SOW - BLDG. #302 LOG LODGE RESTROMS Rev4 17AUG22.pdf

PDF 260 KB Posted

Attached to
Log Lodge Bldg 302 Restrooms Renovation
Solicitation number
12305B22R0027
Issued by

View the file

Other files

File Type Posted
Wage Decision MD20220044 5AUG22.pdf PDF
Ceramic Tile client-report-286061.pdf PDF
Dwg - Door Schdl.pdf PDF
Dwg - Toilet.pdf PDF
Self Performed Work worksheet.docx DOCX document
12305B22R0027 Log Ldg Bldg 302 Restrooms Renovation.pdf PDF
Dwg - Sprinkler.pdf PDF
Ceramic Tile client-report-626822.pdf PDF
Dwg - Bldg. 302 Bathroom Elevation.pdf PDF
Dwg - Plumbing.pdf PDF
Dwg - Mechanical 1.pdf PDF
EMR Certification.docx DOCX document
Lead in Ceramic Tile client-report-286060.pdf PDF
Dwg - Mechanical 2.pdf PDF
Dwg - Electrical.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE

BELTSVILLE AGRICULTURAL RESEARCH CENTER

FACILITIES SERVICE

ENGINEERING AND CONSTRUCTION BRANCH

BUILDING 426A, BARC-EAST

10300 BALTIMORE AVENUE

BELTSVILLE, MARYLAND 20705-2350

STATEMENT OF WORK AND SPECIFICATION

TO

RESTORE BLDG. #302 LOG LODGE INTERIOR BLDG. MEN’S, WOMEN’S,

HANDICAPPED RESTROOMS, UTILITY CLOSET AND HALLWAY

RESTORATION

BELTSVILLE AGRICULTURAL RESEARCH CENTER

BELTSVILLE, MARYLAND

Rev. #4 August 17, 2022

STATEMENT OF WORK

PROJECT NUMBER: 2117894

PROJECT LOCATION: Beltsville Agricultural Research Center (BARC), Bldg. #302, Beltsville, Maryland 20705 DESCRIPTION OF WORK: To renovate the Bldg. interior men’s, women’s restroom, handicapped restrooms, utility closet and hallway restoration by replacing the existing ceramic floor tile, ceramic wall tiles, replace damaged drywall, toilet fixtures, accessories, hardware, finishing's, toilet partitions, light fixtures, paint walls, ceiling and doors.

HazMat: In accordance with this contract, the contractor shall provide all labor, material, equipment, and transportation to include all accessories and incidentals necessary to complete this job to government requirements. The facility under this contract may contain Asbestos and Lead materials.

The contractor(s) is/are warned not to disturb any asbestos or Lead materials during the performance of this work. Should the contractor encounter any material that in their judgment may contain Asbestos or Lead, they must stop work immediately and notify the contracting officer (CO) and (COR) within 24 hours. See the Hazmat Testing results for Asbestos and Lead.

Prior to commencing work, the contractor is required to obtain Construction Authorization, vehicle permits, and identification badges. These can be obtained from the Engineering and Construction Office, Building 426A, BARC-East, Beltsville, Maryland. Vehicle permits and identification badges shall be returned to the Government prior to the final payment being issued.

NOTE: THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT TECHNICAL

REPRESENTATIVE ON 301-504-8434 at least 24 HOURS BEFORE ANY WORK IS SCHEDULED TO START. All contractor's work shall be monitored and inspected by BARC personnel and done in accordance with the Statement of Work and attached drawings, specifications, graphics, BARC Special Conditions, and performed in accordance with all federal, state, and local regulations as well as all applicable local building codes, Construction Standards and Codes, Americans with Disabilities Act, local and State traffic codes, Maryland Department of the Environment, the Maryland Highway Specifications, and the Maryland Department of the Environment Regulations concerning Clean Water Act. In the event of conflict, the most stringent regulation shall prevail.

Scope of Work:

On the interior of the Bldg. #302 renovate the men’s, women’s restroom, handicapped restrooms, utility closet and hallway restoration by replacing the existing ceramic floor tile, ceramic wall tiles, replace damaged drywall, toilet fixtures, accessories, hardware, finishing's, toilet partitions, light fixtures, paint walls, ceiling and doors

The following work shall be performed:

A. Mobilization

• Mobilize all necessary personnel, specialized tools and equipment, shoring, soil stabilization approved materials, dumpsters, safety items, etc., to commence work after point of award of the contract and approval of submittals from the COR.

• Dumpster locations shall be coordinated with the COR as well as the final approval of that location.

• Contractor shall submit a construction schedule to the COR. Contractor shall coordinate with Using Activity through the COR for the construction schedule 10 business days after issuance of the Notice to Proceed and prior to beginning construction.

• Hours of service shall be Monday – Friday between 7:30 a.m. – 4:00 p.m. Contractor shall not work on government holidays or weekends. Any work performed other than normal working hours shall be approved by the CO in advance.

• Contractor shall request, through the COR, an outage to any utility a minimum of 2 days in advance. See general requirements and government special conditions.

B. Demolition Base Requirement for Women’s Toilet, Hallway and utility closet

• The contractor shall protect areas that are not to be disturbed or not within the area of work from dust, debris and possible damage.

• In accordance with this contract, the contractor shall provide all labor, material, equipment, and transportation to include all accessories and incidentals necessary to complete this job to government requirements. The facility under this contract may contain Asbestos and Lead materials. The contractor(s) is/are warned not to disturb any asbestos or Lead materials during the performance of this work. Should the contractor encounter any material that in their judgment may contain Asbestos or Lead, they must stop work immediately and notify the contracting officer (CO) and (COR) within 24 hours.

• The contractor shall hereby be Notified that the Women’s Toilet, Hallway and utility closet has been tested for Asbestos and Lead. The testing results conclude that the spaces are Negative for Asbestos, so no special actions are required to remove any materials in these spaces for Asbestos. The testing results conclude that the ceramic tile in theses spaces has been tested Positive for Lead so special actions are required to remove the ceramic tile materials in these spaces. The ceramic tile shall be abated by a Certified and Trained HazMat Abatement Personal.

• The contractor shall remove all of the ceramic tile from the floors and walls of the hallway, women’s, toilets and utility closets. In the Women’s Toilet the wall requirement shall include the removal all of the drywall from the wall that the existing ceramic tile is affixed to.

• The contractor shall remove all of the wallpaper from the walls of the hallways leading to the toilets.

• The contractor shall remove all toilet room accessories for reuse and store away so as to be reinstalled in the exact location once the renovated location is completed. This shall apply to but not limited to soap dispensers, toilet paper dispensers, stainless steel wall mounted trash receptacle, paper towel dispensers, feminine product dispensers, deodorizer dispensers, speakers, toilet seat tissue covers, fans, heaters, posted signs, thermostats, first aid kits, electrical receptacle wall plates and handicapped stainless steel bars.

• The contractor shall remove all lights fixtures and prepare to connect new LED lights to the existing electrical wiring..

• The contractor shall remove all metal toilet partitions and associated hardware from the women’s toilet areas.

• The contractor shall remove all plumbing fixture, shut off valves at the fixtures to also include toilets, bathroom sinks, facets, p traps, s traps, flexible cold and hot water lines, flushometers, soap dispensers, toilet seat covers, toilet seat cover dispensers, sanitary dispensers, paper tower dispensers, toilet paper dispensers, wall mounted trash disposal units, grab bars, toilet deodorizer drip.

• The contractor shall control the dust from entering the adjacent building work spaces, remove and discard all debris off site at an approved land fill. The contractor shall not at any time use the USDA, ARS, BARC Waste Disposal System such as trash can nor dumpsters to discard project debris.

Demolition Option #1 as funding permits for Men’s Toilet and Handicapped Toilet

Men’s Toilet

• The contractor shall hereby be Notified that the Women’s Toilet, Hallway and utility closet has been tested for Asbestos and Lead. The testing results conclude that the spaces are Negative for Asbestos, so no special actions are required to remove any materials in these spaces for Asbestos. The testing results conclude that the ceramic tile in theses spaces has been tested Positive for Lead so special actions are required to remove the ceramic tile materials in these spaces. The ceramic tile shall be abated by a Certified and Trained HazMat Abatement Personal.

• The contractor shall remove all of the ceramic tile from the floors and walls of the hallway, Men’s, toilets. In the Men’s Toilet the wall requirement shall include the removal all of the drywall from the wall that the existing ceramic tile is affixed to.

existing electrical wiring.

• The contractor shall remove all metal toilet partitions and associated hardware from the men’s toilet areas.

toilets, urinals, bathroom sinks, facets, p traps, s traps, flexible cold and hot water lines, flushometers, soap dispensers, toilet seat covers, toilet seat cover dispensers, sanitary dispensers, paper tower dispensers, toilet paper dispensers, wall mounted trash disposal units, grab bars, urinal deodorizer drip, toilet deodorizer drip, .

Handicapped Toilet

• The contractor shall remove all of the ceramic tile from the floors and walls of the Handicapped toilets. This shall require the removal of the drywall that the ceramic tile is affixed to.

• The contractor shall remove all of the ceramic tile from the floors and walls of the Handicapped toilet. In the Handicapped toilet the wall requirement shall include the removal all of the drywall from the wall that the existing ceramic tile is affixed to.

existing electrical wiring.

toilets, urinals, bathroom sinks, facets, p traps, s traps, flexible cold and hot water lines, flushometers, soap dispensers, toilet seat covers, toilet seat cover dispensers, sanitary dispensers, paper tower dispensers, toilet paper dispensers, wall mounted trash disposal units, grab bars, urinal deodorizer drip, toilet deodorizer drip, .

C. Installation Base Requirement for Women’s Toilet, Hallway and Utility Closet

• The contractor shall supply all of the required materials to prepare the concrete floor to receive the new ceramic tile by removing the old grout and adhesive, clean the concrete of debris and dust manufactures specification and industry standards. Repair cracks, holes by supplying and installing a high-performance concrete patching compound to the floor surface manufactures specification and industry standards.

• The contractor shall supply and install 5/8” on all walls of the Women’s Toilet and prepare to receive the new ceramic tile and One (1) coat of Latex Primer and two (2) of Semigloss Latex Paint.

• The contractor shall supply and install 12”x12”x1/4” Ceramic/Porcelain floor tiles that shall be installed in accordance with the manufacturer’s specifications. These are EPM/COR shall Pre- Approved all Products materials that can be used as well as approved equal products.

• The contractor shall supply and install 4”x12”x1/4” Ceramic/Porcelain cove base tiles that shall be installed in accordance with the manufacturer’s specifications. These are EPM/COR shall Pre-Approved all Products materials that can be used as well as approved equal products.

• The contractor shall supply and install 4”x4”x1/4” Ceramic/Porcelain wall tiles that shall be installed in accordance with the manufacturer’s specifications. The 4”x4”x1/4” Ceramic/Porcelain wall tiles shall extend from the top of the 4”x12”x1/4” Ceramic/Porcelain cove base tiles to the ceiling. These are EPM/COR shall Pre-Approved all Products materials that can be used as well as approved equal products.

• The contractor shall supply and install Four (4) American Standard Afwall Millenium FloWise

Elongated Flushometer Toilet with EverClean 1.6 GPF High Efficiency Electronic Flush One- Piece Elongated Right Height Toilet with Seat and Flushometer to be Included or Approved Equal. The toilet and toilet cover color shall be white and the Electronic Flush Flushometer shall be chrome in finish. The Toilet and Flushometer shall have the same rough-in measurements as the existing toilet and Flushometer. Below are the minimum acceptable specifications:

Afwall® Millenium FloWise Elongated Flushometer Toilet with EverClean

• Wall-mounted flushometer valve toilet

• Vitreous china

• High Efficiency, Low Consumption. Operates in the range of 1.1 gpf to 1.6 gpf (4.2 Lpf to 6.0

Lpf)

• Meets definition of HET (High Efficiency Toilet) when used with a high efficiency flush valve

(1.1 gpf - 1.6 gpf or 1.28/1.1 gpf dual flush)

• Maximum Performance (MaP) score of 1,000 grams at 1.1 gpf - 1.6 gpf

• Permanent EverClean® antimicrobial surface inhibits the growth of stain- and odor-causing bacteria, mold, and mildew on the surface

• Condensation channel

• Concealed trapway design

• Elongated bowl

• Powerful direct-fed siphon jet action

• 1-1/2" inlet spud

• Fully-glazed 2-1/8" trapway

• 10" x 12" water surface area

• Tested to support static weight load of 1,000 lbs.

• Sensor-Operated: American Standard Selectronic DC Power #6065.121.002 (Top Spud)

• The contractor shall supply material to fabricate and install a 120” long x 30” wide x 10” high wall mounted Vanity support for Three (3) Lavatory. Note the Lavatory shall be constructed as stated in the attached Drawings.

• The contractor shall supply and install Three (3) American Standard or Approved Equal

0641.100 Barrier Free Boulevard Pedestal Single Hole Bathroom Sink and color being white.

The Boulevard Counter Top Sink shall affix on top of the wall mounted Vanity support and shall have the same rough-in measurements as the existing Sink. Below are the minimum acceptable specifications:

• 0641.100 Center hole only

• Classic styled rectangular pedestal lavatory

• Vitreous china

• Rear overflow

• Supplied with mounting kit

• Right Height® for greater comfort during use

• Faucet ledge with large deck area.

• Design coordinates with Boulevard

• Basin has flat bottom to also allow use as an above counter sink or a drop-in sink (with u-shaped cut out)

• Bowl sizes:17" (432mm) wide, 12-1/2" (318mm) front to back, 5" (127mm) deep

• Compliance Certifications - Meets or Exceeds the Following Specifications: ASME A112.19.2

- 2008/CSA B45.1-08

• The contractor shall supply and install Three (3) Sloan SF-2400 Series Adapter powered with Battery Backup Sensor Activated Pedestal Style Faucet or approved equal by the EPM/COR on each lavatory center hole. The installation shall be in accordance with the manufacturer’s specifications..

• The contractor shall supply and install at the same location as the demolished mirror on the wall above each of the Three (3) lavatory location a new 18” wide x 36” high x ¾” Thick Bobrick - B-292 1836 - Welded-Frame Wall Mirror with Shelf or Approved Equal. Below are the minimum acceptable specifications:

Bobrick · Wall · Bathroom · Silver Bobrick Welded-Frame Mirror with Shelf 18"W x 36"H One-piece roll formed frame is constructed of stainless steel with a satin finish and is ideal for use in high traffic areas such as public restrooms, changing areas, hospitals, residential facilities and schools. Type 304 stainless steel provides superior corrosion resistance against strong cleaning solutions and environmental moisture. Features a 5" deep satin finish stainless steel shelf, with hemmed front edge return for safety. Frame edges are beveled, providing a gapless fit for improved appearance and safety when cleaning mirror. Frame corners are heliarc welded, ground and polished for a smooth finish. Mirror is Eletrolytically copper plated, protecting against silver spoilage. Backing features 3/16" thick water-resistant, polyethylene padding.

Dimensions: 18"W x 36"H.

• The contractor shall supply and install at the same location as the demolished (3) Three (3) Ceiling Hung Stall Stainless Steel Toilet Partitions Group that is 168.5” Wide x 62” Deep x 84” High and a 58” Screening Panel height.

• The contractor shall supply and install (9) 1’ X 4’LED Decorative Volumetric Troffer, 46 watt, 120 volt, 5811 lumens, 5000K. THE NEW lights fixtures shall be connected to the existing electrical wiring and placed in the exact location where the existing light fixtures was located.

The Women’s Toilet shall have (5) LED light fixtures installed, Hallway shall have (3) LED light fixtures installed and Utility Closet (1) LED light fixtures installed. The minimum specification for the LED Light Fixture shall be: Brand: Industrial Lighting Products Model VOLA14-62L-U-30 or approved equal by the COR, Wattage: 46, Voltage 120, Lumens: 5811, CCT 5000K, CRI: 80 or 90, Life: 100000 hours, Listings: ETL, DLC and Warranty: 5 Years.

• The contractor shall supply all of the required materials to paint One (1) coat of Latex Primer and two (2) of Semigloss Latex Paint on the Walls, Ceiling, Doors, Door Frames and all trim.

The Paint color shall be selected by the EPM/COR.

Installation Option #1 as funding permits for Men’s Toilet and Handicapped Toilet

Men’s Toilet

• The contractor shall supply all of the required materials to prepare the concrete floor to receive the new ceramic tile by removing the old grout and adhesive, clean the concrete of debris and dust manufactures specification and industry standards. Repair cracks, holes by supplying and

• The contractor shall supply and install 5/8” on all walls of the Men’s Toilet and prepare to receive the new ceramic tile and One (1) coat of Latex Primer and two (2) of Semigloss Latex Paint.

Ceramic/Porcelain wall tiles shall extend from the top of the 4”x12”x1/4” Ceramic/Porcelain

Piece Elongated Right Height Toilet with Seat and Flushometer to be Included or Approved Equal. The toilet and toilet cover color shall be white and the Electronic Flush Flushometer shall be chrome in finish. The Toilet and Flushometer shall have the same rough-in

• Wall-mounted flushometer valve toilet

• Vitreous china

• High Efficiency, Low Consumption. Operates in the range of 1.1 gpf to 1.6 gpf (4.2 Lpf to 6.0

Lpf)

• Meets definition of HET (High Efficiency Toilet) when used with a high efficiency flush valve

(1.1 gpf - 1.6 gpf or 1.28/1.1 gpf dual flush)

• Maximum Performance (MaP) score of 1,000 grams at 1.1 gpf - 1.6 gpf

• Permanent EverClean® antimicrobial surface inhibits the growth of stain- and odor-causing bacteria, mold, and mildew on the surface

• Condensation channel

• Concealed trapway design

• Elongated bowl

• Powerful direct-fed siphon jet action

• 1-1/2" inlet spud

• Fully-glazed 2-1/8" trapway

• 10" x 12" water surface area

• The contractor shall supply material to fabricate and install a 120” long x 30” wide x 10” high wall mounted Vanity support for Three (3) Lavatory.

0641.100 Barrier Free Boulevard Pedestal Single Hole Bathroom Sink configuration and the color is to be white. The Boulevard Counter Top Sink shall affix on top of the wall mounted Vanity support and shall have the same rough-in measurements as the existing Sink. Below are the minimum acceptable specifications:

• Vitreous china

• Rear overflow

• Supplied with mounting kit

• Right Height® for greater comfort during use

• Faucet ledge with large deck area.

• Design coordinates with Boulevard

• Basin has flat bottom to also allow use as an above counter sink or a drop-in sink (with u-shaped cut out)

• Bowl sizes:17" (432mm) wide, 12-1/2" (318mm) front to back, 5" (127mm) deep

• Compliance Certifications - Meets or Exceeds the Following Specifications: ASME A112.19.2

- 2008/CSA B45.1-08

wall above each of the Three (3) lavatory location a new 18” wide x 36” high x ¾” Thick Bobrick - B-292 1836 - Welded-Frame Wall Mirror with Shelf or Approved Equal. Below are the minimum acceptable specifications:

Bobrick · Wall · Bathroom · Silver Bobrick Welded-Frame Mirror with Shelf 18"W x 36"H One-piece roll formed frame is constructed of stainless steel with a satin finish and is ideal for use in high traffic areas such as public restrooms, changing areas, hospitals, residential facilities and schools. Type 304 stainless steel provides superior corrosion resistance against strong cleaning solutions and environmental moisture. Features a 5" deep satin finish stainless steel shelf, with hemmed front edge return for safety. Frame edges are beveled, providing a gapless fit for improved appearance and safety when cleaning mirror. Frame corners are heliarc welded, ground and polished for a smooth finish. Mirror is Eletrolytically copper plated, protecting against silver spoilage. Backing features 3/16" thick water-resistant, polyethylene padding.

Dimensions: 18"W x 36"H.

• The contractor shall supply and install at the same location as the demolished Two (2)

American Standard Washbrook Water Saving Battery Operated Proximity Sensor Urinal.

Below are the minimum acceptable specifications:

URINAL:

• Vitreous china

• Ultra-High Efficiency. Operates in the range of 0.125 gpf to 1.0 gpf (0.5 Lpf to 3.8 Lpf)

• Flushing rim

• Elongated 14" rim from finished wall

• Washout flush action

• Extended sides for privacy

• 3/4" inlet spud

• Outlet connection threaded 2" inside (NPTF)

• Strainer included

• Meets ANSI flush requirements at 0.125 to 1.0 gpf

• Model 6590.001 top spud

• Nominal Fixture Dimensions: 360 x 480 x 664mm (14-1/8" x 18-7/8" x 26-1/8")

SELECTRONIC® FLUSH VALVE:

• Factory-Installed CR-P2 Lithium Battery

• Pressure Compensation feature ensures accurate flush volume regardless of inlet water pressure

• Self-Cleaning Piston with integral wiper spring significantly reduces clogging and maintenance

• Selectronic® Proximity System with universal sensor provides hygienic, "hands free" operation

• State-of-the-Art Electronics prevent ghost flushing

• Dezincification Resistant semi-red brass alloy

• Fully Mechanical Manual Override Button can flush the valve without power

• Fail-Safe: Valve automatically closes upon loss of power or water pressure and does not need to be reset

• Adjustable Sanitary Flush cleans the fixture & maintains the trap seal.

• Stadium Feature: Valve automatically switches to water savings mode during periods of heavy usage

• Chemical Resistant EPDM Seals for extended life

• Adjustable Tailpiece for rough-in flexibility

• Can be installed left or right handed

• Model 6063.101

Battery Life:

• 4 years @ 4,000 flushes per month

Operating Pressure:

• 20 psi (flowing) - 80 psi (static)

Flow Requirement:

• 10gpm (37.9 L/min.)

• The contractor shall supply and install at the same location as the demolished removal action

(1) Three (3) Ceiling Hung Stall Stainless Steel Toilet Partitions Group that is 168.5” Wide x 62” Deep x 84” High and a 58” Screening Panel height.

• The contractor shall sup[ply all of the required materials to paint One (1) coat of Latex Primer and two (2) of Semigloss Latex paint on the Ceiling and all trim work of the Restroom and One

(1) coat of Latex Primer and two (2) of Semigloss Latex paint on the Walls, Ceiling and all trim work of the Utility Closet. The color shall be selected by the EPM/COR.

• The contractor shall supply and install (5) 1’ X 4’LED Decorative Volumetric Troffer, 46 watt, electrical wiring and placed in the exact location where the existing light fixtures was located.

The Men’s Toilet shall have (5) LED light fixtures installed. The minimum specification for the LED Light Fixture shall be: Brand: Industrial Lighting Products Model VOLA14-62L-U-30 or approved equal by the COR, Wattage: 46, Voltage 120, Lumens: 5811, CCT 5000K, CRI: 80 or 90, Life: 100000 hours, Listings: ETL, DLC and Warranty: 5 Years.

Handicapped Toilet

• The contractor shall sup[ply all of the required materials to prepare the concrete floor to receive the new ceramic tile by removing the old grout and adhesive, clean the concrete of debris and dust manufactures specification and industry standards. Repair cracks, holes by supplying and

• The contractor shall supply and install 5/8” on all walls of the Handicapped Toilet and prepare to receive the new ceramic tile and One (1) coat of Latex Primer and two (2) of Semigloss Latex Paint.

Ceramic/Porcelain wall tiles shall extend from the top of the 4”x12”x1/4” Ceramic/Porcelain

Piece Elongated Right Height Toilet with Seat and Flushometer to be Included or Approved Equal. The toilet and toilet cover color shall be white and the Electronic Flush Flushometer shall be chrome in finish. The Toilet and Flushometer shall have the same rough-in

• Wall-mounted flushometer valve toilet

• Vitreous china

• High Efficiency, Low Consumption. Operates in the range of 1.1 gpf to 1.6 gpf (4.2 Lpf to 6.0 Lpf)

• Meets definition of HET (High Efficiency Toilet) when used with a high efficiency flush valve (1.1 gpf - 1.6 gpf or 1.28/1.1 gpf dual flush)

• Maximum Performance (MaP) score of 1,000 grams at 1.1 gpf - 1.6 gpf

• Permanent EverClean® antimicrobial surface inhibits the growth of stain- and odor-causing bacteria, mold, and mildew on the surface

• Condensation channel

• Concealed trapway design

• Elongated bowl

• Powerful direct-fed siphon jet action

• 1-1/2" inlet spud

• Fully-glazed 2-1/8" trapway

• 10" x 12" water surface area

0641.100 Barrier Free Boulevard Drop-In Single Hole Bathroom Sink configuration and the color is to be white. The Boulevard Counter Top Sink shall affix on top of the wall mounted Vanity Counter support and shall have the same rough-in measurements as the existing Sink.

Below are the minimum acceptable specifications:

• Vitreous china

• Rear overflow

• Supplied with mounting kit

• Right Height® for greater comfort during use

• Faucet ledge with large deck area (faucet not included)

• Design coordinates with Boulevard

• Basin has flat bottom to also allow use as an above counter sink or a drop-in sink (with u-shaped cut out)

• Bowl sizes:17" (432mm) wide, 12-1/2" (318mm) front to back, 5" (127mm) deep

• Compliance Certifications - Meets or Exceeds the Following Specifications: ASME A112.19.2

- 2008/CSA B45.1-08

• The contractor shall supply material to fabricate and install Plastic Laminate 34” long x 24”

Deep x 5” Front Edge height wall mounted Vanity counter support for One (1) Lavatory. Note the Plastic Laminated Lavatory Support shall be constructed as stated in the attached Drawings.

The Lavatory shall rest on top of the Vanity support and shall extend 5” beyond the both side edges of the Lavatory.

wall above One (1) lavatory location a new 18” wide x 36” high x ¾” Thick Bobrick - B-293 1836 - Welded-Frame Wall Mirror with Shelf or Approved Equal. Below are the minimum acceptable specifications:

• Mirror Frame — 18-8, type 304, heavy-gauge stainless steel, 3/4" x 3/4" (19 x 19mm) angle with vertical-grain satin finish. One piece, roll formed construction forms continuous integral stiffener on all sides. Bevel design on front of angle holds frame tightly against mirror. Corners of mirror frame are heliarc welded, ground and polish smooth. Galvanized steel back is fastened to frame with concealed screws and equipped with integral horizontal hanging brackets near the top and bottom of the mirror for hanging the mirror and to prevent the mirror from pulling away from the wall frame.

Wall Frame — 18-8, type 304, heavy-gauge stainless steel with satin finish. Tapers from 4-

3/8" (111mm) depth at top to 1-5/16" (33mm) depth at bottom. Wall Frame furnished with tumbler lock to secure mirror to wall frame.

Designer's Note: Type 304 stainless steel provides superior corrosion resistance, compared to

400 Series stainless steel, against environmental moisture, hose-down maintenance and strong cleaning solutions.

Mirror — No. 1 quality, 1/4" (6mm) select float glass, selected for silvering; electrolytically copper-plated by the galvanic process, guaranteed for 15 years against silver spoilage. All edges are polished and protected by plastic filler strips;

back is protected by full-size, shock-absorbing, water-resistant, nonabrasive, 1/8" (3mm) thick polystyrene padding.

OPERATION:

Mirror is designed to provide full visibility for wheelchair patients in hospitals and nursing homes.

• The contractor shall supply and install (2) 1’ X 4’LED Decorative Volumetric Troffer, 46 watt, electrical wiring and placed in the exact location where the existing light fixtures was located.

The Handicapped Toilet shall have (2) LED light fixtures installed. The minimum specification for the LED Light Fixture shall be: Brand: Industrial Lighting Products Model VOLA14-62L- U-30 or approved equal by the COR, Wattage: 46, Voltage 120, Lumens: 5811, CCT 5000K, CRI: 80 or 90, Life: 100000 hours, Listings: ETL, DLC and Warranty: 5 Years.

• The contractor shall supply all of the required materials to paint One (1) coat of Latex Primer and two (2) of Semigloss Latex paint on the Walls, Ceiling, Doors, Door Frames and all trim.

The Paint color shall be selected by the EPM/COR.

Required for the Base Project and Option #1

• The contractor shall use the drawing and pictures as a reference tool. I field site visit is required to get a full understanding of the existing condition of the Bldgs. As well as size and Bldg.

layout.

• The contractor shall reinstall all toilet room accessories that were stored away in the exact location that it was before the renovation started. This shall apply to but not limited to soap dispensers, toilet paper dispensers, stainless steel wall mounted trash receptacle, paper towel dispensers, feminine product dispensers, deodorizer dispensers, speakers, toilet seat tissue covers, fans, heaters, posted signs, thermostats, first aid kits, electrical receptacle wall plates and handicapped stainless steel bars. The contractor shall clean the items after installation is completed.

• CLEAN-UP & FINAL PUNCH LIST: The contractor shall clean the site of any loose debris and schedule a final walk thru with Contracting Officer technical representative (COR) and Contracting Officer (CO). Upon completion of all punch list items, the parking passes and badges remitted to the (COR). The Contractor and the COR will instruct the CO that the contract has been to the completed in its entirety.

• The contractor shall provide at least a one-year warranty on the Work/Labor. The contractor shall indicate the years of the warranty upon submission of proposal.

• The contractor shall field verify all field conditions, measurements, quantities and safety constraints prior to bidding and forward any discrepancies or concerns to the Contract Office Representative (COR). Otherwise it’s our intent that all is inclusive of everything regardless of quantity, measurement or level of protection required to accomplish scope of work.

General:

A. Demolition: The contractor shall remove and dispose of Government property, all items indicated as TO BE REMOVED. Such items become the property of the contractor and shall be loaded, transported per applicable DOT regulations, and disposed at approved landfills.

B. Field Verification: The contractor is responsible for field verification of all measurements, quantities and field conditions prior to commencing work.

C. Staging: All equipment, supplies and materials for this contract shall be stored in the work area at the contractor’s risk. The buildings and grounds at BARC will be secured at the end of each day by BARC Security. The security at BARC is not responsible for any of the contractor's stored material, equipment, either inside or outside the building at any time.

D. Construction Project Schedule: See contract, FAR 52.236-15 Schedules for Construction Contracts.

The Contractor will not begin actual work until the construction project schedule has been approved by the Contracting Officer. The Contractor shall submit one electronic copy of the updated construction project schedule with each progress payment request.

E. Contract Inspector’s Daily Report: Contractor shall submit to the Contracting Officer a daily report listing the names of all those present on the job site each day, along with their Job Classification, hours of work and a brief description of the work performed by each on that day.

The Contract Inspector’s Daily Report is to be submitted at the beginning of work each day for the previous day’s work and shall be maintained throughout the term of the contract.

F. Formal Meetings: Any meeting (deemed formal by the contractor, the COR, or the Contracting

Officer) will have the minutes of said meeting prepared by the contractor (and a copy provided to the Contracting Officer). The minutes will include: Date, Name of Attendees (with contact info), Old Business, and New Business subjects (or narratives). Regardless of who requests a meeting

(the COR or the Contractor or the Contracting Officer) the contractor may be required to provided hard copy pictures of the issues to be discussed. Each issue will be linked to a contract specification section number and/or subject area by page number. Issues discussed will also include an action/completion date.

G. Safety Submittals: Contractor shall submit a "site specific" Safety Plan to the Contracting Officer that describes how the contractor is to comply with all applicable OSHA standards and NFPA codes pertaining to construction work to include, but not limited to: General Safety and Health Provisions, Occupational Health and Environmental Controls, Personal Protective and Life Saving Equipment, Hand and Power Tools, Welding and Cutting, Electrical, Scaffolds, Fall Protection, Excavations, Demolition, Stairways and Ladders, Toxic and Hazardous Substances, Confined Space Entry, Lockout/Tagout, Respiratory Protection, Hearing Protection. Safety Plan shall identify Contractor and sub-contractor employees who are authorized/qualified to perform electrical work. No work shall proceed until written approval of the Safety Plan by the Contracting Officer. Safety Plan shall describe how the Contractor and/or sub-contractors are to secure equipment, supplies, tools, and chemical products. Contractor and/or sub-contractor equipment, supplies, tools, and chemical products are to be under the control of the Contractor at all times, equipment, supplies tools, and chemical products found not to be under the control of the Contractor or sub-contractor are subject to confiscation and will be reported to the Contracting Officer. Note see the enclosed sample of a Site-Specific Safety Plan.

H. The Contractor shall inspect the entire construction site daily, including days without construction work if there are NFPA 101 Life Safety Code deficiencies existing while construction work is shut down, the results of that inspection shall be documented on the attachment “DAILY INSPECTION FORM”, and the form is to be signed and submitted to the Contracting Officer.

I. Contractor shall provide continuous monitoring for noise, dust, chemical vapor generation, volatile organic compounds, and vibration. At no time shall noise exposure to any ARS staff exceed 75 dB.

Contractor shall provide to the Contracting Officer a written weekly update of the all test results and also for proposed work for the subsequent two weeks (a two week “look-ahead”)involving any construction activity that will produce loud noises, heavy vibrations, strong smells, or significant dust inside ARS staff occupied space.

J. Contractor and sub-contractors shall notify in writing the Contracting Officer at least one week prior to executing high risk work (this may be included in the two week “look-ahead” update).

High risk work includes, but is not limited to, tasks requiring Lockout/Tag Out, live electrical work, hot work, work at heights, trenching/ shoring, crane operations, and confined space entry.

Contractor’s Competent Person shall provide the Contracting Officer written weekly documented safety inspection results.

K. Contractor shall provide to the Contracting Officer for approval, copies of Safety Data Sheets

(SDS) for EVERY CHEMICAL WITHOUT EXCEPTION prior to bringing such chemical on the work site.

L. Hot and Grinding Work Permits: The Contractor will not be permitted to work without this permit when performing Hot and Grinding Work.

M. Scheduling: See contract.

N. Submittals: The contractor shall submit the manufacturer’s technical data sheets and shop drawings for the items listed in the Submittal Registry 5 calendar days from the point of contract award.

Each submittal shall be attached to a Submittal Transmittal Form (enclosed), signed by the Contractor, and delivered to the Contracting Officer. Provide 6 copies of each material submittal.

All Aquatherm materials shall list name of each product to be used identified by manufacturer and product number.

O. Coordination: The contractor shall coordinate with the COR, with adequate notice, all work which will require an inconvenience or work stoppage to Government personnel due to noise, dust, extreme temperatures or interruption in utilities.

P. Complete Work: It is the intent of this project to contract for a complete, functioning mechanical and or electrical system, finished in all respects, accomplished by mechanics skilled in the trades involved and performed in the highest standards of workmanship.

Q. Contractor Guaranty and Warranty: All contracted work shall be guaranteed by the contractor for a period of one (1) year for labor from the date of final acceptance against defective materials, design and workmanship. The material shall be as specified in the manufacture’s specifications but at least one year. Upon receipt of notice from the Government of failure of part or parts of the guaranteed equipment during the warranty period, the affected part or parts shall be replaced within 48 hours with new parts by and at the expense of the contractor. ALL WARRANTIES SHALL

BE TURNED OVER TO THE COTR PRIOR TO FINAL INVOICING.

END

File details come from the government source that posted it. Updated .