SOW BLD24 and 42 greenhouse wall repair2024.docx
DOCX document 649 KB Posted
- Attached to
- Repair Greenhouse Wall Federal contract opportunity
- Solicitation number
- 12405B24R0020
About this file
This document is a Statement of Work (SOW) for repairing and stuccoing the greenhouse knee walls at USDA Buildings 24 and 42 in Tifton, Georgia. The project objective is to repair the concrete foundation walls and apply a stucco finish to the exterior. The SOW outlines the contractor's responsibilities, including verifying site conditions, managing the project to minimize impacts on operations, following ARS safety and security requirements, and properly disposing of all demolished materials. The work is to be completed within 30 days of the Notice to Proceed, and the contractor must be registered in SAM. A related federal contract opportunity, Solicitation Number 12405B24R0020, has been set aside for small businesses under NAICS code 238110 for a project magnitude less than $25,000. Prospective offerors must complete specific blocks in the solicitation and have an active SAM registration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 12405B24R0020.docx | DOCX document | |
| 12405B24R0020.pdf | ||
| Attachment 4 ARS-372.pdf | ||
| Attachment 3 - ARS-371.pdf | ||
| Wage Rates.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Greenhouse Foundation Wall Repair
USDA Building #24&42 Asset ID # 660200B0024 Asset ID # 660200B0042
USDA-ARS
2058 Moore Highway. Tifton, Georgia 31794 Tifton, Georgia
Prepared by:
Lee Willis, Facilities Maintenance Mechanic 26 March 2024
Table of Contents
| Pictures | Page 3 | ||
| Statement of Work | Page 4 | ||
| Contractor Responsibility | Page 4-5 | ||
| Project Schedule/Contacts | Pages 6-7 |
Pictures
Statement of Work: Repair concrete foundation walls CGBRU Pathology Lab Greenhouses USDA Bldg24&42
Project Objective: The objective of this project is to repair and stucco greenhouse knee walls at CGBRU USDA greenhouses Building 24 and 42 located at 2058 Moore highway, Tifton, GA 31794.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.
Registration can be obtained through:
https://www.beta.sam.gov Site Visit: Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. This project is located at USDA-ARS in Tifton, Georgia.
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
All employees of the general contractor or subcontractors shall have the 10- hour OSHA certified Construction Safety course and/or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.
Base Bid: Provide all equipment, labor, and materials necessary (including dumpster/container if applicable) to:
· Repair all exterior cracks of block foundation knee walls for Bldg24 &42 (contractor must provide all materials for repair)
· Remove and reinstall any wall attachments (piping, electrical boxes, etc) as necessary
· Provide and install stucco (textured finished) around the exterior of knee walls for Bldg24&42
· Apply concrete sealant and paint (color to be determined after award) to stucco after installation
· Provide all quotes as turn-key completed work.
· Work shall be accomplished in accordance with all local, state and federal codes and regulations.
All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed and presented in unlocked MS Excel format with formulas working.
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will perform the work as listed in the above outlined Base Bid.
3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
6. Contractor must always have a Site Supervisor on the job while working on this project.
7. Contractor will provide their own restroom facility and dumpster.
8. Contractor will remove all demolished material and debris from the worksite and dispose off-site.
9. The Contractor shall confine all operations on Government premises to areas authorized or approved by the Contracting Specialist/Officer or Representative (CO/COR).
10. Employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission from the CO/COR, be identified by project and employer by wearing contractor issued identification badges (if required) at all times on ARS property, and restricted from unauthorized access.
11. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the Contract Specialist/Officer (CO) and Contracting Officer Representative (COR) as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Demolition Procedure:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will schedule the work between working hours as listed below.
3. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor.
4. The contractor shall always be responsible for protecting their work and ensuring the safety of their crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
5. All items demolished shall become property of the Contractor and be removed by Contractor from ARS property.
6. Contractor shall follow all ARS EMS disposal criteria. Recyclable materials shall be recycled, and the savings shall be included in the contractor’s quote, therefore passed on to the government.
7. Contractor shall be responsible for providing disposal records where applicable.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused by the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 30 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist/Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
ARS reserves the right to close or shut down the project site and order the Contractor’s employees off the premises in the event of a national emergency or Government shutdown. The Contractor may return to the site only with the written approval of the CO/COR
Work Hours:
Contractor’s working hours shall be scheduled to coincide with the working hours of the Tifton location which are 8 a.m. to 4:30 p.m. Should it be necessary to work hours other than the regular working hours, the contractor shall arrange for access to the area with the CO/COR three days prior to the need.
Project Contacts:
Lynn Hults Contract Specialist/Officer (CO) USDA, ARS, Southeast Area Administrative Office Acquisitions, Personal Property & Fleet Management 912-464-9723 image1.png image2.jpeg image3.jpeg image4.jpeg