SOW BioSolids2020.docx
DOCX document 32 KB Posted
- Attached to
- Dewatered Sludge Removal Federal contract opportunity
- Solicitation number
- 70Z04920QE2W50
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-18_page 2.pdf | ||
| E2W50 RFQ_Services_Over 25k - Aug 2019.docx | DOCX document | |
| SF-18_page 1 E2W50.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
U.S. COAST GUARD TRAINING CENTER PETALUMA
ANNUAL BIOSOLIDS REMOVAL
COAST GUARD TRACEN PETALUMA
SECTION 1 – GENERAL INFORMATION
1.1 Statement of Work:
The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to load, transport and deliver dewatered biosolids located at the U.S. Coast Guard Waste Water Treatment Facility to the Altamont Landfill and Resource Recovery Facility at 10840 Altamont Pass Road Livermore CA. The contractor must perform to the standards in this contract.
1.2 Place of Performance:
USCG TRACEN Petaluma 599 Tomales Rd.
Petaluma, CA 94952
1.3 Contracting Officer Technical Representative:
Any questions regarding statement of work:
| Name: | Warren Schenstrom | or | Jason Briggs, CWO | |||
| Phone: | 707-765-7479 | or | 707-765-7312 | |||
| Email: | Warren.M.Schenstrom@USCG.MIL | or | Jason.D.Briggs@USCG.MIL |
1.4 Point of Contact for submitting quotes:
Any questions regarding submitting quotes:
| Name: | SK1 Kim Reich |
| Phone: | 707-765-7484 |
| Email: | Kimberly.A.Reich@USCG.MIL |
1.5 Contractor Personnel:
The contractor must provide a contract manager who must be responsible for the performance of the work. The name of this person, and an alternate or alternates, who must act for the contractor when the manager is absent, must be designated in writing to the contracting officer.
Name: ___________________________________ Title: ____________________________________ Phone: ___________________________________ Email: ___________________________________
Name: ___________________________________ Title: ____________________________________ Phone: ___________________________________ Email: ___________________________________
1.5.1 Contractor employees:
Due to heightened Security at USCG Facilities, all contractor employees performing tasks related to this SOW, shall have a valid Real ID compliant Federal or State identification, while onboard a Coast Guard facility. Vehicles shall have current registration and insurance, and drivers shall have valid driver’s license. Time spent undergoing entrance to USCG facilities will not be considered a government delay of work or differing site condition.
1.6 Hours of Operation:
The contractor shall perform all services during normal working hours:
7:00 am to 4:00 PM Monday thru Friday, except on recognized Federal holidays.
1.7 Award:
It is the governments’ intent to make an award to the Lowest Price Technically Acceptable (LPTA) offered through issuance of a firm fixed price contract.
1.7.1. Awardee Registration:
Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in (SAM) shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov
1.8 Acceptance plan:
Completion of work under this contract will be monitored and accepted by Coast Guard Technical Representative, (see above). All work is to be completed in 30 workdays of awarded contract.
SECTION 2 – DESCRIPTION OF WORK
The contractor must provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to load, transport and deliver dewatered biosolids located at the U.S. Coast Guard Waste Water Treatment Facility to the Altamont Landfill and Resource Recovery Facility at 10840 Altamont Pass Road Livermore CA. The contractor must perform to the standards in this contract.
A. The loading of biosolids from storage bays into trucks.
1. Estimated tonnage: 200 B. The transportation and disposal of biosolids to the Altamont Landfill and Resource Recovery Facility.
C. The Contractor shall furnish the following:
1. Equipment Rental, Mobilization / Demobilization
2. Labor for the loading and transportation of biosolids
3. Truck Drivers and Technicians D. The Contractor shall meet in conference with Warren Schenstrom or CWO Jason Briggs, at a time to be specified, to discuss and clarify the scheduling and administration of the work.
SECTION 3 – QUALITY CONTROL PROGRAM
The contractor is responsible for all quality control (QC) and management actions to meet the terms of the contract. The Government performs quality assurance to monitor whether contract standards are achieved.
3.1 Safety
All work shall be conducted in a safe manner and shall comply with all applicable federal, state and local safety standards and requirements. The government reserves the right to inspect for compliance with safety standards and requirements. The contractor shall provide their employees with all necessary personal protective equipment (PPE) required to safely accomplish the task described herein.
SECTION 4 – GOVERNMENT FURNISHED WORK, FACILITIES AND SUPPLIES
The Government will provide reasonable amounts of water, electrical power, fuel for testing, etc., as may be necessary to perform required services.
***END OF STATEMENT OF WORK***