material Usage

I 01 OCT 2023

009-03 Toxic and Hazardous Substance; control I 01 OCT 2023

009-04 Quality Management System; provide I 01 OCT 2023

009-05 Temporary Access II 01 OCT 2023

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish

I 01 OCT 2023

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish

I 01 OCT 2023

009-08 Shipboard Fire Protection and Fire Prevention;

accomplish

I 01 OCT 2023

009-09 Process Control Procedure (PCP); provide and accomplish

II 01 OCT 2023

009-11 Insulation and Lagging; accomplish II 01 OCT 2023

009-12 Weld, Fabricate, and Inspect; accomplish II 01 OCT 2023

009-13 Meter, Gage, Switch, and Thermometer; repair II 01 OCT 2023

009-16 Electronic Equipment; repair II 01 OCT 2023

009-19 Provisioning Technical Documentation (PTD);

provide

I 01 OCT 2023

009-20 Government Property; control I 01 OCT 2023

009-21 Alteration Verification, Logistics and Technical Data; provide

I 01 OCT 2023

009-23 Interference; remove and install I 01 OCT 2023

009-24 Authorization, Control, Isolation, Blanking, Tagging and Cleanliness; accomplish

I 01 OCT 2023

009-25 Structural Boundary Test; accomplish II 01 OCT 2023

009-26 Deck Covering; accomplish II 01 OCT 2023

009-32 Cleaning and Painting Requirements II 01 OCT 2023

009-36 Controller; repair II 01 OCT 2023

009-37 General Procedure for Woodwork; accomplish II 01 OCT 2023

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component;

accomplish

I 01 OCT 2023

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

I 01 OCT 2023

009-45 Tapered Plug Valve; repair II 01 OCT 2023

009-46 Butterfly Valve, Synthetic and Metal Seated;

repair

II 01 OCT 2023

009-47 Gate Valve; repair II 01 OCT 2023

009-48 Pressure Seal Bonnet Valve Shop Repair;

accomplish

II 01 OCT 2023

009-49 Pressure Seal Bonnet Valve In-line Repair;

accomplish

II 01 OCT 2023

009-50 Horizontal Swing Check Valve; repair II 01 OCT 2023

009-52 Relief Valve; repair II 01 OCT 2023

009-53 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve Shop Repair; accomplish

II 01 OCT 2023

009-54 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve In-line Repair; accomplish

II 01 OCT 2023

009-55 Regulating/Reducing Valve; repair II 01 OCT 2023

009-61 Shipboard Use of Fluorocarbons; control I 01 OCT 2023

009-63 Lubricating Oil and Hydraulic Fluid; analyze II 01 OCT 2023

009-65 Polychlorinated Biphenyls (PCBs); control II 01 OCT 2023

009-67 Integrated Total Ship Testing; manage I 01 OCT 2023

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention, and Housekeeping for Unmanned Vessel; accomplish

009-71 Piping System; test II 01 OCT 2023

009-72 Physical Security at a Private Contractor Facility; accomplish

I 01 OCT 2023

009-73 Shipboard Electrical/Electronic

Cable Procedure; accomplish

I 01 OCT 2023

009-74 Occupational, Safety and Health Plan;

accomplish

I 01 OCT 2023

009-75 Circuit Breaker; repair II 01 OCT 2023

009-78 Passive Countermeasures System (PCMS) Material; repair

II 01 OCT 2023

009-79 Government Owned Material (GOM) Status for Multi-Ship Multi-Option availabilities; report

II 01 OCT 2023

009-80 Ship Facilities; maintain I 01 OCT 2023

009-81 Compartment Closeout; accomplish I 01 OCT 2023

009-82 Installation of Equal Component

Vice Specified Component; report

I 01 OCT 2023

009-83 Wire Rope Assembly; fabricate II 01 OCT 2023

009-84 Threaded Fastener Requirements; accomplish I 01 OCT 2023

009-85 Government Sponsored Planning Yard/Configuration Data Manager (CDM) On- Site Representative Facility; provide

II 01 OCT 2023

009-86 Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish

II 01 OCT 2023

009-87 Chemical Disinfection Procedure; accomplish II 01 OCT 2023

009-93 Emergency Planning and Community Right-to- Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

I 01 OCT 2023

009-95 Mechanically Attached Fitting (MAFs); install II 01 OCT 2023

009-96 Ball Valve; repair II 01 OCT 2023

009-100 Ship's Stability; maintain I 01 OCT 2023

009-103 Weight and Moment Change Data; provide II 01 OCT 2023

009-105 Thermal Sprayed Coating for Machinery Component Repair; accomplish

II 01 OCT 2023

009-106 Work Authorization Form Coordinator (WAFCOR); provide

009-117 Combat Systems Light-Off Support; provide I 01 OCT 2023

009-118 CG Deck Loading; accomplish I 01 OCT 2023

009-120 Fact Finding and Critique of Unplanned Event;

manage

I 01 OCT 2023

009-121 Ship Assessment/Inspection; accomplish II 01 OCT 2023

009-122 Temporary Padeye; install and remove I 01 OCT 2023

009-123 Fiber Optic Component; remove, relocate, repair, and install

II 01 OCT 2023

c. The following LOCAL WORK TEMPLATE (LWT) will be provided as an attachment and will be invoked on individual delivery orders as required:

• 042-037 General Requirements for Work Within Naval Station Norfolk; accomplish (Attachment J-3) 08 APR 2024.

d. The following STANDARD WORK TEMPLATES (SWTs) shall be invoked on individual delivery orders as required:

• 042-001 Accountability of Man-hour and Material Reservation; accomplish (Attachment J-4) 14 MAR 2024.

• 077-001 Hazardous Waste Produced on Naval Vessels; control (Attachment J-5) 30

NOV 2023.

NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked. Additionally, in the event that there is any conflict between the references, NSIs, LWTs, and SWTs take precedence over technical manuals, specifications, and other references. NSIs take precedence over LWTs and SWTs.

Other tiered drawings shall be followed when referenced.

7. POST-AWARD SUBMISSION

After receipt of a Delivery Order Award and prior to starting work onboard the vessel, the contractor shall submit a Visit Authorization Letter (VAL) in accordance with SECNAV M-5510.30 (Dept. of the Navy, Personnel Security Program), and/or DOD 5220.22M (National Industrial Security Program Operating Manual), to the Commanding Officer of the ship via the Mid-Atlantic Regional Maintenance Center (MARMC) Security Officer.

NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked.

8. MINIMUM CAPABILITIES AND FACILITY REQUIREMENTS

a. MINIMUM CAPABILITIES

Offerors shall provide evidence of Vertical Launch System certification or the intent for VLS certification. The intent for VLS certification will be considered equivalent to VLS certification and shall be demonstrated by completing and submitting an application, with all required documentation, as defined by NAVSEA Instruction 8394.2G.

Applications shall be approved by IWS 3L and NSWC Port Hueneme (E50).

b. FACILITY REQUIREMENTS

The successful offeror shall have sufficient facilities in appropriate locations to fully support the work intended by this contract. The offeror’s facilities shall be located within a 50-mile radius of Naval Station Norfolk, Norfolk, VA. Offerors shall be responsible for storing Government Furnished Materials which are associated with individual delivery orders.

9. GENERAL REQUIREMENTS

The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments. Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.

The Contractor Shall:

a. Exercise own judgment and expertise to assure the successful completion of all requirements placed here-under in accordance with and adhering to all VLS governing documents.

b. Designate, in writing, those persons authorized to accept/reject verbal orders.

c. As applicable, coordinate schedules in the work affected areas with the ship’s force representative, MARMC Maintenance Team (MT), the on-site VLS Subject Matter Expert (SME) as defined in the Delivery Order during the performance period of the delivery order. Prior to the start of work, the contractor shall obtain a copy of the ship's operation drills from the ships force to avoid unnecessary delays. To minimize delays and disruptions, the work effort on delivery orders shall be coordinated on a daily basis with the ships force representative to allow for changing situations aboard ships.

d. Forward all requests for changes in delivery schedules, funding requirements and scope of work in writing to the Contract Specialist via the CFR. These requests shall include specific details as to what changes are required and circumstances requiring such and shall be submitted to the Contract Specialist prior to 85% of delivery availability being exceeded.

e. Not respond to new performance requirements until a delivery order or a modification has been signed or verbal authorization has been given by the Contracting Officer.

f. Not respond to any requests requiring deviations in technical performance as specified in the delivery order without obtaining a signed modification or prior approval of the Contracting Officer.

g. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day-to-day work schedule.

h. Comply with NSI 009-24 and ships or shipyard directives in accomplishing isolation, blanking and tagging of equipment, systems, circuits, components, piping and valves. All work performed shall utilize Work Authorization Form (WAF) in conjunction with NSI 009-24. The web site for the WAF is: SUBMEPP: JFMM Fleet Forms (navy.mil).

i. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of performance. This shall be required on all delivery orders performed on this contract whether at a Government facility or at a privately owned facility.

j. Request on a case-by-case basis to use ship's services that are available. A request for use of ship's services shall be made to the ship force representative or Port Engineer. Written permission shall be obtained from the Commanding Officer (CO) of the ship before actual use of any ship services. A request for ship's services may be turned down whether or not the requested service is available. Denial of a request for use of ship's services will not be a valid basis for any claim or request for compensation. Regardless of any request for ship's services, ship's services shall not be used for contractor life support systems (compressors for breathing air), lifting equipment or any other equipment wherein an unexpected disruption of services has a high potential for loss of life, injury or damage to the ship's equipment.

k. Accomplish the requirements of NSI 009-40 for the use of contractor cranes at naval facilities. For work at other than naval facilities, contact the facility manager to determine the requirements and restrictions for crane operations prior to mobilization on-load, final determination of production sequencing and production zone layout, and demobilization off-load. Crane placement restrictions may affect production sequencing and zoning. In either situation, the contractor shall notify the SME for all required Government checkpoints.

l. Ensure that persons assigned to render repair hereunder are at all times under the direction and control of the contractor and are not employees of the Government.

m. Follow all applicable federal, state, and local laws concerning safety, health, and welfare of the contractor’s personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work.

n. Contact the MARMC Duty Officer at (757) 400-0000 when problems are encountered after normal working hours.

o. Submit a written weekly report detailing the daily events and the progress made during the course of each day to the on-site Government VLS SME, as required. Time and location for submission of the weekly report shall be agreed upon at the beginning of each delivery order and prior to the start of the work.

p. Be responsible for tag out of systems to be repaired and the removal of all interferences.

The contractor shall coordinate with the on-site Government VLS SME to verify that systems have been properly tagged-out and secured prior to any production effort. The contractor shall reinstall and perform necessary test(s) to all removed interferences/equipment upon completion of all installations specified herein. NSI 009-23 shall apply.

q. Accomplish the requirements of NSI 009-29 where hangers and pipe are removed, disturbed, or new hangers are being installed.

r. Accomplish preservation of the new and disturbed normally painted surfaces in accordance with NSI 009-32, “Cleaning and Painting Requirements; accomplish.”

s. As required by 40 Code of Federal Regulations Part 63, report in accordance with NSIs 009-01, 009-02, and 009-93 and LWT 042-37. The contractor, when awarded work within another contractor’s facility, is required to contact the facility owner’s environmental staff to determine requirements and report accordingly using federal requirements as standard.

t. Provide the necessary tools and test equipment to perform the repairs/maintenance actions.

u. The contractor shall be responsible for shipboard retrieval, inventory, short-term storage (up to six months) packaging, and shipping service of Maintenance Assistance Modules (MAMs) to and from LCSF (Naval Surface Warfare; Port Hueneme, CA). Upon completion of MAMs confidence testing, the contractor shall be responsible for performing the same functions and returning Government assets to the assigned Naval Vessel under the direction of Government Technical Director and/or Subject matter Expert.

v. Develop and implement test and quality assurance techniques in the performance of maintenance actions. The contractor shall conduct operational tests and provide written, legible copies of all test results to the SME.

w. Accomplish the requirements of NSI 009-84 when using any temporary fasteners and NSI 009-95 when using any mechanically attached fittings.

x. Ensure personnel are familiar with the requirements of NSIs 009-08 and 009-93 and LWT 042-39 when working within a privately owned ship repair facility.

y. Prior to the delivery order start date, the contractor’s On-Site Supervisor shall meet with the SME to review the plans, drawings and schedules. The contractor shall immediately submit an itemized estimate for performing in accordance with the delivery order statement of work.

z. Accomplish the requirements of NSI 009-12 when any welding or brazing services are required.

aa. The contractor shall provide and maintain a Quality Assurance Program acceptable to the Government. The contractor shall perform or have performed, the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the contract, conform to the drawings, specifications, and contract requirements listed herein. The contractor’s quality program shall be in accordance with that set forth in Standard Item 009-04. The Government shall have the right to deem work or material furnished by the contractor to be incomplete and not in accordance with the requirements of the contract by reason of the contractor’s failure to:

1) Contractor shall provide a written Quality Assurance Program prior to the start of productive work and NO LATER THAN 10 calendar days after award of contract to the MT, PM and MARMC QA that has been accepted by MARMC. Contractors will not be issued delivery orders without an approved Quality Assurance Program.

2) Comply with the requirements of the quality assurance system.

10. ENVIRONMENTAL AND SAFETY REQUIREMENTS

The Contractor shall:

a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos-containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR 1915.1001. Removal, disturbance or disposal of ACM shall be accomplished IAW the requirements of NSI 009-10.

b. Accomplish confined space entry, certification, fire prevention and housekeeping requirements of NSI 009-07, 009-35 and 009-70. The contractor shall maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained for the duration of the delivery order in the work areas specified on each delivery order.

c. Consider all waste to be removed from a ship under repair to be potentially hazardous waste. This includes liquids generated as a result of hydro blasting operations and includes wastes not identified under SWT 077-01. The contractor shall review and evaluate all solid waste to determine if that waste is hazardous IAW 40 CFR 262.11.

d. Prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier, and/or the vessel, including solid waste that is “Pending Analysis.”

Labels/placards shall be weatherproof, large enough to provide ready identification, and provide the following information:

Contractor Name

Contractor Point of Contact (POC): (name, cell phone number, phone number)

Vessel

MARMC Contract Number

MARMC Delivery Order Number

On-Site Government SME/ Test Director (TD) (name, cell phone number, phone number)

Ship’s Quarter Deck/Officer of the Deck (OOD) phone number

Description of waste

Analysis Pending/Sample date (if applicable)

MARMC Maintenance Team Project Manager (name, cell phone number, phone number) if applicable

MARMC Port Engineer (name, cell phone number, phone number) if applicable

e. For operations at Naval Station Norfolk, Joint Expeditionary Base Little Creek-Fort Story, and all private contractor shipyards in the Commonwealth of Virginia, all solid waste determined to be hazardous waste shall be turned over to the ship/vessel from which the waste was produced for processing and disposal through NAVFAC MIDLANT (formerly PWC) hazardous waste operations. For operations at Naval Facilities or private contractor’s facilities outside the Commonwealth of Virginia, the contractor shall comply with all state and local regulations and local work items applicable in those areas.

f. Dispose of the waste in accordance with federal, state, and local regulations in the event that a solid waste is determined to be non-hazardous.

g. Provide a clean/empty vessel or tank truck for off-loading and transport grit blast or paint waste generated from the accomplish of the requirements of the delivery order. The contractor shall coordinate the vessel or tank truck placement with the Ship’s Authorized Representative (SAR). The contractor shall be responsible for all plumbing and piping as required. The contractor shall accomplish continuous clean-up of all debris and fluids incidental to installation or removal of piping system components during performance of work in individual delivery orders.

h. Submit to the COR, upon completion of each delivery order, one legible copy, in hard copy or electronic media, a report of the types and amounts of wastewater generated as a result of accomplishment of the delivery order. The report shall include description of wastewater, volume of wastewater, name/address of transporter, and the name/address of the disposal facility. If work is performed in a private contractor’s facility, the contractor shall submit this report to the COR and to the facility’s environmental manager.

11. SECURITY REQUIREMENTS

Contractor personnel shall comply with all current badging and security procedures required gaining access to any Government site (e.g. DBIDS). Access to Naval Installations sites may only be gained by obtaining a badge (either permanent or temporary) from the security office. It is the contractor’s responsibility to check for and obtain changes and updated information at each installation on a continual basis. Further information can be found at:

https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system.html and at MARMC website: http://www.navsea.navy.mil/MARMC/default.aspx.