SOW BLD20- GH boiler piping replacement2022-Final.docx
DOCX document 4 MB Posted
- Attached to
- Replace Radiant Hot Water Piping Federal contract opportunity
- Solicitation number
- 12405B22Q0230
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Service Clauses.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Green House Radiant Heat Boiler Piping Hot Water Return Pump Flush Boiler System USDA Building #20 Asset ID # 660200B020
USDA-ARS
Tifton, Georgia
Prepared by:
Lee Willis, Facilities Maintenance Mechanic 9 Feb 2022
Table of Contents
| Location Map | Page 3 | ||
| Statement of Work | Page 4 | ||
| Contractor Responsibility | Page 5 | ||
| Project Schedule/Contacts | Pages 6-7 |
Location Map 2282 Rainwater Rd Tifton, Ga 31793
Statement of Work: Remove and replace the boiler radiant heat piping in Greenhouse 20. Provide and install 1/2HP pump in return water line for boiler system. Disconnect existing hot water lines and flush boiler system for Bldgs19&20.
Project Objective: The objective of this project is to remove and replace the radiant heat piping in each of the 4 bays of Bldg20. All piping, unions/fittings and connected radiators from the supply lines inside the Greenhouse are to be removed and replaced. Provide and install pump in return line of boiler system. Flush boiler system for Bldg19&20.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.
Registration can be obtained through:
https://www.beta.sam.gov
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 7 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
All employees of the general contractor or subcontractors shall have the 10- hour OSHA certified Construction Safety course and/or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.
Base Bid: Provide all equipment, labor, and materials necessary (including dumpster/container if applicable) to: Provide all quotes as turn-key completed work.
· Work shall be accomplished in accordance with all local, state and federal codes and regulations.
· Work shall be accomplished by certified technicians
· All radiant heat boiler piping including unions, fittings, individual radiators inside greenhouse must be removed and replaced from the supply lines with new components comparable to existing system
· Provide and install 1/2HP pump motor and housing in 3in return water line adjacent to boiler in Bldg19
· Flush remaining boiler piping in bldgs. 19&20 (disconnect existing piping if necessary and flush to clean system)
All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed and presented in unlocked MS Excel format with formulas working.
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will perform the work as listed in the above outlined Base Bid.
3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
6. Contractor must always have a Site Supervisor on the job while working on this project.
7. Contractor will provide their own restroom facility and dumpster.
8. Contractor will remove all demolished material and debris from the worksite and dispose off-site.
9. The Contractor shall confine all operations on Government premises to areas authorized or approved by the Contracting Specialist/Officer or Representative (CO/COR).
10. Employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission from the CO/COR, be identified by project and employer by wearing contractor issued identification badges (if required) at all times on ARS property, and restricted from unauthorized access.
11. The Contractor shall hold and save the Government, its officers, and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the Contract Specialist/Officer (CO) and Contracting Officer Representative (COR) as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Demolition Procedure:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will schedule the work between working hours as listed below.
3. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor.
4. The contractor shall always be responsible for protecting their work and ensuring the safety of their crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
5. All items demolished shall become property of the Contractor and be removed by Contractor from ARS property.
6. Contractor shall follow all ARS EMS disposal criteria. Recyclable materials shall be recycled, and the savings shall be included in the contractor’s quote, therefore passed on to the government.
7. Contractor shall be responsible for providing disposal records where applicable.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 30 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist/Officer in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
ARS reserves the right to close down or shut down the project site and order the Contractor’s employees off the premises in the event of a national emergency or Government shutdown. The Contractor may return to the site only with the written approval of the CO/COR
Work Hours:
Contractor’s working hours shall be scheduled to coincide with the working hours of the Tifton location which are 8 a.m. to 4:30 p.m. Should it be necessary to work hours other than the regular working hours, the contractor shall arrange for access to the area with the CO/COR three days prior to the need.
Project Contacts:
Mr. Nathaniel Flader, Administrative Officer (AO) USDA, ARS Location Support Staff 2316 Rainwater Road Tifton, Georgia 31793 Phone: (229-391-2668) Email: Nathaniel.flader@usda.gov
Dr. Timothy Strickland, Location Coordinator USDA, ARS Southeast Watershed Research Unit 2316 Rainwater Road Tifton, Georgia 31793 Phone: 229-386-3664 (Office) Email: tim.strickland@usda.gov
Mr. Lee Willis (COR) USDA, ARS Facilities Maintenance Mechanic 2316 Rainwater Road Tifton, Georgia 31793 Phone: (229) 392-6747 Email: lee.willis@usda.gov
To Be Determined, Contract Specialist/Officer (CO) USDA, ARS, Southeast Area Administrative Office Acquisitions, Personal Property & Fleet Management image1.png image2.png image3.png image4.png