This Statement of Work (SOW) details the repair of a mooring basin bubble curtain at the U.S. Coast Guard Station Marathon in Florida. The project requires a contractor to rebuild or replace equipment to ensure 100% effectiveness of the installed weed curtain, specifically involving a comprehensive function check of three pneumatic compressor assemblies with 12 compressors, 9 exhaust fans, underwater pneumatic lines, diffusers, distribution blocks, and gauges.
Key requirements include removing and disposing of non-functioning compressors and fan units, rebuilding functioning compressors according to manufacturer recommendations, replacing non-functioning compressors, replacing out-of-commission cooling fans, and performing a cleaning and inspection of underwater equipment. The contractor must provide personnel with knowledge of plumbing, pneumatic compressor maintenance, and electrical skills. Work must be performed between 8:00 AM and 4:00 PM, Monday through Friday, with minimal interference to facility operations. The contractor will be required to provide a detailed assessment of equipment condition prior to starting work and notify the Contracting Officer Representative (COR) upon completion, with a course of action and timeline to be submitted within 2 weeks of award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopsis Solicitation STA Marathon Aeration Curtain.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
U.S. Coast Guard Station Marathon 1800 Overseas Highway
Marathon, FL 33050
STATEMENT OF WORK FOR
Mooring Basin Bubble Curtain Repair
Located at:
U.S. Coast Guard Station Marathon 1800 Overseas Highway
Marathon, FL 33050
GENERAL REQUIREMENTS
PART 1
GENERAL
1. INTENT: The intent of this project is to rebuild or replace all necessary equipment to ensure
100% effectiveness of the installed weed curtain at USCG Station Marathon located at 1800 Overseas Highway Marathon, FL 33050.
2. SCOPE OF WORK: The Contractor shall provide all labor, materials, and equipment to meet all specifications and inspections. Contractor shall preform a function check of three pneumatic compressor assemblies with 12 compressors, 9 exhaust fans, all underwater pneumatic lines, diffusers and distribution blocks and gauge. Contractor must be able to remove and dispose-of existing non-functioning compressors and fan units. The expectation is that the contractor will rebuild all functioning compressors in the system IAW with manufacturer recommended parts and maintenance procedures. Replace all compressors that are not functioning with compressors recommended by manufacturer. Replace all cooling fans currently out of commission. Preform a cleaning and inspection of all underwater equipment and replace/ service as necessary. Perform a performance test to ensure function of all equipment prior to final inspection.
3. QUALIFICATIONS: Contractor shall provide personnel who have the knowledge, qualifications, and working experience to perform the functions outlined in the Performance Requirements. All personnel shall have an understanding of basic plumbing, pneumatic compressor maintenance and electrical qualifications necessary to complete the job.
4. CONTINUITY OF FACILITIES OPERATION: Contractor shall schedule work to minimize interference with the facility’s normal operations. Perform all on-site work between the hours of 8:00 AM and 4:00 PM, Monday through Friday (federal holidays excluded), unless otherwise approved by the Contracting Officer or Contracting Officer’s designated representative.
5. GOVERNMENT FURNISHED MATERIALS: None
PART 2
PERFORMANCE STANDARDS
1. PERFORMANCE REQUIREMENTS: Contractor shall rebuild all functioning compressors in the system IAW with manufacturer recommended parts and maintenance procedures.
Replace all compressors that are not functioning with compressors recommended by manufacturer. Replace all cooling fans currently out of commission. Preform a cleaning and inspection of all underwater equipment and replace/ service as necessary. Perform a performance test to ensure function of all equipment prior to final inspection..
2. SITE VISIT: Site visits are recommended. All site visits should be scheduled with the
Contracting Officer, Facilities Engineer and/or their designated representative.
3. PERFORMANCE STANDARDS: The COTR or Contracting Officer may inspect, at any time, the progression of work to ensure compliance with the contract. The proper adherence to all safety procedures is required prior, during and after work being performed. The contractor shall furnish all personnel with and require donning of required personal protective equipment (PPE). The contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services.
4. DELIVERABLES: Contractor shall provide a detailed assessment of the condition of all components prior to start of work and notify COR upon completion. Notify COR or their representative 24 hours prior to any necessary inspections or completion of contract. Contractor shall include a course of action and timeline necessary to affect repairs within 2 weeks of receiving the award.
5. LIABILITY OF DAMAGES: The contractor shall be liable for all damages to government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damages or injury to persons that occur as a result of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work the workers, the public, and the property of others.
6. POINTS OF CONTACT:
Primary POC: MKC Ian Widney Email: Ian.W.Widney@uscg.mil Phone: (307) 256-6400
Secondary POC: DC1 Devon Rauh Email: Devon.M.Rauh@uscg.mil Phone: (517) 320-1060
END OF SECTION
Pictures of Equipment to be repaired: