SOW-BASEALAMEDA_RESTRIPING.pdf
PDF 488 KB Posted
- Attached to
- ROAD & PARKING SPACES PAINTING/STRIPPING
- Solicitation number
- 70Z03720QPAA37000
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1449BASEALAMEDASTRIPPINGSERVICE.doc | DOC document | |
| FARCLAUSESCommercial Supplies Services Clauses Provisions FAC 2019-05.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
BASE ALAMEDA
ALAMEDA, CALIFORNIA 94501
SCOPE OF WORK
FOR
PARKING RESTRIPING 2020
AT
BASE ALAMEDA
ALAMEDA, CALIFORNIA
TABLE OF CONTENTS
SECTION TITLE PAGE
DIVISION 01 - GENERAL REQUIREMENTS 1
01 10 00 - GENERAL PARAGRAPHS 1
01 33 00 – SUBMITTALS PROCEDURES 5
01 35 29 – HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES 8
01 35 43 – ENVIRONMENTAL PROCEDURES 12
DIVISION 32 – EXTERIOR IMPRAOVEMENTS 16
32 01 11.51 – PAINT REMOVAL 16
32 17 23 – PAVEMENT MARKINGS 18
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 - GENERAL PARAGRAPHS
PART 1 GENERAL
3.01 SCOPE OF WORK: Furnish all labor, materials, and equipment necessary to remove approximately 80 CLF of old road markings and parking spaces on Coast Guard Island. Repaint approximately 4081 SF of markings and re-stripe parking spaces (1600 stalls) and lots. Add or change the parking spaces indicated on attached maps provided.
3.02 LOCATION: Project site is located at Coast Guard Base Alameda
Coast Guard Island Alameda, CA 94501.
3.03 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. Contact Aleta Beekmann, Engineering Tech Facilities Engineering at (510) 437-3287.
3.04 CONTRACTOR SECURITY REQUIREMENTS: The Contractor shall provide a list of all on-site personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the Contracting Officer. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.
Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.
The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting, for certain purposes, driver's licenses and identification cards from states not meeting the Act's minimum standards. Anyone requiring access to a military facility under this contract, to include subcontractors, who holds a driver's license from any state without approved licenses will be required to provide identification other than that driver's license to gain access. Government IDs annotated with “Federal Limits Apply” will not be accepted for access purposes.
It is the responsibility of the Contractor to ensure that their personnel have federally acceptable personal photo identification and comply with any other requirements for base access.
Contractors shall provide the Contracting Officer's Technical Representative with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance.
Otherwise access to the Coast Guard facility may be denied.
Base Alameda employs the RAPIDGate Program for site access privileges. The contractor is encouraged to attain RAPIDGate credentials for employees to provide quicker entry onto Coast Guard facilities. All costs for registration in the RAPIDGate Program will be at no additional cost to the Government.
RAPIDGate contact information 1-877-727-4342.
3.05 CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facilities normal operations. Notify the Contracting Officer and the site contact 5 business days in advance of any road shutdowns. Contractor shall cone off areas in advance for work to be done. Perform all on-site work between the hours of 7:00 AM and 5:00 PM, Monday through Friday (Federal Holidays excluded), unless otherwise approved by the Contracting Officer and the Unit Commanding Officer.
A. Phasing: Scope of work shall be phased so as to result in the minimum disruption of base operations. Coordinate with unit POC.
Due to the amount of vehicles that use the parking areas, minimize impact on parking availability in addition to phasing of work by performing work during minimum parking times. Coordinate with unit POC to ensure that impacts on parking availability are minimized. Minimum one-way traffic must be maintained during construction, and at least one egress route must be maintained for each work area. All pier access must be maintained at all times.
B. The phasing plan shall be scheduled for best flow of traffic and can be work out with POC and contractor.
3.06 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall notify the Contracting Officer in writing five (5) business days in advance of the date he intends to commence work in each section of parking lot/roadway, and five (5) business days prior to the date that work will be ready for final inspection.
3.07 RECYCLING AND DISPOSAL OF REFUSE: Refuse, excess or waste materials resulting from demolition operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposal shall be done in accordance with federal, state, and local laws and regulations.
3.08 SAFETY: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction and California Code of Regulations, Title 8, Div. 1, Ch 4, Subchapter 4 Construction Safety Orders.
When the standards differ, the more restrictive standard shall apply. The contractor shall provide barriers, temporary fencing, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. An Accident Prevention Plan shall be submitted in accordance with Section 01 35 29, paragraph 1.08.
3.09 TEMPORARY FACILITIES:
A. Laydown area: The location for equipment and materials will be assigned after award. The Contractor shall be responsible for protecting materials and equipment against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area.
B. Sanitary Facilities: There are no toilet facilities available for Contractor use at the job site. The Contractor shall provide their own facilities in accordance with 29 CFR 1926, Chapter XVII, Subpart D, paragraph 1926.51 (c) (1).
C. Water and Electricity: Water and 120V electricity are available at no cost to the Contractor. Cost of these utility connections and disconnections shall be the responsibility of the Contractor.
Personnel using extension cords to bring power from another location to construction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (gfcis), even if connecting to building wiring.
D. Telephone: No telephone service is available for contractor use.
3.10 EXISTING UTILITIES: Contractor shall be responsible for
repairing any utilities damaged during construction at no additional cost to the Government. Utility locations shown are approximate. The Contractor shall field verify all utility locations before excavating.
3.11 CALIFORNIA STANDARD SPECIFICATIONS: Whenever the California Department of Transportation (CALTRANS) Standard Specifications are referenced, the fallowing shall be understood:
A. The terms “Commission” or “Department” shall mean the U.S.
Government.
B. The terms “Director,” “Executive Officer,” or “Engineer” shall mean the Contracting Officer.
3.12 DRAWINGS: The work shall conform to the drawings listed below which form a part of these specifications.
Number Title
11744011 General Site Plan, Pavement/Curb Detail, Photos
1.13 REFERENCE DRAWINGS: The following reference drawings are applicable to the scope of work. All utility drawings are approximate and shall be field verified by the contractor.
Number Title Island_restriping_2020-EAST Island_restriping_2020-WEST
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
END OF SECTION
01 33 00 – SUBMITTALS PROCEDURES
PART 1 GENERAL
1.01 GENERAL
A. Forward all submittals, except as stated elsewhere, to the Contracting Officer by email as indicated on the submittal register. Submittals shall be accompanied with the USCG furnished material submittal form in Microsoft Word Format.
Unless noted otherwise, all submittals shall be provided in an electronic image format. Provide these submittal images to the Contracting Officer, the Construction Manager, and the Contracting Officer's Representative (COR) simultaneously. If the electronic image is insufficient to ascertain submittal acceptability, the Contracting Officer may request a hard copy submittal. The Construction Manager will e-mail approval or disapproval of submittals, within 10 calendar days after receipt.
B. The Construction Manager will review all submittals for compliance with these specifications. Submittals shall have been approved by the Contracting Officer before any item is delivered to the job site.
C. Approval of submittals, and corrections or comments made during the review, do not relieve the Contractor from compliance with the requirements of the plans and specifications.
D. The schedule of submittals listed in the submittal register and in the individual sections are the submittals required for this contract. Unsolicited submittals may be returned to the Contractor without review.
1.02 CERTIFICATES OF COMPLIANCE: Certificates of compliance shall be signed by an authorized officer of the manufacturing company furnishing the material which states that the material being furnished meets all requirements of these specifications and referenced specifications.
1.03 STANDARD COMPLIANCE: When materials or equipment must conform to the standards of organizations such as the American Society for Testing and Materials (ASTM), and Underwriter's Laboratories (UL), proof of such conformance shall be submitted to the Contracting Officer for approval. If an organization uses a label or listing to indicate compliance with a particular standard, the label or listing will be acceptable evidence. In lieu of the label or listing, submit a certificate from an independent testing organization, which is competent to perform the test. The certificate shall state that the item has been tested in accordance with the specified organization's standard.
1.04 TEST RESULTS: Submit test results as described in the individual referencing specification section.
1.05 HAZARDOUS MATERIAL IDENTIFICATION: Submit Safety Data Sheets (SDS) for any materials defined as hazardous under the most current revision of Federal Standard 313. One copy of each SDS shall be submitted to the Contracting Officer's Representative no later than the delivery date of the product. Two copies shall be submitted to the Construction Manager.
1.06 BAR CHART PROGRESS SCHEDULE: Within 10 calendar days after award, submit a bar chart progress schedule. On-site work shall not begin until a bar chart schedule has been approved. The bar chart shall show the complete sequence of construction by activity (including acquisition of materials and equipment). The chart shall identify the construction start date, the completion date, and all workdays through the duration of the project. If the project requires various delivery dates, dates will be indicated for each of the required deliverable elements (i.e., housing unit or specific building). The bar chart shall also identify the cost for the various activities which shall be used as the basis for the Contractor's periodic request for payments.
Submission and approval of as-built drawings and O&M manuals shall each be separate line items (with associated costs) on the bar chart.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
CEU OAKLAND SUBMITTAL REGISTER
PSN:
CONTRACT NO.:
PROJECT TITLE AND LOCATION:
BASE ALAMEDA RESTRIPING
CONTRACTOR NAME:
Submittal Reference Location
DATE
REQUIRED
DATE
SUBMITTED ACTION DATE
NO. SPEC SECTION PARA. PAGE DESCRIPTION OF SUBMITTAL
Days after award APPROVED
APPROVED
AS NOTED DISAPPROVED
RESUBMITTAL
APPROVED REVIEWER
01 33 00
1.06
BAR CHART PROGRESS SCHEDULE (w/in 10 days after Award)
01 33 00 4.07F 4 MOBILE EQUIPMENT OPERATOR LIST 10
01 35 29 1.07A 12 SOLID WASTE DISPOSAL PERMIT 10
01 35 29 1.07B 12 HW MANIFESTS (on the same day) *
01 35 29 1.07C 12 HM/HW HANDLING PLAN 10
01 35 29 1.07D 12 MATERIAL SAFETY DATA SHEETS 60
01 35 29
1.07E
ACCIDENT PREVENTION PLAN (APP) 10
01 35 43
1.06D
STORMWATER POLLUTION PREVENTION
PLAN, NOI
32 17 23 1.03A 26 STRIPING, MARKINGS, & PARKING LAYOUT 10
32 17 23
1.03B
CERTIFICATE OF COMPLIANCE:
STRIPING PAINT
01 35 29 – HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES
PART 1 GENERAL
4.01 SECTION INCLUDES: This section applies to steps taken by the contractor to comply with the health and safety requirements listed herein. The Contractor shall comply with all applicable federal, state, and local laws and regulations. The ultimate responsibility for identifying applicable requirements and protecting contractor employees or sub-contractors rests with the primary contractor.
4.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS:
40 CFR 204 Noise Abatement Program for Construction Equipment
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 302.4 Designation of Hazardous Substances
B. U.S. Army Corps of Engineers (USACE):
EM 385-1-1 Safety and Health Requirements Manual
C. U.S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) REGULATIONS:
29 CFR 1926.59 Hazard Communication
29 CFR 1926 Subpart P Excavations
U. S. DEPARTMENT OF TRANSPORTATION REGULATIONS:
49 CFR 100-199 Hazardous Materials Transportation, Handling, and Storage Regulations
4.03 REFERENCE STATUTES: The statutes listed below form a part of this specification to the extent referenced.
Noise Control Act (NCA) (42 U.S.C. §§ 4901 to 4918)
4.04 HAZARDOUS MATERIAL TESTING:
A. No tests have been conducted on the materials expected to be disturbed during this work. The contractor shall comply with the requirements of this specification in the event any materials are encountered which may pose a potential health hazard.
4.05 UNFORESEEN HAZARDOUS MATERIALS:
A. If, during the course of work, additional material is determined to be hazardous to human health upon disturbance during demolition operations, stop that portion of work and notify the Contracting Officer immediately.
4.06 DEFINITIONS
A. Sediment: Soil and other debris that has been eroded and transported by runoff water.
B. Solid Waste: Rubbish, debris and other discarded solid materials resulting from industrial, commercial, and agricultural operations, and from community activities. Solid waste may also include non-sewage liquids.
C. Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
D. Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.
E. Chemical Wastes: Includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.
F. Sanitary Wastes:
1) Sewage: Wastes characterized as domestic sanitary sewage.
2) Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
G. Asbestos and Asbestos Materials: Asbestos means actinolite, amosite, antophyllite, chrysotile, crocidolite, and tremolite.
Asbestos material means asbestos or any material containing asbestos such as asbestos waste, scrap, debris bags, containers, equipment, and asbestos-contaminated clothing consigned for disposal. Friable asbestos material means any material that contains more than one percent asbestos by weight and that can be crumbled, pulverized, or reduced to powder, when dry, by hand pressure.
H. Oily Waste: Includes petroleum products and bituminous materials.
I. PCB (Polychlorinated Biphenyls): Toxic and non-biodegradable materials used extensively under trade names, such as Pyranol or Askarel, as insulating cooling fluids in capacitors and transformers.
J. Hazardous Material (HM): Chemicals defined by OSHA 29 CFR
1926.59 and under the U.S. Department of Transportation (DOT) regulations (Title 49 CFR Parts 100 through 199) which are determined by the Secretary of Transportation to present risks to safety, health, and property during transportation. The DOT regulations include requirements for shipping papers, package marking, labeling, transport vehicle placarding, and training of personnel handling hazardous materials.
K. Hazardous Substance: Substances defined under the Clean Water Act and CERCLA as chemicals which are harmful to aquatic life or the environment and are regulated, if spilled or otherwise released to the environment. The EPA has designated "reportable quantities" for each hazardous substance (Table 40 CFR 302.4) under CERCLA. If an amount equal to or greater than the reportable quantity of a hazardous substance is released to the environment, that spill must be reported.
L. Hazardous Waste (HW): Substances which are hazardous and have been discarded are regulated as hazardous waste under RCRA or State Health and Safety Codes and their implementing regulations.
A waste is hazardous if it meets certain levels of reactivity, ignitability, corrosivity, or toxicity, or is otherwise listed as a hazardous waste in Title 40 CFR Part 261 or in the respective State Health and Safety Code or Code of Regulations.
4.07 SUBMITTALS: Submit the following in accordance with Section 01 33 00, "Submittal Procedures":
A. Solid Waste Disposal Permit: Upon disposal, provide copies of the acceptance receipts for the material, from the disposal site.
B. HW Manifests: Upon disposal of hazardous waste, submit a copy of the completed manifests within 5 calendar days of delivery of the wastes to the EPA approved treatment, storage and disposal facility.
C. HW Handling Plan: Comply with all local, state, and federal laws and regulations when handling hazardous materials and disposing of and handling hazardous and other wastes. The Contractor shall have a compliance program outlining how the contractor handles and disposes of hazardous materials, petroleum products, hazardous substances, and hazardous waste. The program shall include, but is not limited to, the following elements as appropriate: a general storage site plan, methods used to analyze whether generated material (blasting debris, paint waste, etc.)
is hazardous, any hazardous waste licenses and permits, air district permits, and the identification of hazardous waste and material transportation and disposal contractors. The Coast Guard has the right to require removal from the contract performance of any subcontractor who fails to comply with these laws and regulations or who fails to provide appropriate evidence of compliance with them.
D. Safety Data Sheets (SDS's): Copies of all SDS's for all hazardous materials (including petroleum products) shall be submitted along with a listing of quantities of these hazardous materials proposed to be stored on site.
E. Accident Prevention: Submit a copy of your “Accident Prevention” or “Injury and Illness Prevention” Plan as required under the submittal register. The work plan shall address the specific hazards on the job-site per EM-385-1-1 and NFPA 241, Chapter 5.1.
EM 385-1-1 Appendix A illustrates typical content for the Accident Prevention Plan (APP).
F. Mobile Equipment Operator List: A list of qualified operators for all mobile equipment that will be brought onto the job site with employee name(s), qualifications and specific equipment to be operated shall be provided to the Contracting Officer prior to equipment operation. (This includes forklifts, cranes, motorized lifting device, etc.)
4.08 DUST CONTROL: Keep dust down at all times, including non-working hours, weekends, and holidays. Sprinkle, or treat with dust suppressors, all dust prone areas of the site and other areas disturbed by operations. No dry power brooming is permitted.
Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing is permitted only for cleaning nonparticulate debris, such as steel reinforcing bars. No sandblasting is permitted unless dust is confined. Only wet cutting of concrete blocks, concrete, and asphalt is permitted.
No unnecessary shaking of bags is permitted where bagged cement, concrete mortar, and plaster is used.
4.09 NOISE: Make the maximum use of "low-noise-emission products" as certified by EPA and described at 40 CFR Part 204. Comply with applicable portions of the Noise Control Act (NCA). The Contractor is responsible for complying with all other federal, state, and local noise control laws and regulations.
PART 2 PRODUCTS
Not Used
01 35 43 – ENVIRONMENTAL PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES: This section applies to all necessary steps taken by the contractor to comply with the environmental protection requirements listed herein.
1.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. ENVIRONMENTAL PROTECTION AGENCY (EPA) REGULATIONS:
40 CFR 122 National Pollution Discharge Elimination System
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
B. U.S. DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) REGULATIONS:
29 CFR 1910.120 Hazardous Waste Operations
C. U. S. DEPARTMENT OF TRANSPORTATION REGULATIONS:
49 CFR 100-199 Hazardous Materials Transportation, Handling, and Storage Regulations
1.03 REFERENCE STATUTES: The statutes listed below form a part of this specification to the extent referenced.
Clean Air Act (CAA) (42 U.S.C. §§ 7401 to 7642)
Clean Water Act (33 U.S.C. §§ 1251 to 1387)
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) (42 U.S.C. §§ 9601 to 9675)
Federal Water Pollution Control Act (CWA) (33 U.S.C. §§ 1251)
Toxic Substance Control Act (TSCA) (15 U.S.C. §§ 2601 to 2654)
Resource Conservation and Recovery Act (RCRA) (42 U.S.C. §§ 6901 to 6991i)
1.04 ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain environmental protection during the life of the Contract to control pollution or to correct conditions that develop during demolition. Comply with all Federal, State, and local laws and regulations pertaining to water, air, soil, and noise pollution.
1.05 PROTECTION OF NATURAL RESOURCES
A. Preserve the natural resources within the project boundaries and outside the limits of permanent work performed under this Contract in their existing condition or restore to an equivalent or improved condition upon completion of the work. Repair or restore to original condition all trees or other landscape features scarred or damaged by equipment or operations. Obtain Contracting Officer's approval before repair or restoration.
Confine construction activities to areas defined by the work schedule, drawings, and specifications. Federal Acquisition Regulation clause 52.236-9 applies.
B. Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without special written permission from the Contracting Officer. Protect existing trees which may be damaged by construction operations.
C. Construction equipment is to be kept in good repair, without leaks of hydraulic or lubricating fluids. If such leaks or drips do occur, they shall be cleaned up immediately. Drip pans shall be utilized when vehicles are parked. Confine equipment maintenance and/or repair to one location. Control runoff in this area to prevent contamination of soils and water.
D. At or before contract completion, obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and all other vestiges of construction. Temporary roads, parking areas, staging areas, and similar temporary use areas where excavation has been accomplished shall be graded in conformance with surrounding areas. Restore all disturbed areas to their original condition.
1.06 EROSION AND SEDIMENT CONTROL MEASURES:
A. Borrow pits are not permitted on Government property.
B. Provide necessary controls to prevent visible or measurable erosion from leaving the construction site.
C. Provide temporary protection for erodible soils. Employ methods such as mechanical retardation, sediment basins, or vegetation and mulch. All earthwork brought to final grade shall be immediately finished as indicated or specified. Plan and conduct all earthwork to minimize duration of exposure of unprotected soils. In no case shall soil stabilization measures be delayed more than 14 days following temporary or permanent ceasing of construction activity in that portion of the site. Inspect erosion control measures at least weekly, and on a daily basis during rainy periods. Prevent visible or measurable erosion from leaving the construction site.
D. The Contractor shall prepare a Storm Water Pollution Prevention Plan (SWPPP) and submit a Notice of Intent (NOI) together with any necessary sampling and appropriate fee to the California State Water Resources Control Board IAW the California WRCB
GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH
CONSTRUCTION ACTIVITY GENERAL PERMIT) WATER QUALITY ORDER 99-08-
DWQ. The Contractor is required to sign the certification included within that section prior to commencement of any activities on the site to indicate his understanding of the requirements of the Storm Water Pollution Prevention Plan. Copies of all submittals to the WRCB shall also be submitted to the Contracting Officer.
1.07 CONTROL AND DISPOSAL OF WASTES: With the exception of materials specifically indicated or specified to be salvaged for reuse in construction, or turned over to the Government, all wastes and demolished materials become the contractor's property and shall be removed from the job site daily.
1.08 HAZARDOUS WASTE DISPOSAL: Any hazardous or regulated waste generated by work under this contract is the responsibility of the Contractor and shall be disposed of in accordance with all applicable federal, state, and local regulatory requirements. The facility is the generator of record and will provide the EPA ID number and manage manifests. The site environmental manager and HW/HM coordinator is Ms. Kathy Gregory, Environmental Specialist, at Building 10, Engineering Office,
(310) 521-6020. She must approve and sign all manifests. The contractor may leave wastes on site pending analysis for disposal. The wastes will be accumulated at a location designated by the POC. The facility address will be used on each manifest. CEU Oakland shall not appear on any manifest. The Contractor shall arrange and be responsible for the transportation and final disposal of any hazardous waste. Comply with applicable parts of 40 CFR 262.
Any manifest of hazardous waste shall be signed by the Government Hazardous Materials/Hazardous Waste Coordinator at the work site (hereinafter "HM/HW Coordinator"). The Contractor shall contact the HM/HW Coordinator for disposal of any hazardous waste. No contractor or subcontractor shall have the authority to sign a hazardous waste manifest using the facility's EPA generator ID number. Only the HM/HW Coordinator may sign a manifest for hazardous waste.
A. HM/HW Spill Response: Store chemical waste in corrosion resistant containers labeled to identify type of waste and date filled. Comply with 49 CFR 178. Remove containers from Government property and dispose of in accordance with Federal, State, and local regulations. Submit a certified copy of the acceptance receipts for these materials, indicating quantities.
For oil and hazardous material spills which may be large enough to violate Federal, State, and local regulations, notify the Contracting Officer immediately.
B. Dispose of petroleum products and petroleum contaminated soil and water in accordance with procedures meeting Federal, State, and local regulations. Comply with 40 CFR 761 for removal and disposal of PCB containing articles.
C. Comply with 40 CFR 262 and 263, 29 CFR 1910.120, and state regulations for removal, transportation and disposal of hazardous waste as discussed in the Contractor's HM/HW Handling Plan.
PART 2 PRODUCTS
Not Used
DIVISION 32 – EXTERIOR IMPOVEMENTS
32 01 11.51 – PAINT REMOVAL
PART 1 GENERAL
1.01 SECTION INCLUDES: Removal of existing painted and black painted traffic Markings and parking stripes around Coast Guard Island.
As shown on attached maps.
1.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and
Health Standards
1.03 MECHANICAL REMOVAL EQUIPMENT:
A. Mechanical removal equipment includes waterblasting, grinding or scarifying, uses of black paint or any approved non-chemical systems. Control the equipment used on asphalt or tar concrete to remove paint that accumulations while minimizing disturbances to asphalt. Basic hand tools and the following major types of mechanical equipment are considered acceptable for this project:
1) Waterblasting Equipment
2) Grinding or Scarifying Equipment
3) Black paint
B. WATERBLASTING EQUIPMENT: Provide mobile waterblasting equipment capable of producing a pressurizedstream of water that effectively removes paint from thepavement surface without significantly damaging the pavement. Provide equipment, tools, and machinery which are safe and and in good working order at all times. Provide equipment interlocks to prohibit high pressure water discharge when the vehicle or cleaning head is stationary (not moving forward or side to side)
C. Grinding or Scarifying Equipment: Provide equipment capable of removing surface contaminates, paint build-up, or extraneous markings from the pavement surface without leaving any residue. If a weed torch is used to remove paint, the surface must be cleaned by hydro blast afterwards to remove surface contaminates and ash.
D. WATER: Water to be used for high-pressure water equipment will be made available from Government hydrants. That is closest to work locations at no cost to the Contractor. Furnish equipment and labor for delivery of water from the hydrant to the job site is the contractor’s responsibility. Notify the Contracting Officer on location of fire hydrant[s] to be used and the respective times of use. The Contractor must provide and use a backflow prevention device for filling water tanks. The Contractor is responsible for testing, treating, and filtering the water to ensure it will not interfere with the rubber removal or damage or clog the rubber removal equipment. Contractor will also need to capture and remove all the water and debris to insure that nothing enters the storm drain system.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
3.01 PAINT REMOVAL:
A. The pavement surface type is asphalt mixture.
B. Remove 95 percent of all paint on asphalt pavement. Remove all paint that is loose, flaking, chalky, or not to be re-marked or does not comply with size or pattern standards.
C. Exercise close control of water pressure and blasting time/duration to prevent damage to joints, existing markings that are not intended for removal, or the wearing surface
D. After approval of the Contractor's operations by the Contracting Officer, the cleaned sample area will become the standard for rubber
E. Contractor shall provide lighted barricades and warning signs for any open holes.
3.02 WATER PRESSURE: Provide water pressure impact upon the indicated pavement areas sufficient to remove the designated paint to the required degree of removal without damaging the existing pavement. The Contractor is responsible for repairing any damage caused by the removal work.
3.03 CLEANUP AND WASTE DISPOSAL: Keep the worksite clean of by-products, debris and waste from paint removal operations. Perform cleanup operations continuously. Remove all residue from the pavement. Obtain the approval of residue removal and disposal method from the Contracting Officer prior to beginning work.
Submit a Waste Collection, Identification and Disposal Plan describing proposed actions regarding waste collection, control, identification, and disposal to the Contracting Officer's Representative for approval prior to the start of work. The plan will address disposal methods and requirements for hazardous and non-hazardous wastes.
3.04 DAMAGE REPAIR: Repair any damage to the pavement surface, joint, joint and crack seals, or other Government property caused during the performance of the work at the Contractor's expense. Submit a repair plan to include methods and material to the Contracting Officer's Representative for approval prior to performance of the repairs. Complete the repairs within the performance period of the Contract.
32 17 23 – PAVEMENT MARKINGS
PART 1 GENERAL
1.01 SECTION INCLUDES: This section applies to all work required for remarking of the repaved parking areas and roadways.
1.02 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
A. CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD
SPECIFICATIONS, May 2006
Section 84 Traffic Stripes and Pavement
Markings
B. FEDERAL STANDARDS (FED STD)
595 Colors
C. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) FOR STREETS AND
HIGHWAYS, 2003
Part 3 Markings
D. UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS)
Section 4.6 Parking and Passenger Loading Zones
1.03 SUBMITTALS:
A. Striping, Markings, and Parking Layout: On-site work shall not begin until a drawing of the existing striping, markings, and parking spaces has been approved.
B. Certificate of Compliance:
1) Striping Paint
PART 2 PRODUCTS
2.01 GENERAL: All materials furnished for pavement marking shall meet the requirements of CALTRANS Section 84 and shall be applied according to manufacturer’s recommendations.
2.02 PAINT FOR STRIPING: Rapid dry, water borne, white and yellow, in accordance with CALTRANS Section 84.
2.03 PAINT FOR HANDICAP SYMBOL: Handicap symbol shall consist of a white figure on a blue background. Color shall be in accordance with the Federal Standard 595A. Colors: Blue #15090.
3.01 SURFACE PREPARATION: Remove contaminants from new asphalt concrete surfaces that may adversely affect the installation of the pavement markings by sandblasting, shot-blasting, or sweeping. Air blast the pavement with a high-pressure system to remove extraneous or loose material. Apply pavement marking materials to new asphalt concrete that is sufficiently cured according to the manufacturer’s recommendations and in accordance with CALTRANS Section 84.
3.02 STRIPING AND MARKINGS: Re-stripe newly paved parking areas and roadways in accordance with CALTRANS Section 84, UFAS 4.6, and MUTCD 3. All existing striping and markings shall be reapplied;
match existing parking layout in accordance with the parking layout submittal specified in paragraph 1.03A.
3.03 CURING OF MATERIAL: Rate the line, markings, and pavement marker adhesive at the time of installation and 14 calendar days after placement to determine if the material has properly cured.
| TABLE OF CONTENTS |
| DIVISION 01 - GENERAL REQUIREMENTS |
| 01 10 00 - GENERAL PARAGRAPHS |
| 01 33 00 – SUBMITTALS PROCEDURES |
| 01 35 29 – HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES |
| 01 35 43 – ENVIRONMENTAL PROCEDURES |
| DIVISION 32 – EXTERIOR IMPOVEMENTS |
| 32 01 11.51 – PAINT REMOVAL |
| 32 17 23 – PAVEMENT MARKINGS |