SOW Blinds Panels Draft.docx
DOCX document 23 KB Posted
- Attached to
- Patrick Space Force Base DFAC Blinds
- Solicitation number
- FA252124QB078
About this file
This document is a Statement of Work (SOW) for the replacement of blinds/panels in the Pelican room of the Patrick Space Force Base Dining Facility. The SOW requires the contractor to remove the current panels, dispose of them, and replace them with new fabricated free-floating panels approximately 105" long by 24" wide with a center split stack option. The contractor must coordinate the work schedule with the DFAC Manager, verify existing dimensions, clean up the work area, and perform the work during normal business hours. The performance period is 30 days once the contract is awarded.
The related federal contract opportunity is for the Patrick Space Force Base DFAC Blinds, with a Solicitation Number of FA252124QB078. The Department of the Air Force Space Command is the procuring agency, and they are not currently looking for quotes at this time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24QB078 Q and A.docx | DOCX document | |
| Sources Sought.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Blinds/Panels for Pelican Room Riverside Dining Facility DATE 18 June 2024
Furnish all labor, materials, equipment and expertise, required to replace the current blinds/panels that are located in the Pelican room at Patrick Space Force Base Dining Facility.
1. Remove current panels and take away/dispose. Demolish and removal must be accomplished in 1 day with all debris/fabric and remnants must be removed from site.
2. Replace 2 sets of panels (8 panels each side) with fabricated free-floating panels approx. 105” long by 24” wide. Stack option to be center split. Fabric to be a mid-grade commercial fabric that will hold its shape and treated to be easily cleaned. Selection of actual fabric TBD once project is awarded.
3. Two options to be quoted, one using current hardware/brackets and other replacing brackets with new.
4. The Contractor shall coordinate the planned schedule of work with the DFAC Manager. Contractor will also:
· Verify all existing dimensions and conditions before proceeding with fabrication/install
· Clean up the work area after each workday.
· Perform work during normal business hours, Mon – Fri, 8:00am to 5:00pm.
· Be responsible for protecting existing surroundings as needed.
5. Performance period is 30 days once contract awarded.