SOW_Baton_Rouge_Fence.docx
DOCX document 401 KB Posted
- Attached to
- Baton ROUGE, LA requires a secured fence
- Solicitation number
- 140G0124Q0191
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to construct a security fence for the warehouse parking lot and ware yard at the U.S. Geological Survey (USGS) Lower Mississippi Gulf Water Science Center in Baton Rouge, Louisiana.
The SOW requires the contractor to remove existing chain link fencing with barbed wire and construct approximately 380 linear feet of new 8+1 industrial grade galvanized chain-link fence, including one 16-foot wide industrial grade galvanized V-track gate, one 4-foot walk gate, and relocation/replacement of one automatic gate opener. The work must be completed within 60 days after the notice to proceed. The contractor will be responsible for all materials, labor, equipment, travel, and supervision necessary to perform the work. The site is leased through the General Services Administration (GSA), so GSA approval is required for the fence removal and construction. The contract will include a 12-month warranty on all workmanship.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140G0124Q0191_Amd_0002.pdf | ||
| Sol_140G0124Q0191_Amd_0001.pdf | ||
| Sol_140G0124Q0191.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
U. S. GEOLOGICAL SURVEY
STATEMENT OF WORK
LOWER MISSISSIPPI GULF WATER SCIENCE CENTER
BATON ROUGE, LA OFFICE PARKING LOT FENCE
I. GENERAL INFORMATION
a. INTRODUCTION. The Department of the Interior (DOI), U.S. Geological Survey (USGS), Lower Mississippi Gulf Water Science Center Baton Rouge, LA Office, 3535 S Sherwood Forest Blvd, Baton Rouge, LA has a requirement to construct a security fence for the warehouse parking lot and ware yard where fleet vehicles, boats, trailers, and other equipment are kept.
b. BACKGROUND. The Baton Rouge office is in a high foot traffic area and recent increases in crime and vandalism, including employee’s personal vehicles during regular business hours, necessitate the expansion of the secure parking area. The existing fencing is chain link with barbwire that will need minor repairs and full removal in some areas. The facility is leased through GSA and will need GSA approval for the removal and construction of new fencing.
c. DEFINITION/APPLICABLE DOCUMENTS.
i. Fenced Area Photo – Section III.f
d. SCOPE. The contractor shall provide all materials, labor, equipment, travel, and supervision necessary to remove existing fencing and construct a new fence around an existing parking and ware yard lot in order to secure Department of Interior (DOI) and privately-owned vehicles of employees.
II. WORK REQUIREMENTS
a. TECHNICAL REQUIREMENTS
i. DEMOLITION/SITE PREPERATION. Removal of portions of existing chain link fencing (including posts) will be necessary and minor concrete repairs will be required. The job will also include the relocation of the existing automatic gate opening mechanism which may require the removal of ground loops.
ii. CONSTRUCTION. Contractor to install approximately 380 linear feet of 8 + 1 industrial grade galvanized chain-link fence, one (1) 16ft wide, industrial grade galvanized v-track gate, one (1) 4ft opening walk gate, and relocate/replace (1) automatic v-track gate opener. This installation shall include all necessary fencing, posts, and concrete per the fence manufacturer guidelines and ASME specifications.
b. GENERAL REQUIREMENTS
i. Schedule. Within five (5) calendar days after the notice to proceed is issued, the Contractor shall submit in writing to the USGS Technical Liaison a schedule of construction for the project. The schedule shall indicate the dates of the periods of time that the Contractor intends to be on site. The schedule shall indicate the dates that major components of the work will be accomplished. When preparing the schedule, the Contractor shall consider lead times for utility outages, permit requirements and material/ equipment procurement, and shall consider the permitted hours of work indicated in Time of Work Performance clause. The Contractor shall notify the USGS Technical Liaison immediately if any anticipated on-site date is expected to change from the original schedule. The Contractor shall be responsible for determining the labor staffing levels needed to complete the project by the established delivery date. The contractor shall arrange deliveries of materials in accordance with construction schedules; coordinate with COR to avoid conflict with other tenants and other work conditions at the site. Contractor must make GSA PM & CO aware of any lead times that may affect the project schedule.
c. WARRANTY. The Contractor shall warranty all workmanship to meet the specifications set forth in this Statement of Work. Additionally, the Contractor shall warranty all Contractor workmanship for a (minimum) period of 12 months from the date of Government acceptance.
d. DELIVERABLES. Completed 8+1 galvanized chain-link fence with one (1) 16ft wide v-track gate and (1) 4ft wide single gate.
III. SUPPORTING INFORMATION.
a. GOVERNMENT FURNISHED PROPERTY (GFP): None.
b. SECURITY. Building access should not be necessary. If an instance occurs where building access is necessary, this shall be coordinated with the Facility Manager or USGS Technical Liaison.
c. PLACE OF PERFORMANCE. USGS Baton Rouge, LA Warehouse Parking Lot, 3535 South Sherwood Forest Blvd. Baton Rouge, LA, 70816.
d. PERIOD OF PERFORMANCE. All work should be completed within 60 days after start of each phase.
e. SPECIAL CONSIDERATIONS
i. The normal facility business hours are 7:00 AM to 4:30 PM, Monday thru Friday. Project work may be conducted outside of these hours, but completion must occur during business hours to allow inspection by the Facility Manager and USGS Technical Liaison.
ii. The vehicle automated gate would be accessible with punch code or some other secure means to gain entry. The automatic gate would also have sensors to allow vehicles to exit the enclosed area.
iii. Utility/Service Interruptions: The Facility Manager and USGS Technical Liaison shall be notified not less than 3 calendar days in advance of any interruptions of building utility/services. The contractor shall describe in writing the work to be done and the time and duration of the interruption. No work shall be done until approval is received from the USGS Technical Liaison.
iv. The contractor shall be responsible for complying with all OSHA, GSA, Federal, State and local laws, codes and regulations in connection with the execution of the contract.
v. Contractor is responsible for visiting the worksite to verify measurements and to ascertain the nature and location of the work to be performed and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve the contractor of his responsibility for estimating properly the difficulty or cost of successfully performing the work.
vi. Occupancy: During construction the Government will occupy the existing facility. The contractor shall not restrict nearby pedestrian or vehicular traffic to this facility and shall coordinate construction with the Contracting Officer to minimize conflicts and to facilitate usage. The contractor shall perform the work so as not to interfere with ongoing operations.
vii. Any changes affecting the scope of work shall be originated from and approved by the Contracting Officer.
viii. All materials and workmanship shall be subject to the inspection and approval of the USGS Technical Liaison. All work unsatisfactorily performed shall be promptly corrected and made acceptable to the Government at no additional Cost.
ix. Final inspection and acceptance shall be performed with the contractor, on site by the USGS Technical Liaison upon completion of job performance.
x. MATERIALS. The contractor shall furnish all supplies, materials, and equipment necessary for performance of the work included in this contract unless otherwise specified. Materials and supplies to be used shall be commercially available products of reputable manufacturers or suppliers and shall be of a quality to conform to applicable Federal Specifications.
xi. EQUIPMENT AND STORAGE. The contractor shall provide and store all equipment, the materials specified above, and any other materials required completing the project. The materials are required to be kept clean and dry throughout the duration of the project. Contractor to coordinate with building manager for location of storage sheds.
xii. SPECIFICATIONS. In any case of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer, without whose decision said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense. Any changes affecting the scope of the work shall originate from and be approved by the Contracting Officer.
xiii. SCHEDULING CONTRACT WORK. The contractor shall make necessary arrangement with the Facility Manager and USGS Technical Liaison to perform the work and shall arrange and schedule his work so that the minimum amount of interference with government activities will result.
xiv. PROTECTION OF PUBLIC. The building site will continue to be used by tenants. The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry. The contractor shall illuminate barricades and obstructions at night and maintain safe building access and egress for tenants.
xv. USE OF BUILDING FACILITIES. The contractor may use utility services of the building subject to approval of the Facility Manager. Portable toilet facilities will be the responsibility of the contractor as part of this contract.
xvi. HOUSEKEEPING. The project site shall be kept in a neat, orderly, and safe condition at all times. The contractor shall provide enough containers for collecting construction debris and construction materials to be recycled. The contractor shall wet down dry materials and rubbish to prevent blowing dust and keep volatile wastes in covered containers.
xvii. CONDITIONS AFFECTING THE WORK. It will be the responsibility of the contractor to inspect the site, determine quality of work involved. Compare the specifications with the work to be done, and inform themselves as to all conditions, including other work, if any, being performed. Failure to do so will in no way relieve the successful contractor from the necessity of furnishing any materials or performing any work that may be required to carry out the contract in accordance with the true intent and meaning of the specifications without additional cost to the Government.
xviii. EMPLOYEES. The contractor shall be responsible at all times for the supervision and control of the employees that may be assigned to render services under the contract. Fully qualified work personnel shall be available for work on the date this purchase order begins and shall be maintained throughout the period of performance.
xix. LICENSES-PERMITS. The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses or permits, and for complying with any Federal, State, and Municipal laws, codes and regulations in connection with the execution of the work.
xx. ACCIDENT PREVENTION AND FIRE HAZARDS. The contractor shall take all necessary precautions to prevent fires or injury to the public, building occupant(s), or damage to property of others during the performance of this contract. For the purpose of this contract, the public or building occupant shall include all persons not employed by the contractor or a subcontractor working under his/her direction. If welding is required, permission shall be obtained from the COTR.
xxi. INDEMNITY. The contractor shall confine all work on Government premises to areas authorized or approved by the Contracting Officer or COTR. The contractor shall save and keep harmless and indemnify the Government against any and all liability claims, and costs of whatsoever kind and nature of injury to or death of any person or persons and for loss or damage to any property (Government or otherwise) occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operations, or performance of work in connection with this contract, resulting in whole or part from the negligent acts or omissions of the contractor.
xxii. CLEANING. Before scheduling the final inspection, the Contractor shall accomplish six items: (1) Remove all tools, equipment, surplus material, and rubbish; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Remove grease, dirt, stains, foreign materials, and labels from finished surfaces; (4) Thoroughly clean building interiors; (5) Pickup all construction debris from the site; and (6) At time of final inspection, project shall be thoroughly cleaned and ready for use.
xxiii. GREEN ACQUISITIONS. The USGS is committed to promoting the natural environment and protecting the health and well-being of people. In the performance of work under this contract, the Contractor shall exert its best efforts to provide services in a manner that will promote the natural environment and protect health and well-being. Green purchasing or environmentally preferable contracting includes the initiatives described below:
1. Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/
2. Biobased Products are described at http://www.biopreferred.gov/
3. Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products
4. Environmentally Preferable Computers are described at http://www.epeat.net
5. Significant New Alternatives Program (SNAP) are described at http://www.epa.gov/snap/overview-snap
6. The Comprehensive Procurement Guidelines promote the use of recovered and recycled products at http://www3.epa.gov/epawaste/conserve/tools/cpg/index.htm
7. Water efficient products and services are described at http://www3.epa.gov/watersense/about_us/what_is_ws.htm
f. Fenced Area Photo
Green – Existing Fence (minor repairs required), northmost section to be removed as noted on the site photo. Concrete repairs required when existing posts removed.
Light Blue – Additional proposed fence.
Red – Gates: 1 existing drive gate to be relocated as noted on the site photo, 1 walk gate as noted on the site photo.